Browse > Article List

논문
1 Selection of a Probability Distribution for Modeling Labor Productivity during Overtime
Woo, Sung-Kwon; / Korea Institute of Construction Engineering and Management , v.6, no.1, pp.49-57,
2 The Estimation of Non-Working days for the Construction Project in Incheon Region
Shin Jong-Hyun;Lee Jin-Ah;Lee Chan-Sik; / Korea Institute of Construction Engineering and Management , v.6, no.1, pp.58-64,
3 Composing Technology of Irregular Triangulate Network by Object Attribute in 4D System for Civil Engineering Project
Kang Leen-Seok;Jee Sang-Bok;Kwak Joong-Min; / Korea Institute of Construction Engineering and Management , v.6, no.1, pp.65-72,
4 Stochastic Project Scheduling Simulation System (SPSS III)
Lee Dong-Eun; / Korea Institute of Construction Engineering and Management , v.6, no.1, pp.73-79,
5 The Correlation Factors on the Analysis of Demand Factors for Apartments
Yang Seung-Won;Park Keun-Joon; / Korea Institute of Construction Engineering and Management , v.6, no.1, pp.80-88,
6 Development of Performance Analysis System for Construction Projects Using Data Warehousing Technology
Yu Jung-Ho;Song Sang-Hoon;You Won-Hee;Lee Hyun-Soo; / Korea Institute of Construction Engineering and Management , v.6, no.1, pp.89-98,
7 A Study on the Necessity and Applicability of Interactive Electronic Technical Manual(IETM) for Construction Projects
Kang, Leen-Seok;Jung, Won-Myung;Kwak, Joong-Min; / Korea Institute of Construction Engineering and Management , v.6, no.1, pp.99-108,
8 The Process Model for Project Management of Design-Build System and Constitution of Database
Chun Jae-youl; / Korea Institute of Construction Engineering and Management , v.6, no.1, pp.109-116,
9 A Study of the Improvements of Computer and Information Technology Educational Programs for Architectural Engineering Students
Kim Chan-Kyu; / Korea Institute of Construction Engineering and Management , v.6, no.1, pp.117-124,
10 Construction Cost-Down of Building Substructure by VE Techniques
Kim Sun-Kuk;Heo Seong-Soo;Choi Yoon-Ki; / Korea Institute of Construction Engineering and Management , v.6, no.1, pp.125-132,
11 A Study on the method how to build up technological strength in the domestic construction industry competing with foreign foremost construction firms.
Choi Yoon-Ki; / Korea Institute of Construction Engineering and Management , v.6, no.1, pp.133-139,
12 Development of PDA and Web-based System for Quality Inspection and Defect Management of Apartment Housing Project
Oh Se-Wook;Kim Young-Suk; / Korea Institute of Construction Engineering and Management , v.6, no.1, pp.140-150,
13 Analyzing the Technical Efficiency of Korean Engineering and Construction Firms after the Financial Crisis
Kim, Kon-Shik; / Korea Institute of Construction Engineering and Management , v.6, no.1, pp.151-161,
14 Improvement of contract sum adjustment method caused by price fluctuation using construction cost index
Cho Hun-Hee;Doe Geun-Young; / Korea Institute of Construction Engineering and Management , v.6, no.1, pp.162-168,
15 A Study on the Problem Analysis and Improvements of Long-Term Maintenance for the Permanent Rental Housing in Korea
Lee Hee-Chang;Kim Yong-Su; / Korea Institute of Construction Engineering and Management , v.6, no.1, pp.169-176,
16 The Development of Schedule Risk Management Tools at the Preconstruction Phase in Building Construction - Focused on the Steel Work -
Suh Sang-Wook;Yoon You-Sang;Kim Sun-Kook; / Korea Institute of Construction Engineering and Management , v.6, no.1, pp.177-185,
17 A Study on Improvements of Regulation for the Preventing Commercial Disputes Related to Adjustment of Subcontract Price
Min Byeong-Uk;Lee Jong-Gwang;Kim Yong-Su; / Korea Institute of Construction Engineering and Management , v.6, no.1, pp.186-194,
18 A Study on the Framework of the Continuous Improvement Model of Construction Process using Construction Failure Information
Jeon Yong-Seok;Park Chan-Sik; / Korea Institute of Construction Engineering and Management , v.6, no.1, pp.195-204,
19 The Study on Analysis of the Claim Elements for Preventing the Potential Claim in a Large-Scale Turnkey-Base Building Project - Focused on Cases of Domestic Project -
Yoon Jun-Seon; / Korea Institute of Construction Engineering and Management , v.6, no.1, pp.205-211,
20 A Study on the Progress Measurement Method using Percent Complete of Work and Labor Productivity - Focusing on Structural Works of Apartment Construction -
Choi Hyun-Ha;Lee Junbok; / Korea Institute of Construction Engineering and Management , v.6, no.1, pp.212-219,