Abstract

In this study, the performance of the support modular system, as substructure of the proposed sustainable-perpetual modular road system to reduce road construction time and maintenance costs was evaluated. A modular road system consisting of 4 support modular cross-beams with a lower curved surface was constructed on the test-bed. Six load cells and eight LVDTs were installed in the center part of two cross-beam support modular systems. Two loads, 50kN and 100kN, were applied to 15 points on the pavement slab to measure the load and displacement occurring in the modular road system. The measured displacements were less than 1 mm, so it is considered that there was no problem in the stability of the actual road. When comparing the two applied loads and the measured loads in the field test, it was considered that the load transmitted to the ground under the support modular system is very small. It is considered that the modular road system with the support modular system is applicable to the actual road site.

본 연구에서는 도로의 건설 시간 및 유지관리 비용을 단축하기 위하여 제안된 지속가능한 장수명 모듈러 도로시스템의 하부구조인 지지 모듈러의 성능을 평가하였다. 하부 곡선면을 가진 Cross-Beam 형태의 지지 모듈러 4개로 구성된 모듈러 도로시스템을 Test-bed에 시공하였다. 6개의 하중계와 8개의 변위계를 중앙부 2개 Cross-Beam 형태의 지지 모듈러에 설치하였다. 2개의 하중, 50kN, 100kN을 도로 포장슬래브 15개 지점에 재하하여 모듈러 도로시스템에서 발생하는 하중 및 변위를 측정하였다. 측정된 변위들은 1mm 미만으로 실제 도로의 안정성에 문제가 없을 것으로 판단된다. 현장실험에서 적용된 2개의 재하 하중들과 측정된 하중값들을 비교해 보았을 때 하부 지반에 전달되는 하중은 매우 작은 것으로 판단된다. 지지 모듈러를 가진 모듈러 도로 시스템을 실제 도로현장에 적용 가능한 것으로 판단된다.

Keywords

Acknowledgement

본 연구는 한국건설기술연구원의 주요사업인 '맞춤형 지지 모듈러 시스템 개발' 과제의 지원을 받아 수행되었으며, 이에 감사를 드립니다.

References

  1. Kim, D.G. (2021), Design and performance evaluation of support module for modular road system, Journal of the Korean Geo-Environmental Society, Vol. 22, No. 12, pp. 71~77 (In Korea). https://doi.org/10.21562/kjs.2021.11.55.4.71
  2. Kim, Y.B., Song, J.J. and Kim, D.G.(2012), Sustainable-Perpetual-Modular (SPM) road system development, KICT 2013-185-1, Korea Institute of Construction Technology, pp. 16~27 (In Korea).
  3. Korea Transport Institute (2022), 2021 Traffic olicy evaluation indicator survey project, Korea Transport Institute, pp. 6~7 (In Korea).
  4. Ministry of Land, Transport and Maritime Affairs (2010), Korean highway bridge design code, Korea Road and Transportation Association, pp. 2.1~2.5 (In Korea).
  5. Ministry of Land, Infrastructure and Transport (2021), Yearbook of road statistics, Ministry of Land, Infrastructure and Transport, pp. 53 (In Korea).
  6. Park, H.B. (2008), Experimental Constructions of New Pavements and Pavement Repairs Using Precast Slabs (In Korea).
  7. Sidney III, S., Konrath, L. and Ferragut, T. (2013), PERFORMANCE SPECIFICATIONS FOR RAPID HIGHWAY RENEWAL FINAL REPORT, TRB, SHRP2 R07.