|
1 |
A Study on the Contact Force between Catenary and Pantograph in Duplicate KTX-II Operation
Kang, Seung-Wook;Kim, Sang-Ahm;Kim, In-Chol;
/
The Korean Society for Railway
, v.6, no.1, pp.1-6,
|
|
2 |
Train Scheduling and Rescheduling In Pakistan
Abid, Malik Muneeb;Khan, Muhammad Babar;
/
The Korean Society for Railway
, v.6, no.1, pp.7-12,
|
|
3 |
Prediction of Life Time of Rail Rubber Pad using Reliability Analysis Method
Park, Dae-Geun;
/
The Korean Society for Railway
, v.6, no.1, pp.13-25,
|
|
4 |
The Preliminary Analysis of Introducing 500 km/h High-Speed Rail in Korea
Lee, Kwang-Sub;Eom, Jin Ki;Lee, Jun;Moon, Dae Seop;
/
The Korean Society for Railway
, v.6, no.1, pp.26-31,
|
|