|
1 |
R&D in Modular Bridges
Lee, Pil-Goo;Park, Chan-Hee;Jung, Eunjin;
/
Korea Concrete Institute
, v.25, no.2, pp.16-20,
|
|
2 |
Construction of Precast Modular Bridges
Lee, Sangyoon;Song, Jaejoon;Lee, Youngho;Kim, Hyeongyeol;
/
Korea Concrete Institute
, v.25, no.2, pp.21-24,
|
|
3 |
Accelerated Construction of Reinforced Concrete High-rise Building Structure
Lee, Hyun-Soo;
/
Korea Concrete Institute
, v.25, no.2, pp.25-28,
|
|
4 |
Reinforcement Method for Shortening the Construction Period of RC Building
Kang, Su-Min;Jin, Jongmin;Lee, Seung-Hwan;Park, Honggun;
/
Korea Concrete Institute
, v.25, no.2, pp.29-33,
|
|
5 |
Lightweight Technology of Building Using Two-way Void Slab for Low-Carbon
Joo, Eun-Hee;Kim, Sang-Mo;Kim, Hyung-Geun;
/
Korea Concrete Institute
, v.25, no.2, pp.34-38,
|
|
6 |
Development of Concrete Technology for Super Long Span Bridge
Kim, Young-Jin;Kim, Sung-Wook;Kim, Sang-Chel;Jung, Sang-Hwa;Choi, Myoung-Sung;
/
Korea Concrete Institute
, v.25, no.2, pp.39-44,
|
|
7 |
A Case Study on RC Core Wall Supported Temporarily by H-Shaped Steel Column for Top-Down Construction
Kim, Ki-Jong;Lee, Jeong-Bae;Hwang, Young-Hwan;
/
Korea Concrete Institute
, v.25, no.2, pp.45-48,
|
|
8 |
Construction of Pyeongtaek-Siheung Expressway Package EX-3
Joo, Hyo-Joon;Park, Cheol-Min;Go, Gyu-Nam;Baek, Seung-Ryeol;Shin, Seung-Kyo;
/
Korea Concrete Institute
, v.25, no.2, pp.49-52,
|
|