|
1 |
A Comparative Analysis of the Classification System for Three-Dimensional Concrete Printers
Chung, Jihoon;Lee, Ghang;Kim, Jung-Hoon;Choi, Jaejin;
/
Korea Institute of Construction Engineering and Management
, v.21, no.2, pp.3-14,
|
|
2 |
Analysis on Research Trend of Productivity Using Text Mining - Focusing on KSCE Journal -
Gu, Bongil;Huh, Youngki;
/
Korea Institute of Construction Engineering and Management
, v.21, no.2, pp.15-21,
|
|
3 |
Problems and Solutions for Securing Fire Resistance Performance in Fire Protection doors
Kim, Juseong;Kim, Siwon;Cho, Youngduk;Kim, Jaejun;
/
Korea Institute of Construction Engineering and Management
, v.21, no.2, pp.22-29,
|
|
4 |
A Study on the Analysis of Cost Adjustment Scenarios by Bidding Method through Analysis of the Total Project Cost Management Process
Kim, Kyeongbaek;Lee, Gayeoun;Kim, Sangbum;
/
Korea Institute of Construction Engineering and Management
, v.21, no.2, pp.30-38,
|
|
5 |
A Study on Improvement of Occupational Safety and Health Management Cost Accounting Standards
Baek, Yuonghyun;Wee, Kyungsu;Baek, Insoo;Kim, Jaejun;
/
Korea Institute of Construction Engineering and Management
, v.21, no.2, pp.39-46,
|
|
6 |
Improved Model for Index of Construction Engineer's Competency Evaluation System in Domestic Construction Management
Kang, Seongmi;Cha, Minsu;Lee, Woojae;Ji, Woojong;Cho, Hunhee;Yoo, Wisung;
/
Korea Institute of Construction Engineering and Management
, v.21, no.2, pp.47-58,
|
|
7 |
Analysis of Mutual Market Entry Level between General and Specialty Contractors according to Abolishing the Regulation of Business Area
Lee, Chijoo;Kang, Hyeongjoo;Moon, Hyuk;Kim, Minchul;
/
Korea Institute of Construction Engineering and Management
, v.21, no.2, pp.59-69,
|
|
8 |
Identification of Business Process in the Closure Phase of Construction Programs
Lee, Woo-Yeon;Lee, Seung-Hoon;Cha, Yongwoon;Hyun, Chang-Taek;
/
Korea Institute of Construction Engineering and Management
, v.21, no.2, pp.70-78,
|
|
9 |
Evaluation of Capability for Practicing CM at Risk in Korea
Ryu, HanGuk;Lee, Sangwon;Choi, Jaehyun;
/
Korea Institute of Construction Engineering and Management
, v.21, no.2, pp.79-87,
|
|
10 |
Construction Lean Process Development and Application for Field Productivity Improvement
Kim, Yong-pyo;Jeong, Yong-ho;Lee, Min-jae;
/
Korea Institute of Construction Engineering and Management
, v.21, no.2, pp.88-97,
|
|
11 |
Technical Feasibility and Field Applicability Analysis of an All-in-one Attachment-based PHC Pile Head Cutting Robot
Yeom, Dong-Jun;Kim, Jun-Sang;Kim, Young Suk;
/
Korea Institute of Construction Engineering and Management
, v.21, no.2, pp.98-106,
|
|