|
1 |
Application of probabilistic VE/LCC Analysis Models for Quay Wall Structures
Ahn, Jong-Pil;Lee, Cheung-Bin;Park, Ju-Won;Yu, Deog-Chan;
/
Korea Institute of Construction Engineering and Management
, v.8, no.5, pp.71-79,
|
|
2 |
Development of the Work Information Management System of Pavement Crack Sealing
Byun, Woong-Ho;Oh, Se-Wook;Lee, Hyun-Jung;Kim, Young-Suk;
/
Korea Institute of Construction Engineering and Management
, v.8, no.5, pp.80-91,
|
|
3 |
Item Establishment and Importance Analysis for Qualitative VFM of BTL System
Yang, Jin-Kook;Ri, Min-Hyeon;Kim, Soo-Yong;
/
Korea Institute of Construction Engineering and Management
, v.8, no.5, pp.92-100,
|
|
4 |
A Study on the Minimization of Problems of the Direct Payment for Subcontractor's Work in Public Construction Project
Cho, Young-Jun;
/
Korea Institute of Construction Engineering and Management
, v.8, no.5, pp.101-108,
|
|
5 |
Establishing the Education Strategy in strengthening Construction Management's ability in Large-scaled Construction Company
Kim, Sang-Chul;Park, Chan-Jeong;Lee, Sang-Youb;Son, Jae-Ho;
/
Korea Institute of Construction Engineering and Management
, v.8, no.5, pp.109-118,
|
|
6 |
Analyzing Characteristics of Design-Build Delivery System in Korea Using System Dynamics Modeling
Lee, Hyun-Soo;Ji, Sae-Hyun;Park, Moon-Seo;Song, Sang-Hun;
/
Korea Institute of Construction Engineering and Management
, v.8, no.5, pp.119-131,
|
|
7 |
Development of Maintenance Management System Module in BTL Project for Educational Facilities
Lee, Eun-Dong;Son, Jae-Ho;Kim, Jae-On;
/
Korea Institute of Construction Engineering and Management
, v.8, no.5, pp.132-141,
|
|
8 |
Economical Analysis and Estimate Method of Possible Working Hours for Marine Rock Excavation Work Regarding the Tide Cycle
Kwon, Soon-Boum;Ock, Jong-Ho;Lee, Seung-Hyun;
/
Korea Institute of Construction Engineering and Management
, v.8, no.5, pp.142-151,
|
|
9 |
A Development of the Risk Factor Dictionary for the Private Finance Construction Project
Kim, Seon-Gyoo;
/
Korea Institute of Construction Engineering and Management
, v.8, no.5, pp.152-160,
|
|
10 |
Supply-Demand Forecasting of Principal Engineers in Construction Industry Using System Dynamics
Kim, Sung-Tae;Lee, Hyun-Soo;An, Sun-Ju;Ryu, Han-Guk;Park, Moon-Seo;
/
Korea Institute of Construction Engineering and Management
, v.8, no.5, pp.161-172,
|
|
11 |
Strategy for Expansion of Overseas Construction Competitive Power by Official Development Assistance(ODA)
Choi, Jin-Wook;Kim, Jae-Jun;Lee, Han-Seung;Jeon, Rak-Keun;
/
Korea Institute of Construction Engineering and Management
, v.8, no.5, pp.173-181,
|
|
12 |
The Deduction of the Success Factor in Construction Projects by Design Build Methods
Lee, Chi-Joo;Kim, Sang-Ki;Kim, Jae-Jun;
/
Korea Institute of Construction Engineering and Management
, v.8, no.5, pp.182-190,
|
|
13 |
Prediction Model of Final Project Cost using Multivariate Probabilistic Analysis (MPA) and Bayes' Theorem
Yoo, Wi Sung;Hadipriono, FAbian C.;
/
Korea Institute of Construction Engineering and Management
, v.8, no.5, pp.191-200,
|
|