|
1 |
An Algorithm of Short-Term Load Forecasting
Song Kyung-Bin;Ha Seong-Kwan;
/
The Korean Institute of Electrical Engineers
, v.53, no.10, pp.529-535,
|
|
2 |
Methodology for Estimating the HTS Cable Market Price
Kim Jong-Yul;Lee Seung-Ryul;Yoon Jae-Young;
/
The Korean Institute of Electrical Engineers
, v.53, no.10, pp.536-541,
|
|
3 |
A Fault Location Algorithm for a Transmission Line Using Travelling Waves
Kang Sang-Hee;Kim Jin-Han;
/
The Korean Institute of Electrical Engineers
, v.53, no.10, pp.542-549,
|
|
4 |
A New Algorithm of The Line to Ground Fault Section Isolation & Restoration in Ungrounded Distribution Power System
Choi In. S.;Choi Myeon. S.;Lim Seong. I.;Lee Seung. J.;
/
The Korean Institute of Electrical Engineers
, v.53, no.10, pp.550-555,
|
|
5 |
Parallel Genetic Algorithm-Tabu Search Using PC Cluster System for Optimal Reconfiguration of Distribution Systems
Mun Kyeong-Jun;Song Myoung-Kee;Kim Hyung-Su;Kim Chul-Hong;Park June Ho;Lee Hwa-Seok;
/
The Korean Institute of Electrical Engineers
, v.53, no.10, pp.556-564,
|
|
6 |
Bus Reconfiguration Strategy Based on Local Minimum Tree Search for the Event Processing of Automated Distribution Substation
Ko Yun-Seok;
/
The Korean Institute of Electrical Engineers
, v.53, no.10, pp.565-572,
|
|
7 |
A Study on the Constrained Dispatch Scheduling Using Linear Programming for TWBP
Kim Gwang Won;Lee Jong-Bae;Jung Jung-Won;
/
The Korean Institute of Electrical Engineers
, v.53, no.10, pp.573-580,
|
|