Browse > Article List

논문
1 Performance Evaluation of Road Stripe Removing Equipment Using High Pressure Water-Jet
Han, Jae-Goo;Kwon, Soon-Wook;Kim, Kyoon-Tai; / Korea Institute of Construction Engineering and Management , v.7, no.6, pp.79-89,
2 A Suggestion for Design Process Improvement to Develop a Design Management Model
Bae, Jeung-Ik;Shin, Jae-Won;Kwon, O-Kyung; / Korea Institute of Construction Engineering and Management , v.7, no.6, pp.90-98,
3 Empirical Study on the Validity of Construction Bond-related Litigations
Kim, Jong-Seo;Choi, Jong-Soo;Lee, Jae-Seob; / Korea Institute of Construction Engineering and Management , v.7, no.6, pp.99-111,
4 Development of the Tool for Evaluating Construction Waste Management Performance
Kim, Jee-Hye;Kim, Jae-Moon;Cha, Hee-Sung;Shin, Dong-Woo; / Korea Institute of Construction Engineering and Management , v.7, no.6, pp.112-120,
5 Improvement of Concessionaire Designation Evaluation Criteria for Build-Transfer-Lease Private Participation in Infrastructure Projects
Shin, Hyun-In;Park, Tae-Keun; / Korea Institute of Construction Engineering and Management , v.7, no.6, pp.121-131,
6 Diagnostic Analysis and Influential Factors of CM Fee Estimation
Yoo, Byeong-Gi;Jung, Chan-Young;Kim, Jae-Jun; / Korea Institute of Construction Engineering and Management , v.7, no.6, pp.132-140,
7 Operating model for A Value-For-Money evaluation of BTL Projects for Educational Facilities
Son, Ki-Young;Kim, Jang-Young;Kook, Dong-Hoon;Kim, Sun-Kuk; / Korea Institute of Construction Engineering and Management , v.7, no.6, pp.141-150,
8 Development of an Automated Pavement Crack Sealing Machine and Its Economic Feasibility Analysis
Lee, Jeong-Ho;Lee, Jun-Bok;Jeong, Hyung-Hoon;Kim, Young-Suk; / Korea Institute of Construction Engineering and Management , v.7, no.6, pp.151-164,
9 Constitution of Work Process for the Remodeling Construction Project in Planning Phase
Kwon, Won;Chun, Jae-Youl; / Korea Institute of Construction Engineering and Management , v.7, no.6, pp.165-174,
10 A Sludge Collector Selection Model by Life Cycle Cost Analysis
Lee, Seung-Hoon;Woo, Yu-Mi;Lee, Sung-Rak;Koo, Kyo-Jin;Hyun, Chang-Taek;Hong, Tae-Hoon; / Korea Institute of Construction Engineering and Management , v.7, no.6, pp.175-184,
11 An Empirical analysis of the Effect of Variables on Maintenance Expenses of Public Rental Housing
Kang, Hyun-Kyu;Han, Choong-Hee; / Korea Institute of Construction Engineering and Management , v.7, no.6, pp.185-192,
12 Improvement Plan for the Payment Standard of Rental Fee in Construction New Technology
Park, Hwan-Pyo;Oh, Un-O; / Korea Institute of Construction Engineering and Management , v.7, no.6, pp.193-201,
13 Quantitative Analysis of Magnitude of Rework by Project Types and Sources of Rework
Hwang, Bon-Gang; / Korea Institute of Construction Engineering and Management , v.7, no.6, pp.202-211,