DOI QR코드

DOI QR Code

Investigating Defect Types and Causative Factors in the Seismic Retrofitting of Educational Facilities

학교시설 내진보강공사 시 발생하는 하자 유형 및 하자 발생 요인 연구

  • Kim, Moon Sik (Department of Architectural Engineering, Pusan National University) ;
  • Jung, Dae Gyo (Department of Architectural Engineering, Pusan National University) ;
  • Park, Hyun Jung (Department of Architectural Engineering, Silla University) ;
  • Kim, Dae Young (Department of Architectural Engineering, Pusan National University)
  • Received : 2023.11.27
  • Accepted : 2024.02.05
  • Published : 2024.02.20

Abstract

This research addresses the types and causes of defects in seismic retrofitting projects of school facilities, which, following the Gyeongju and Pohang earthquakes in September 2016 and November 2017 respectively, have been identified as having comparatively lower seismic resilience among public buildings. The incidence of seismic retrofitting has notably increased in the subsequent years, raising concerns about the potential for defects arising from these efforts. The government has committed to enhancing the seismic resilience of all public facilities by 2035, with a specific focus on completing upgrades for educational establishments by 2029. Although prior investigations have explored construction defects in school facilities, there exists a gap in research specifically targeting defects within seismic retrofitting processes. Thus, this study aims to catalog the defects associated with seismic retrofitting efforts and analyze their underlying causes to identify crucial management strategies for defect mitigation. Furthermore, by examining the interplay between defect types and their causative factors, the study seeks to pinpoint essential management practices that could preempt defects during the construction phase, ultimately aiding in the reduction of future maintenance expenditures.

2016년 9월 경주지진, 2017년 11월 발생한 포항지진 이후 공공시설중 상대적으로 내진성능 보급이 부진하였던 학교시설의 경우 2017년~2019년 사이 2배 이상 보급되었다. 내진보강공사가 공급됨으로 늘어난 비중에 하자가 발생할 가능성이 존재한다. 정부는 오는 2035년까지 모든 공공시설에 내진성능보강공사를 완료하고 학교시설의 경우 2029년까지 내진성능보급을 완료하는 것으로 확인되었다. 이에 따라 선행연구를 고찰해보았고 학교시설공사에서 발생하는 하자에 관련한 연구가 진행되는 것으로 확인되었다. 하지만 마감공사에서 발생하는 하자 예방에 대한 연구가 진행되고 있었으며, 학교시설의 내진보강공사에서 발생하는 하자에 관련한 연구는 부족한 실정이었다. 따라서 본 연구는 내진보강공사에서 발생하는 하자 유형들을 조사하고 해당 원인들을 분석하여 하자예방의 중점관리요소를 도출할 것이다. 또한 궁극적으로 하자 유형과 원인간의 관계를 분석하여 중점관리요소를 선정함으로써 향후 내진보강공사를 진행함에 있어 시공단계에서 하자를 예방할 수 있고, 보수비용을 저감하는데 기여할 것이다.

Keywords

Acknowledgement

This study was conducted with the support of the Korea Research Foundation and funded by the Ministry of Science and Technology Information and Communication in 2019(No. NRF-2022R1F1A1069875).

References

  1. Park YP. Earthquake-proofing rate of public facilities 75.1%,.. School buildings will be reinforced by 2029[Internet]. Seoul (Korea): The Kyung Hyang Shinmun; 2023 Apr 27. Available from: https://www.khan.co.kr/national/national-general/article/202304271201001?utm_source=urlCopy&utm_medium=social&utm_campaign=sharing 
  2. Kang J. A study on the seismic retrofit techniques of school buildings constructed in accordance with standard design in 1980s. Journal of Korean Society of Hazard Mitigation. 2012 Feb;12(1):1-7. https://doi.org/10.9798/KOSHAM.2012.12.1.001 
  3. Na YJ, Ha SG, Son SH, Son KY, Lee J. A study on comparing and analyzing seismic retrofit method guideline of the existing education facilities between south-korea and overseas. Journal of the Korea Institute of Building Construction. 2019 Apr;19(2):157-65. https://doi.org/10.5345/JKIBC.2019.19.2.157 
  4. Park JH, Kim YJ, Ahn TS. Seismic evaluation and rehabilitation methods of school buildings. Journal of the Korean Institute of Educational Facilities. 2012 Mar;19(2):26-9. 
  5. Youn GH, Kim SH, Kim YC, Yun HY. Seismic retrofit of an existing school building using cip-infilled shear walls and steel braces. Journal of the Korean Institute of Educational Facilities. 2012 Jul;19(4):21-8. https://doi.org/10.7859/kief.2012.19.4.021 
  6. Kang SB, Kwak JM, Shin DW, Son, KY. Economic analysis of a 5-story RC OMRF retrofitted with modified epoxy mortar for improving seismic performance. Journal of the Korea Institute of Building Construction. 2014 Jun;14(3):207-15. https://doi.org/10.5345/JKIBC.2014.14.3.207 
  7. Song WY, An JH, Park CS. A comparative study on seismic retrofit technique for seismic retrofit of existing low-rise building in university. Journal of the Regional Association of Architectural Institute of Korea. 2011 Jun;13(2):175-82. 
  8. Song JK, Hwang JS, Kim GW, Song HB, Lee JH. Seismic performance evaluation and seismic retrofit of school building considering deterioration. Journal of the Architectural Institute of Korea Structure & Construction. 2010 Aug;26(8):3-10. 
  9. Bae SI, Shim UJ, Ahn YS. The study on the selection of primary management objects for defect prevention of finishing works on apartment house. Journal of the Regional Association of Architectural Institute of Korea. 2013 Jan;15(3):179-86. 
  10. Lee JB, Kwon SW, Kwak KS, Oh SK. An example of repair works and leakage analysis for school facility. Proceedings of the Korean Institute of Building Construction Conference. 2004 May 15; Seoul, Korea. Seoul (Korea): The Korean Institute of Building Construction; 2004. p. 105-8. 
  11. Ryoo CH, Park YK. Analysis on quality defect status in the construction site of domestic educational facilities. Journal of the Korean Institute of Educational Facilities. 2008 Jan;15(1):44-52. 
  12. Ahn SH. Major issues and countermeasures for defect disputes in construction plant : focusing on supreme court precedents and FIDIC contract conditions [dissertation]. Seoul (Korea): Kwangwoon University. 2022. p. 12-8. 
  13. Lee DH, Shin UJ, Suh HS, Ahn YS. A study on the selection of primary management objects in Life-Cycle phases through analyzing the case of defect in constructing Apartment house. Journal of the Architectural Institute of Korea Planning & Design. 2012 Jun;14(2):201-8. 
  14. Lee GH, Lim HC, Han DK. Improvement of defect management of apartment houses through analysis of influencing factors. Journal of the Regional Association of Architectural Institute of Korea. 2012 Sep;14(3):247-54. 
  15. Jeong UJ, Kim DY, Lim JY, Park HJ. Analysis of major factors of window work in construction phase considering recurrence of defects in the maintenance phase. Journal of the Korea Institute of Building Construction. 2021 Dec;21(6):653-64. https://doi.org/10.5345/JKIBC.2021.21.6.653