Steel Modular Buildings in the United States

  • Published : 2023.02.20

Abstract

Keywords

References

  1. Choi, J. O. (2014). 'Links between Modularization Critical Success Factors and Project Performance.' Ph.D. Dissertation, The University of Texas at Austin, Austin, TX.
  2. Choi, J. O. (2015). '조립식 (Prefabrication) 및 모듈화 (Modularization) 관련 연구 동향.' 건설관리 (Construction Engineering and Management), 16(3), 44-47.
  3. Choi, J. O. (2019). '모듈화 (Modularization) 관련 연구 동향.' 건설 관리 (Construction Engineering and Management), 20(1), 45-48.
  4. Choi, J. O., Chen, X. B., and Kim, T. W. (2019). 'Opportunities and challenges of modular methods in dense urban environment.' International Journal of Construction Management, 19(2), 93-105. https://doi.org/10.1080/15623599.2017.1382093
  5. International Code Council. (2020). FAQs on Off-Site Construction.
  6. Kluck, M., and Choi, J. O. (2023). Modularization: The Fine Art of Offsite Preassembly for Capital Projects. John Wiley & Sons, Inc., Hoboken, NJ.
  7. Modular Building Institute (MBI). (2021). 2021 Permanent Modular Construction Report. Charlottesville, VA.
  8. Modular Building Institute (MBI). (2023). 'Markets Served.'  (May 2, 2023).
  9. The White House. (2022). ‘President Biden Announces New Actions to Ease the Burden of Housing Costs.’ (May 2, 2023).
  10. Volumetric Building Companies, and Polcom. (2022). ‘VOLUMETRIC BUILDING COMPANIES AND POLCOM GROUP COMPLETE MERGER, SOLIDIFYING A GLOBAL LEADERSHIP POSITION IN MODULAR CONSTRUCTION TECHNOLOGY.’ (May 2, 2023)