Acknowledgement
이 연구는 2022년도 국토교통부/국토교통과학기술진흥원의 지원으로 수행되었음 (과제번호 22ORPS-B158109-03)
References
- Altaf, M. S., Bouferguene, A., Liu, H., Al-Hussein, M., & Yu, H. (2018). "Integrated production planning and control system for a panelized home prefabrication facility using simulation and RFID." Automation in Construction, 85, 369-383. https://doi.org/10.1016/j.autcon.2017.09.009
- Alvanchi, A., Azimi, R., Lee, S., AbouRizk, S. M., & Zubick, P. (2012). "Off-site construction planning using discrete event simulation." Journal of Architectural Engineering, 18(2), 114-122. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000055
- Arashpour, M., Bai, Y., Aranda-mena, G., Bab-Hadiashar, A., Hosseini, R., & Kalutara, P. (2017). "Optimizing decisions in advanced manufacturing of prefabricated products: Theorizing supply chain configurations in off-site construction." Automation in Construction, 84, 146-153. https://doi.org/10.1016/j.autcon.2017.08.032
- Bernstein, H. M., Gudgel, J. E., & Laquidara-Carr, D. (2011). "Prefabrication and modularization: ncreasing productivity in the construction industry." McGraw Hill Construction.
- Bertram, N., Fuchs, S., Mischke, J., Palter, R., Strube, G., & Woetzel, J. (2019). "Modular construction from projects to products." McKinsey & Company.
- Chen, K., Xu, G., Xue, F., Zhong, R. Y., Liu, D., & Lu, W. (2018). "A physical internet-enabled building information modelling system for prefabricated construction." International Journal of Computer Integrated Manufacturing, 31(4-5), 349-361. https://doi.org/10.1080/0951192X.2017.1379095
- Chen, W., Zhao, Y., Yu, Y., Chen, K., & Arashpour, M. (2020). "Collaborative scheduling of on-site and off-site operations in prefabrication." Sustainability, 12(21).
- Hamilton, I., Rapf, O., Kockat, D. J., Zuhaib, D. S., Abergel, T., Oppermann, M., Otto, M., Loran, S., Fagotto, I., & Steurer, N. (2020). "2020 global status report for buildings and construction." United Nations Environmental Programme.
- Hyun, H., Kim, H. G., & Kim, J. S. (2021). "A Business Model for Activating the Small-Scale Public Housing Supply in Urban Area using Off-Site Construction Method - Focusing on Integrated Implementation of Dispersed Small-scale Public Housing Construction Projects -." Journal of the Architectural Institute of Korea, 37(3), 183-193. https://doi.org/10.5659/JAIK.2021.37.3.183
- Iqbal, M., Ahmad, N., Waqas, M., & Abrar, M. (2021). "COVID-19 pandemic and construction industry: Impacts, emerging construction safety practices, and proposed crisis management." Brazilian Journal of Operations & Production Management, 18(2), 1-17.
- Jeong, G., Lee, H., Park, M., Hyun, H., & Kim, H. (2019). "Cause analysis and reduction of safety accident in modular construction - focusing on manufacturing and construction process." Journal of the Architectural Institute of Korea, 35(8), 157-168.
- Jeong, M., Lee, S., Chang, Y., & Kwon, S. (2021). "Smart quality inspection technology for on-site PC members based on off-site construction(OSC)." Proc., Conference of the Architectural Institute of Korea, 745-746.
- Kim, H., Hwang, Y., & Kim, K. (2014). "Study on the Application of Multi-skilled labors to Factory Production Process for Securing Economic Feasibility of Modular Unit." Korean Journal of Construction Engineering and Management, 15(1), 11-19. https://doi.org/10.6106/KJCEM.2014.15.1.011
- Kim, K.-H., Lim, J.-J., Kim, J.-W., Kim, M.-J., Sohn, J.-R., & Lee, B.-S. (2021). "On-site productivity reduction factors for off-site construction based PC public housing." Proc., Conference of the Architectural Institute of Korea, 712-713.
