DOI QR코드

DOI QR Code

Insights gained from applying negate-down during quantification for seismic probabilistic safety assessment

  • Kim, Ji Suk (Department of Energy Systems Engineering, Chung-Ang University) ;
  • Kim, Man Cheol (Department of Energy Systems Engineering, Chung-Ang University)
  • 투고 : 2020.07.29
  • 심사 : 2022.03.12
  • 발행 : 2022.08.25

초록

Approximations such as the delete-term approximation, rare event approximation, and minimal cutset upper bound (MCUB) need to be prudently applied for the quantification of a seismic probabilistic safety assessment (PSA) model. Important characteristics of seismic PSA models indicate that preserving the success branches in a primary seismic event tree is necessary. Based on the authors' experience in modeling and quantifying plant-level seismic PSA models, the effects of applying negate-down to the success branches in primary seismic event trees on the quantification results are summarized along with the following three insights gained: (1) there are two competing effects on the MCUB-based quantification results: one tending to increase and the other tending to decrease; (2) the binary decision diagram does not always provide exact quantification results; and (3) it is identified when the exact results will be obtained, and which combination provides more conservative results compared to the others. Complicated interactions occur in Boolean variable manipulation, approximation, and the quantification of a seismic PSA model. The insights presented herein can assist PSA analysts to better understand the important theoretical principles associated with the quantification of seismic PSA models.

키워드

과제정보

This work was supported by grants from the Nuclear Safety Research Program of the Korea Foundation of Nuclear Safety, granted financial resource from the Multi-Unit Risk Research Group (MURRG), with funding by the Korean government's Nuclear Safety and Security Commission (Grant Code: 1705001) and the Nuclear Research & Development Program of the National Research Foundation of Korea, with funding by the Korean government's Ministry of Science and ICT [grant number NRF-2017M2B2B1071973].

참고문헌

  1. S.H. Han, H.G. Lim, S.C. Jang, J.E. Yang, AIMS-PSA: a software for integrated PSA, in: 13th International Conference on Probabilistic Safety Assessment and Management (PSAM 13), 2016. Seoul, Korea.
  2. KEPCO E&C, SAREX User's Manual Version 1.2, Korea Electric Power Corporation Engineering & Construction Co., Inc. (KEPCO E&C), 2011.
  3. EPRI, Computer Aided Fault Tree Analysis System (CAFTA), Electric Power Research Institute, 2014. http://www.epri.com/abstracts/Pages/ProductAbstract.aspx?ProductId=000000003002004316.
  4. USNRC, Systems Analysis Programs for Hands-On Integrated Reliability Evaluations (SAPHIRE) Version 8, United States Nuclear Regulatory Commission, 2011.
  5. EPRI, FTREX 1.9 Software Manual (3002012968), Electric Power Research Institute, Palo Alto, CA, USA, 2018.
  6. EPRI, Seismic Probabilistic Risk Assessment Implementation Guide, 3002000709, Electric Power Research Institute, Palo Alto, CA, USA, 2013.
  7. J.H. Kim, I.K. Choi, M.K. Kim, S.H. Han, J.H. Park, Development and Validation of the Seismic Probabilistic Safety Assessment Software PRASSE, KAERI/TR-4649/2012, Korea Atomic Energy Research Institute, Daejeon, Korea, 2012.
  8. USNRC, Risk Assessment of Operational Events Handbook Volume 2 - External Events, United States Nuclear Regulatory Commission, 2008.
  9. W.S. Jung, J.E. Yang, J. Ha, A new method to evaluate alternate AC power source effects in multi-unit nuclear power plants, Reliab. Eng. Syst. Saf. 82 (2003) 165-172. https://doi.org/10.1016/S0951-8320(03)00140-6
  10. W.S. Jung, S.H. Han, J.E. Yang, Fast BDD truncation method for efficient top event probability calculation, Nucl. Eng. Technol. 40 (7) (December 2008) 571-580. https://doi.org/10.5516/NET.2008.40.7.571
  11. EPRI, Surry Seismic Probabilistic Risk Assessment Pilot Plant Review, Electric Power Research Institute, 2010.
  12. EPRI, ABUBE 2.0 Software Manual 3002003169, Electric Power Research Institute, 2014.
  13. S.H. Han, J.H. Park, D.S. Kim, H.G. Lim, S.C. Jang, Comparison of Various Methods to Quantify a Fault Tree for Seismic PSA, Transaction of the Korean Nuclear Society Spring Meeting, Jeju, Korea, 2015.
  14. H.K. Lim, A study of system Analysis method for seismic PSA of nuclear power plants, J. Korean Surg. Soc. 34 (5) (October 2019) 159-166 (in Korean).
  15. Woo Sik Jung, Sang Hoon Han, Jaejoo Ha, A fast BDD algorithm for large coherent fault trees analysis, Reliab. Eng. Syst. Saf. 83 (2004) 369-374. https://doi.org/10.1016/j.ress.2003.10.009
  16. J. Collet, Some Remarks on Rare-Event Approximation, IEEE TRANSACTIONS ON RELIABILITY, 1996, p. 45.
  17. J. Oh, S. Kwag, A study on seismic probabilistic safety assessment for a Research reactor, Comput. Struct. Eng. Inst. Korea 31 (2018) 31-38. https://doi.org/10.7734/COSEIK.2018.31.1.31
  18. W.S. Jung, A method to improve cutset probability calculation in probabilistic safety assessment of nuclear power plants, Reliab. Eng. Syst. Saf. 134 (February 2015) 134-142. https://doi.org/10.1016/j.ress.2014.10.019
  19. S. Epstein, A. Rauzy, Can we trust PRA? Reliab. Eng. Syst. Saf. 88 (3) (June 2005) 195-205. https://doi.org/10.1016/j.ress.2004.07.013