Acknowledgement
This work was supported by the National Research Foundation of Korea(NRF) grant funded by the Korea government (MSIT)(No. RS-2023-00220921).
References
- Kim HJ. Real estate market ↓...Five construction companies went bankrupt in four months [Internet]. Seoul (Korea): Segyeilbo; 2023 May 10. Available from: https://www.segye.com/newsView/20230509514981
- Park CS, Lee JU, Choi SI. Comprehensive appraisal of value engineering practices in domestic construction Industry. Korean Journal of Construction Engineering and Management. 2002 Jun;3(2):67-74.
- Kim SK, Heo SS, Choi YK. Construction cost-down of building substructure by VE techniques. Korean Journal of Construction Engineering and Management. 2005 Jan;6(1):125-32.
- Jung JJ, Kim JH, Koom KJ, Hyun CT. An application of value engineering to design-build projects at design development phase. Proceedings of the Korean Institute Of Construction Engineering and Management. 2003 Nov 8; Suwon, Korea. Seoul (Korea): Korea Institute of Construction Engineering and Management. 2003. p. 294-8.
- Lee JS, Chun JY. A method for selection of optimum alternative and decision making support process in construction VE. Journal of the Architectural Institute of Korea Structure & Construction. 2010 Mar;26(3):111-9.
- Choi GY. VE Techniques. [Internet]. Seoul (Korea): Korea Society of Korean Value Management; 2022. Available from: http://www.skvm.org/
- Kim JH, Koo KJ, Hyun CT. A study on the success model for design-build delivery method process. Korean Journal of Construction Engineering and Management. 2003 Sep;4(3):119-27.
- Chun JY. A study on the improvement of techniques for subject selection for value engineering process in early design stage. Journal of the Architectural Institute of Korea Structure & Construction. 2003 Feb;19(2):123-30.
- Han JK, Chin SY, Kim YS. An analysis on delay factors of major trades in apartment housing projects. Journal of the Architectural Institute of Korea Structure & Construction. 2003 Mar;19(3):163-70.
- Cha, HS, Lee HS. The method of selecting optimum construction alternative considering time and performance in the initial scheduling phase. Journal of the architectural institute of Korea. 1997;13(12):367-74.