- Kim, M., Park, M., Lee, H.-s., Lee, J., & Lee, K.-P. (2015). "Development of Manufacturing Planning for Multi Modular Construction Project based on Genetic-Algorithm." Korean Journal of Construction Engineering and Management, 16(5), 54-64. https://doi.org/10.6106/KJCEM.2015.16.5.054
- Kim, T., Kim, Y.-W., & Cho, H. (2020). "Dynamic production scheduling model under due date uncertainty in precast concrete construction." Journal of Cleaner Production, 257, 120527. https://doi.org/10.1016/j.jclepro.2020.120527
- Lee, G., Kim, M., Lee, C., Koo, C., & Kim, T. (2021). "Towards a transportation support system for off-site construction : identifying key functions and diagramming functional blocks." Korean Journal of Construction Engineering and Management, 22(2), 21-30. https://doi.org/10.6106/KJCEM.2021.22.2.021
- Lee, H.-R., & Yi, J.-S. (2021). "An analysis of management competency for transportation system of off-site construction project using importance performance analysis." Proc., Conference of the Architectural Institute of Korea, 867-870.
- Lee, J.-M., Seok, W.-G., & Park, S.-J. (2020). "Integrated management platform for OSC projects." Construction Engineering and Management, 29-32.
- Lee, Y., & Cha, M. (2017). "Application of BIM technology in modular construction." Korea Institute of Building Construction Magazine, 10-16.
- Li, C. Z., Xue, F., Li, X., Hong, J., & Shen, G. Q. (2018). "An internet of things-enabled BIM platform for on-site assembly services in prefabricated construction." Automation in Construction, 89, 146-161. https://doi.org/10.1016/j.autcon.2018.01.001
- Lim, S.-H., Seol, W.-J., & Chung, J.-S. (2020). "A study on constructability verification for shortening construction period of modular apartments and implement plan." Journal of the Korean Housing Association, 31(6), 1-11.
- Liu, J., & Lu, M. (2019). "Robust Dual-Level Optimization Framework for Resource-Constrained Multiproject Scheduling for a Prefab Facility in Construction." Journal of Computing in Civil Engineering, 33(2).
- Ma, Z., Yang, Z., Liu, S., & Wu, S. (2018). "Optimized rescheduling of multiple production lines for flowshop production of reinforced precast concrete components." Automation in Construction, 95, 86-97. https://doi.org/10.1016/j.autcon.2018.08.002
- Nam, S., & Kim, Y. (2016). "Development of Project Delivery System in Public Sector for Modular Building." Korean Journal of Construction Engineering and Management, 17(4), 49-56. https://doi.org/10.6106/KJCEM.2016.17.4.049
- Niu, S., Yang, Y., & Pan, W. (2019). "Logistics planning and visualization of modular integrated construction projects based on BIM-GIS integration and vehicle routing algorithm." Modular and Offsite Construction (MOC) Summit Proceedings, 579-586.
- Ribeirinho, M. J., Mischke, J., Strube, G., Sjodin, E., Blanco, J. L., Palter, R., Biorck, J., Rockhill, D., & Andersson., T. (2020). "The next normal in construction." McKinsey and Company.
- Salari, S. A.-S., Mahmoudi, H., Aghsami, A., Jolai, F., Jolai, S., & Yazdani, M. (2022). "Off-site construction three-echelon supply chain management with stochastic constraints: a modelling approach." Buildings, 12(2), 119. https://doi.org/10.3390/buildings12020119
- Wang, Z., & Hu, H. (2017). "Improved Precast Production-Scheduling Model Considering the Whole Supply Chain." Journal of Computing in Civil Engineering, 31(4), 04017013. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000667
- Wang, Z., Hu, H., & Gong, J. (2018). "Framework for modeling operational uncertainty to optimize offsite production scheduling of precast components." Automation in Construction, 86, 69-80. https://doi.org/10.1016/j.autcon.2017.10.026
- Yazdani, M., Kabirifar, K., Fathollahi-Fard, A. M., & Mojtahedi, M. (2021). "Production scheduling of off-site prefabricated construction components considering sequence dependent due dates." Environmental Science and Pollution Research, 1-17.
- Zhang, W., Kang, K., & Zhong, R. Y. (2021). "A cost evaluation model for IoT-enabled prefabricated construction supply chain management." Industrial Management & Data Systems.