|
1 |
Development of Safety Management Index for Contractor Assessment in Bidding Process
Ji, Soung-Min;Koo, Kyo-Jin;Hyun, Chang-Taek;
/
Korea Institute of Construction Engineering and Management
, v.12, no.6, pp.3-13,
|
|
2 |
A Proposal for Optimizing Unit Modular System Process to Improve Efficiency in Off-site Manufacture, Transportation and On-site Installation
Lee, Kwang-Bok;Kim, Kyung-Rai;Shin, Dong-Woo;Cha, Hee-Sung;
/
Korea Institute of Construction Engineering and Management
, v.12, no.6, pp.14-21,
|
|
3 |
Safety Management of the Retaining Wall Using USN Sonar Sensors
Moon, Sung-Woo;Choi, Eun-Gi;Hyun, Ji-Hun;
/
Korea Institute of Construction Engineering and Management
, v.12, no.6, pp.22-30,
|
|
4 |
An Administration Model for Causes of Delay in Construction Projects to Decide Time Extension Responsibility
Kim, Jong-Han;Kim, Kyung-Rai;Han, Ju-Yeoun;
/
Korea Institute of Construction Engineering and Management
, v.12, no.6, pp.31-41,
|
|
5 |
A Study on the Development of Work-Crew based Daily-Productivity for Representative B.O.Q Item in Road Project
Seo, Ji-Hyeong;Park, Hyung-Keun;
/
Korea Institute of Construction Engineering and Management
, v.12, no.6, pp.42-53,
|
|
6 |
The Concept of Schedule and Cost Progress Integrated Management on the BDM Network
Kim, Seon-Gyoo;Lee, Yong-Hyun;Noh, Seong-Beom;Ko, Dae-Gyu;
/
Korea Institute of Construction Engineering and Management
, v.12, no.6, pp.54-64,
|
|
7 |
A Study on the Construction Cost Risk through Analyzing the Actual Cost of Public Apartment
Yoon, Woo-Sung;Go, Seong-Seok;
/
Korea Institute of Construction Engineering and Management
, v.12, no.6, pp.65-78,
|
|
8 |
An Index for Measuring the Degree of Completeness of BIM-based Quantity Take-Off
Lee, Chang-Hee;Kim, Seong-Ah;Chin, Sang-Yoon;
/
Korea Institute of Construction Engineering and Management
, v.12, no.6, pp.79-92,
|
|
9 |
Identification of Core Competencies of Construction Managers
Kim, Dong-Hee;Kim, Han-Soo;
/
Korea Institute of Construction Engineering and Management
, v.12, no.6, pp.93-100,
|
|
10 |
Multi-family Housing Complex Breakdown Structure for Decision Making on Rehabilitation
Hong, Tae-Hoon;Kim, Hyun-Joong;Koo, Choong-Wan;Park, Sung-Ki;
/
Korea Institute of Construction Engineering and Management
, v.12, no.6, pp.101-109,
|
|
11 |
Prediction Model for Gas-Energy Consumption using Ontology-based Breakdown Structure of Multi-Family Housing Complex
Hong, Tae-Hoon;Park, Sung-Ki;Koo, Choong-Wan;Kim, Hyun-Joong;Kim, Chun-Hag;
/
Korea Institute of Construction Engineering and Management
, v.12, no.6, pp.110-119,
|
|
12 |
An Algorithm for Hoisting Time Calculation in Super-tall Building Construction
Cho, Chang-Yeon;Shin, Yoon-Seok;Won, Seo-Kyung;Kim, Jung-Yeol;Cho, Moon-Young;
/
Korea Institute of Construction Engineering and Management
, v.12, no.6, pp.120-129,
|
|
13 |
Object Detection From 3D Terrain Data Gener Ated by Laser Scanner of Intelligent Excavating System(IES)
Yoo, Hyun-Seok;Park, Ji-Woon;Choi, Youn-Nyung;Kim, Young-Suk;
/
Korea Institute of Construction Engineering and Management
, v.12, no.6, pp.130-141,
|
|
14 |
Comparative Analysis on Repairing Cost of Lawsuit on Concrete Crack Defect in Apartment Building
Kim, Beop-Su;Park, Jun-Mo;Choi, Jeong-Hyun;Seo, Deok-Seok;Kim, Ok-Kyue;
/
Korea Institute of Construction Engineering and Management
, v.12, no.6, pp.142-150,
|
|
15 |
A Study on Optimizing of Roof-Top Photovoltaic Arrays Arrangement Based on Three-Dimensional Geo-Spatial Information
Kim, Se-Jong;Koo, Kyo-Jin;
/
Korea Institute of Construction Engineering and Management
, v.12, no.6, pp.151-159,
|
|
16 |
An Analysis on the Pre-Feasibility Evaluation Factors of Activation for Welfare Facilities for the Residents in Apartment Building
Kim, Young-Hoon;Kang, Hyun-Wook;Won, Yoo-Man;Kim, Yong-Su;
/
Korea Institute of Construction Engineering and Management
, v.12, no.6, pp.160-167,
|
|