|
1 |
Selection of a Probability Distribution for Modeling Labor Productivity during Overtime
Woo, Sung-Kwon;
/
Korea Institute of Construction Engineering and Management
, v.6, no.1, pp.49-57,
|
|
2 |
The Estimation of Non-Working days for the Construction Project in Incheon Region
Shin Jong-Hyun;Lee Jin-Ah;Lee Chan-Sik;
/
Korea Institute of Construction Engineering and Management
, v.6, no.1, pp.58-64,
|
|
3 |
Composing Technology of Irregular Triangulate Network by Object Attribute in 4D System for Civil Engineering Project
Kang Leen-Seok;Jee Sang-Bok;Kwak Joong-Min;
/
Korea Institute of Construction Engineering and Management
, v.6, no.1, pp.65-72,
|
|
4 |
Stochastic Project Scheduling Simulation System (SPSS III)
Lee Dong-Eun;
/
Korea Institute of Construction Engineering and Management
, v.6, no.1, pp.73-79,
|
|
5 |
The Correlation Factors on the Analysis of Demand Factors for Apartments
Yang Seung-Won;Park Keun-Joon;
/
Korea Institute of Construction Engineering and Management
, v.6, no.1, pp.80-88,
|
|
6 |
Development of Performance Analysis System for Construction Projects Using Data Warehousing Technology
Yu Jung-Ho;Song Sang-Hoon;You Won-Hee;Lee Hyun-Soo;
/
Korea Institute of Construction Engineering and Management
, v.6, no.1, pp.89-98,
|
|
7 |
A Study on the Necessity and Applicability of Interactive Electronic Technical Manual(IETM) for Construction Projects
Kang, Leen-Seok;Jung, Won-Myung;Kwak, Joong-Min;
/
Korea Institute of Construction Engineering and Management
, v.6, no.1, pp.99-108,
|
|
8 |
The Process Model for Project Management of Design-Build System and Constitution of Database
Chun Jae-youl;
/
Korea Institute of Construction Engineering and Management
, v.6, no.1, pp.109-116,
|
|
9 |
A Study of the Improvements of Computer and Information Technology Educational Programs for Architectural Engineering Students
Kim Chan-Kyu;
/
Korea Institute of Construction Engineering and Management
, v.6, no.1, pp.117-124,
|
|
10 |
Construction Cost-Down of Building Substructure by VE Techniques
Kim Sun-Kuk;Heo Seong-Soo;Choi Yoon-Ki;
/
Korea Institute of Construction Engineering and Management
, v.6, no.1, pp.125-132,
|
|
11 |
A Study on the method how to build up technological strength in the domestic construction industry competing with foreign foremost construction firms.
Choi Yoon-Ki;
/
Korea Institute of Construction Engineering and Management
, v.6, no.1, pp.133-139,
|
|
12 |
Development of PDA and Web-based System for Quality Inspection and Defect Management of Apartment Housing Project
Oh Se-Wook;Kim Young-Suk;
/
Korea Institute of Construction Engineering and Management
, v.6, no.1, pp.140-150,
|
|
13 |
Analyzing the Technical Efficiency of Korean Engineering and Construction Firms after the Financial Crisis
Kim, Kon-Shik;
/
Korea Institute of Construction Engineering and Management
, v.6, no.1, pp.151-161,
|
|
14 |
Improvement of contract sum adjustment method caused by price fluctuation using construction cost index
Cho Hun-Hee;Doe Geun-Young;
/
Korea Institute of Construction Engineering and Management
, v.6, no.1, pp.162-168,
|
|
15 |
A Study on the Problem Analysis and Improvements of Long-Term Maintenance for the Permanent Rental Housing in Korea
Lee Hee-Chang;Kim Yong-Su;
/
Korea Institute of Construction Engineering and Management
, v.6, no.1, pp.169-176,
|
|
16 |
The Development of Schedule Risk Management Tools at the Preconstruction Phase in Building Construction - Focused on the Steel Work -
Suh Sang-Wook;Yoon You-Sang;Kim Sun-Kook;
/
Korea Institute of Construction Engineering and Management
, v.6, no.1, pp.177-185,
|
|
17 |
A Study on Improvements of Regulation for the Preventing Commercial Disputes Related to Adjustment of Subcontract Price
Min Byeong-Uk;Lee Jong-Gwang;Kim Yong-Su;
/
Korea Institute of Construction Engineering and Management
, v.6, no.1, pp.186-194,
|
|
18 |
A Study on the Framework of the Continuous Improvement Model of Construction Process using Construction Failure Information
Jeon Yong-Seok;Park Chan-Sik;
/
Korea Institute of Construction Engineering and Management
, v.6, no.1, pp.195-204,
|
|
19 |
The Study on Analysis of the Claim Elements for Preventing the Potential Claim in a Large-Scale Turnkey-Base Building Project - Focused on Cases of Domestic Project -
Yoon Jun-Seon;
/
Korea Institute of Construction Engineering and Management
, v.6, no.1, pp.205-211,
|
|
20 |
A Study on the Progress Measurement Method using Percent Complete of Work and Labor Productivity - Focusing on Structural Works of Apartment Construction -
Choi Hyun-Ha;Lee Junbok;
/
Korea Institute of Construction Engineering and Management
, v.6, no.1, pp.212-219,
|
|