DOI QR코드

DOI QR Code

The Effect of the Project Plan Variance on Customer Satisfaction: Focus on IT Project Results

프로젝트 계획의 변동이 고객만족도에 미치는 영향: IT 프로젝트 결과 중심으로

  • 윤형석 (한양대학교 대학원 경영대학) ;
  • 이석주 (피엠전문가 협회) ;
  • 김승철 (한양대학교 경영대학 경영학과) ;
  • 박소현 (건국대학교 경영대학)
  • Received : 2022.08.28
  • Accepted : 2022.10.21
  • Published : 2022.10.31

Abstract

Companies are planning and executing IT projects using information technology as a means to secure external competitiveness. However, IT projects have high risks and uncertainties due to the invisibility of outputs (systems, services, products), and changes in plans frequently occur during project execution. As a result, most IT projects are closed without achieving the target performance. This can lead to a waste of resources and money for the company, which in turn leads to the loss of opportunities to enter new markets. This study intends to analyze the effect of changes in the project plan on customer satisfaction, which is the project performance. Also, we want to find the importance of project planning so that the target performance of the IT project can be achieved. For the empirical analysis of this study, about 500 actual project data were collected. As for the analysis method, statistical analysis such as simple and multiple regression analysis and control effect was performed. Looking at the results of the analysis, it was found that the scope change affects the cost change and the schedule change. Also, changes in scope and cost were found to affect project performance. The theoretical performance of this study proved the theoretical fact that good project performance comes out if the IT project is executed as planned. The practical performance suggested the need for a change in project management by proving that thorough execution of the project planning stage can improve the project performance in the Korean project management culture, where the project planning stage is poorly performed for the rapid implementation of the IT project.

