Acknowledgement
본 연구는 국토교통부/국토교통과학기술진흥원의 지원으로 수행되었음(과제번호 22AATD-C163269-02).
References
- Baek, D.H., Park, J.R., Kim, J.H., Kim, J.J. (2011) A Basic Study of the Efficiency Analysis for the Amount of Calculation Earth Works Using by BIM, Korean Institute of Building Construction Conference, pp.97~98.
- Bartier, P.M., Keller, C.P. (1996) Multivariate Interpolation to Incorporate Thematic Surface Data using Inverse Distance Weighting (IDW), Comput. & Geosci., 22(7), pp.795~799. https://doi.org/10.1016/0098-3004(96)00021-0
- Han, J.H., Nam, S.H. (2011) A Study on the Automated Estimating System using BIM based Library, Korean Inst. Build. Inf. Model.,1(2), pp.12~18.
- Hwang, H.S., Lee, J.H., Kim, T.Y. (2018) Parametric Quantity Take-Off of Earthwork by Comparing the Use of Surface and Solid Models, Korean Inst. Build. Inf. Model., 8(1), pp.56~62.
- Jeon, G.H., Yun, S.H. (2011) The Case Study of BIM-based Quantity Take-off for Concrete and Formwork, J. KIBIM, 1(1), pp.13~17. https://doi.org/10.13161/kibim.2011.1.1.013
- Jung, G.Y., Woo, J.W., Kang, K.D., Shin, J.C. (2013) Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume, J. KIBIM, 3(3), pp.9~18. https://doi.org/10.13161/KIBIM.2013.3.3.009
- Kim, C.W., Koo, B. (2014) Development of Parametric BIM Libraries for Civil Structures using National 2D Standard Drawings, J. Constr. Eng. & Manag., 15(4), pp.128~138.
- Kim, J.M. (2016) BIM Based Smart Temporary Work Planning, 15, J. KIBIM, pp.38~39.
- Korea Institute of Construction Technology (2007) Construction Information Classification System Manual.
- Lee, H.J., Park, K.Y., Kim, H.J., Lee, S.H. (2010) BIM Based Virtual Simulations in CIP (Case in Place Pile) Method for Underground Space Excavation, In Proceedings of the Computational Structural Engineering Institute Conference, pp.517~520.
- Ministry of Land, Infrastructure and Transport (2020a) BIM Activation Roadmap.
- Ministry of Land, Infrastructure and Transport (2020b) Basic BIM Guidelines for Construction Industry.
- National Center for construction Standards (2020) Standard for Temporary Construction.
- Noh, H.R., Yun, S.H. (2016) A Study on the Expression Level of BIM Model for utilizing in Construction Phase, Korean Institute of Building Construction Conference, pp.253~254.
- Oh, J.H., Cho, C.H., Kim, K.W., Baek, Y.S. (2002) Total Management System for Earth Retaining Structures Using Observational Method, J. Korean Geotech. Soc., 18(2), pp.51~64.
- Park, J.K., Jung, K.Y. (2021) Accuracy Evaluation of Earthwork Volume Calculation According to Terrain Model Generation Method, J. Korean Soc. Surv., Geodesy, Photogramm. & Cartogr., 39(1), pp.47~54. https://doi.org/10.7848/KSGPC.2021.39.1.47
- Public Procurement Service (2021) Standard Construction Code.
- Shin, J.C., Baek, Y.I., Park, W.T. (2011) Analysis of Errors in Tunnel Quantity Estimation with 3D-BIM Compared with Routine Method Based 2D, J. Korean Geotech. Soc., 27(8), pp.63~71. https://doi.org/10.7843/KGS.2011.27.8.063
- Shin, S.H., Ham, N.H., Kim, J.J. (2010) Assessment of BIMBased Government Funded Projects at the Design Phase, Korean Institute of Building Construction Conference, pp. 213~216.