|
1 |
Evaluation of Hydration Heat of Mass Concrete with Capsulated Slurry PCM and FEM Study for Analyzing Thermal Crack
Park, ChangGun;Kim, Bo-Hyun;Lee, Han-Seung;
/
The Korean Institute of Building Construction
, v.14, no.5, pp.379-388,
|
|
2 |
Influences of Slag Replacement on the Properties of Shotcrete Using a Slurry-Type Set Accelerator
Kim, Hyunwook;Moon, Hoon;Kim, Ji-Hyun;Chung, Chul-Woo;
/
The Korean Institute of Building Construction
, v.14, no.5, pp.389-396,
|
|
3 |
Anti-Corrosion Property of Geopolymer Evaluated by an Impressed Current Cathodic Protection Method, Exposed to Marine Environment
Lee, Hae-Seung;Cho, Ggu-Hwan;Park, Dong-Cheon;
/
The Korean Institute of Building Construction
, v.14, no.5, pp.397-405,
|
|
4 |
Method to Select Tower Cranes Using Augmented Reality in Smart Devices
Ryu, Han-Guk;Choi, Heebok;Jang, Myung-Houn;
/
The Korean Institute of Building Construction
, v.14, no.5, pp.407-413,
|
|
5 |
Presumption Method for Optimum Correction Rate of Total Construction Cost Using the Median based on Historical Data Analysis in Public Office Buildings
Yim, Jin-Ho;Park, Jun-Mo;Kim, Ok-Kyue;
/
The Korean Institute of Building Construction
, v.14, no.5, pp.415-422,
|
|
6 |
Economic Analysis of Geothermal Energy Facilities Applied to Public Buildings
Jang, Young Jun;Kim, Sangyong;Shin, Yoonseok;Kim, Gwang-Hee;
/
The Korean Institute of Building Construction
, v.14, no.5, pp.423-432,
|
|
7 |
Hybrid Prototype of Performance and Prescriptive Specifications in Curtain Wall Construction
Lee, Jun-Ho;Cho, Dong-Hyun;Koo, Kyo-Jin;
/
The Korean Institute of Building Construction
, v.14, no.5, pp.433-442,
|
|
8 |
Analysis of Effect of Risk Factors on the Success of Risk Management
Chung, Yeon-Kyo;Chung, Byeong-Hwa;
/
The Korean Institute of Building Construction
, v.14, no.5, pp.443-449,
|
|
9 |
Improving the Safety Awareness of Construction Workers
Zhang, Zhen;An, Sung-Hoon;
/
The Korean Institute of Building Construction
, v.14, no.5, pp.451-457,
|
|
10 |
Interaction Analysis between Construction Business Indicators and Business Performance Indicators of Specialty Contractors providing Heavy Equipment
Kim, Nam-Sik;Lee, Dong Wook;
/
The Korean Institute of Building Construction
, v.14, no.5, pp.459-465,
|
|
11 |
Developing an Optimized Scheduling Process Model for Controlling the Noise in Construction Field
Lee, Seung-Hak;Son, Jea-Ho;Lee, Seung-Hyun;
/
The Korean Institute of Building Construction
, v.14, no.5, pp.467-476,
|
|
12 |
Study on Improvement of Cost Calculation Method in Construction less than One Day Workload
Shin, Dae-Woong;Lee, Young-Do;Shin, Yoonseok;Kim, Gwang-Hee;Yoo, Sangrok;Park, Wonjun;
/
The Korean Institute of Building Construction
, v.14, no.5, pp.477-485,
|
|
13 |
Construction Application of a Newly Developed Form-Latticed Prefabricated Steel Reinforced Concrete Column
Baek, Hojin;Lee, Seung-Hwan;Kim, Sooyoung;
/
The Korean Institute of Building Construction
, v.14, no.5, pp.487-495,
|
|
14 |
An Study on the Element Technologies of BIM and Importance Analysis of Them through Technology Development Status Analysis
Kim, Ji-Yun;Lee, Da-Un;Song, A-Reum;Yun, Seok-Heon;
/
The Korean Institute of Building Construction
, v.14, no.5, pp.497-503,
|
|