Keywords

References

  1. 김상윤, 백승익, 최덕선, 오수진, "SI 프로젝트 범위 증감에 영향을 미치는 위험 요소에 대한 연구", 한국IT서비스학회, 제3권, 제2호, 2004, 53-64.
  2. 김승철, 이재성, 글로벌 스탠다드 프로젝트 경영 2판, 한경사, 2014.
  3. 김유신, 정승렬, "금융 정보화 프로젝트 성공을 위한 프로젝트 관리 활동 실증연구", 한국경영정보학회 학술대회논문집, 제2010.11호, 2010, 308-319.
  4. 김은홍, 김화영, "SI 프로젝트에 있어서 프로젝트 관리자의 역량과 리더십 유형이 프로젝트 성과와 고객 만족에 미치는 영향", 한국경영과학회지, 제31권, 제4호, 2006, 157-179.
  5. 배재권, 김진화, 김상열, "PMO 역량에 따른 프로젝트 성과에 관한 연구", 경영정보학연구, 제18권, 제1호, 2008, 55-77.
  6. 윤형석, 이석주, 이동현, 김능회, 인호, "Standish CHAOS Report로 본 한국 SI 프로젝트의 성공과 실패에 관한 분석 연구", 한국정보처리학회학술대회, 제16권, 제11호, 2009, 827-828.
  7. 이병열, 이선규, "정보화 프로젝트 성과에 미치는 영향 요인의 중요도 분석", 한국정보기술학회, 제13권, 제1호, 2015, 127-138.
  8. 이설빈, 부제만, 김승철, "프로젝트 관리자의 리더십이 참여자 개인 역량과 프로젝트 성과에 미치는 영향에 관한 연구", 벤처창업연구, 제11권, 제5호, 2016, 175-188. https://doi.org/10.16972/APJBVE.11.5.201610.175
  9. 정보통신산업진흥원, "소프트웨어 공학 백서 2017", 정보통신산업진흥원 SW공학센터, 2017.
  10. Atkinson, R., "Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria", International Journal of Project Management, Vol.17, No.6, 1999, 337-342. https://doi.org/10.1016/S0263-7863(98)00069-6
  11. Baccarini, D., "The logical framework method for defining project success", Project Management Journal, Vol.30, No.4, 1999, 25-32. https://doi.org/10.1177/875697289903000405
  12. Beleiu, I., E. Crisan, and R. Nistor, "Main factors influencing project success", Interdisciplinary Management Research, Vol.11. No.2, 2016, 59-72.
  13. Berry, D.M., K. Czarnecki, M. Antkiewicz, and M. Abdelrazik, "Requirements determination is unstoppable: an experience report", 18th IEEE International Requirements Engineering Conference, 2010.
  14. Cooke-Davies, T., "The "real" success factors on projects", International Journal of Project Management, Vol.20, No.3, 2002, 185-190. https://doi.org/10.1016/S0263-7863(01)00067-9
  15. Dvir, D. and T. Lechler, "Plans are nothing, changing plans is everything: The impact of changes on project success", Research Policy, Vol.31, No.1, 2004, 1-15. https://doi.org/10.1016/j.respol.2003.04.001
  16. Dvir, D., T. Raz, and A. J. Shenhar, "An empirical analysis of the relationship between project planning and project success", International Journal of Project Management, Vol.21, No.2, 2003, 89-95. https://doi.org/10.1016/S0263-7863(02)00012-1
  17. Gibson, G. and Y.R. Wang, "Scope definition, a key to project success", COBRA 2001: Proceedings of the RICS Foundation Construction and Building Research Conference, 2001.
  18. Gibson, G.E. and M.R. Hamilton, "Analysis of pre-project planning effort and success variables for capital facility projects", The Project Management Institute. 1994.
  19. Jiang, J.J., G. Klein, G., S.P. Wu, and T.P. Liang, "The relation of requirements uncertainty and stakeholder perception gaps to project management performance", Journal of Systems and Software, Vol. 82, No. 5, 2009, 801-808. https://doi.org/10.1016/j.jss.2008.11.833
  20. Joseph, T.C., A. Gary and T. Joanne, "The effects of project management certification on the triple constraint", International Journal of Information Technology Project Management (IJITPM), Vol.4, No.4, 2013, 93-111. https://doi.org/10.4018/ijitpm.2013100106
  21. Kerzner, H., Project management: A systems approach to planning, scheduling, and controlling, John Wiley & Sons. 2017.
  22. Koskela, L. and G. Howell, "The underlying theory of project management is obsolete", IEEE Engineering Management Review, Vol.36, No.2, 2008, 293-302.
  23. Madhuri, K.L. and V. Suma, "Influence of domain and technology upon scope creep in software projects", International Conference on Advances in Electronics Computers and Communications, 2014.
  24. Muller, R. and J.R. Turner, "Matching the project manager's leadership style to project type", International Journal of Project Management, Vol.25, No.1, 2007, 21-32. https://doi.org/10.1016/j.ijproman.2006.04.003
  25. Pinto, J.K. and J.E. Prescott, "Planning and tactical factors in the project implementation process", Journal of Management Studies, Vol.27, No.3, 1990, 305-327. https://doi.org/10.1111/j.1467-6486.1990.tb00249.x
  26. Pinto, J.K. and D.P. Slevin, "Critical success factors in effective project implementation", Project Management Handbook, Vol.479, No.20, 1988, 167-190.
  27. Pinto, J.K. and D. P. Slevin, "Critical Factors in Successful Project Implementation", IEEE Transactions on Engineering Management, Vol.34, No.1, 1987, 22-27. https://doi.org/10.1109/TEM.1987.6498856
  28. PMI, A guide to the project management body of knowledge: PMBOK guide 6th, Project Management Institute, 2017.
  29. Pollack, J., J. Helm, and D. Adler, "What is the Iron Triangle, and how has it changed?", International Journal of Managing Projects in Business, Vol.11, No.2, 2018, 527-547. https://doi.org/10.1108/IJMPB-09-2017-0107
  30. Rai, A., S.S. Lang, and R.B. Welker, "Assessing the validity of IS success models: An empirical test and theoretical analysis", Information Systems Research, Vol.13, No.1, 2002, 50-69. https://doi.org/10.1287/isre.13.1.50.96
  31. Schwalbe, K., Information technology project management, Cengage Learning, 2015.
  32. Standish, "Chaos manifesto 2015", The Standish Group International, https://www.infoq.com/articles/standish-chaos-2015.
  33. Sovacool, B.K., A. Gilbert, and D. Nugent, "Risk, innovation, electricity infrastructure and construction cost overruns: Testing six hypotheses", Energy, Vol.74, No.1, 2014, 906-917. https://doi.org/10.1016/j.energy.2014.07.070
  34. Taylor, J., A survival guide for project managers, Amacom Books, 2006.
  35. Tesfaye, E., T. Lemma, E. Berhan, and B. Beshah, "Key project planning processes affecting project success", International Journal for Quality Research, Vol.11, No.1, 2017, 159-172.
  36. Turner, R., Handbook of project-based management: Leading strategic change in organizations, McGraw-Hill Education. 2014.
  37. Warburton, R.D. and D.F. Cioffi, Project management theory: Deriving a project's cost and schedule for its network structure, Project Management Institute, 2014.
  38. Zviran, M. and Z. Erlich, "Measuring IS User Satisfaction: Review and Implications", Communications of the Association for Information Systems, 2003, Vol.12, https://doi.org/10.17705/1cais.01205
  39. Zwikael, O. and S. Globerson, "Benchmarking of project planning and success in selected industries", Benchmarking: An International Journal, Vol.13, No.6, 2006, 688-700. https://doi.org/10.1108/14635770610709059