|
1 |
Proper Estimating Method for Environmental Preservation Cost in Road Projects
Park, Ji-Sun;Lee, Sea-Hyun;
/
Korea Institute of Construction Engineering and Management
, v.13, no.2, pp.3-10,
|
|
2 |
Development of BIM Functions and System for Construction Project Through Project Life Cycle -Focusing on Bridge Construction Project-
Kim, Hyeon-Seung;Moon, Hyoun-Seok;Choi, Gwang-Yeol;Kim, Chang-Hak;Kang, Leen-Seok;
/
Korea Institute of Construction Engineering and Management
, v.13, no.2, pp.11-24,
|
|
3 |
Selection and Strategies of New Leading Businesses in International Construction Market
Choi, Seok-Jin;Lee, Kang-Wook;Han, Seung-Heon;
/
Korea Institute of Construction Engineering and Management
, v.13, no.2, pp.25-36,
|
|
4 |
Policymaking Improvement Strategy for Fine Laboring Ability of Construction Works
Yoon, Tai-Hyong;Lee, Soo-Yong;
/
Korea Institute of Construction Engineering and Management
, v.13, no.2, pp.37-47,
|
|
5 |
An Experimental Study on Quality Control Standards of Exposed Concrete in Construction Stage
Jeong, Jae-Soo;Lee, Chan-Sik;
/
Korea Institute of Construction Engineering and Management
, v.13, no.2, pp.48-57,
|
|
6 |
Value Analysis of Floor Covering Methods Considering the Skid Resistance Performance
Yoon, Cha-Woong;Seol, Jae-Nam;Seo, Jong-Won;
/
Korea Institute of Construction Engineering and Management
, v.13, no.2, pp.58-69,
|
|
7 |
Evaluating and Suggesting Key Risk Factors according to Risk Hierarchy of Occurrence Field in the Overseas Development Projects
Lee, Jeong-Seok;Ahn, Byung-Ju;Kim, Jae-Jun;
/
Korea Institute of Construction Engineering and Management
, v.13, no.2, pp.70-79,
|
|
8 |
An Analysis of Core Competence of Pre-construction Service of the Making Inroads into Oversea Construction Market (*for the Entry in the International Construction Business)
Byun, Il-Woo;Kim, Ye-Sang;
/
Korea Institute of Construction Engineering and Management
, v.13, no.2, pp.80-90,
|
|
9 |
Cost Prediction Model using Qualitative Variables focused on Planning Phase for Public Multi-Housing Projects
Ji, Soung-Min;Hyun, Chang-Taek;Moon, Hyun-Seok;
/
Korea Institute of Construction Engineering and Management
, v.13, no.2, pp.91-101,
|
|
10 |
A Study on Risk Sharing of PPI Project Demand Risk
Shin, Sung-Hwan;
/
Korea Institute of Construction Engineering and Management
, v.13, no.2, pp.102-109,
|
|
11 |
A Study on the Improvement Method for Preventing Lift Stop Position Error using Double Sensor Based Lift Stop Sensing Device
Lee, Jong-Hyun;Kwon, Soon-Wook;Park, Sung-Ung;Lee, Mi-Na;
/
Korea Institute of Construction Engineering and Management
, v.13, no.2, pp.110-119,
|
|
12 |
Schedule Computation Method of Two-way Multiple Overlapping Relationships on BDM Technique
Kim, Seon-Gyoo;Noh, Seong-Beom;Lee, Yong-Hyun;Yu, Young-Jeong;Kim, Jin-Bong;Koo, Jae-Oh;
/
Korea Institute of Construction Engineering and Management
, v.13, no.2, pp.120-127,
|
|
13 |
A Study on Relationship between House Rental Price and Macroeconomic Variables
Kim, Hyun-Woo;Chin, Kyung-Ho;Lee, Kyo-Sun;
/
Korea Institute of Construction Engineering and Management
, v.13, no.2, pp.128-136,
|
|
14 |
A Study on Factors Influencing Turnover Intention of New Employees in Construction Company
Lee, Hyun-Soo;Jin, Feng-Ji;Park, Moon-Seo;
/
Korea Institute of Construction Engineering and Management
, v.13, no.2, pp.137-146,
|
|
15 |
The Analysis of the Major Cost-increasing Risk Factors from the Perspective of Construction Management -Focusing on Pre-construction Phases-
Kim, Byung-Yong;Kim, Yea-Sang;
/
Korea Institute of Construction Engineering and Management
, v.13, no.2, pp.147-155,
|
|