Performance assessment of repair techniques of large diameter water pipes

대구경 상수관로의 기존 부분 보수보강 기술 성능평가

  • Ho-Min Lee (Water & Wastewater Research Center, K-water) ;
  • Jeong-Soo Park (Water & Wastewater Research Center, K-water) ;
  • Gimoon Jeong (Water & Wastewater Research Center, K-water) ;
  • Cheol-Ho Bae (Water & Wastewater Research Center, K-water)
  • 이호민 (한국수자원공사 상하수도연구소) ;
  • 박정수 (한국수자원공사 상하수도연구소) ;
  • 정기문 (한국수자원공사 상하수도연구소) ;
  • 배철호 (한국수자원공사 상하수도연구소)
  • Received : 2022.10.21
  • Accepted : 2022.11.11
  • Published : 2022.12.15

Abstract

In this study, as the proportion of aged pipelines increases rapidly, in the event of an accident caused by corrosion and structural deterioration of metal pipes, appropriate overlay welding is applied in the field to partially repair it. The size of the base steel plate and the selection of a stable welding method were evaluated, and possible problems caused by the overlay welding were identified, and improvement measures were proposed. For the test, a new steel pipe coated with epoxy lining on the inner surface and polyethylene on the outer surface was subjected to a tensile test by processing the repaired specimen through overlay welding with a steel plate after artificial cracking, and structural safety was evaluated after repair. Furthermore, the influences of the size of the throat and the size of the steel plate were analyzed. As a result of the tensile test by dividing the repaired steel plate overlay into a constraint and non-constraint conditions, the tensile load was concentrated in the welded part and damage occurred in the welded part. It was found that the maximum load leading to breakage increases as the size of the welding throat increases. In addition, it was found that the resistance to load increased slightly as the size of the overlaid steel plate increased, but the effect was not significant, confirming the need for repair in consideration of the site conditions. As a result of evaluating the damage to the coating material on the back side of the welding, it was confirmed that the coating material on the opposite side of the welding burned black(epoxy) or was greatly deformed by heat(polyethylene). Therefore, it is necessary to secure structural stability through repainting, etc. in order to prevent damage to the coating material on the opposite side during overlay welding.

Keywords

References

  1. Azraai, S.N.A., Lim, K.S., Yahaya. N. and Noor. N.M. (2015). Infill Materials of Epoxy Grout for Pipeline Rehabilitation and Repair, Malaysian J. Civil Eng., 27(1), 162-167.
  2. American Water Works Association Research Foundation (AWWARF). (2002). Prioritization Water Main Replacement and Rehabilitation.
  3. American Water Works Association(AWWA). (2012). Pipeline Repair for Water Utilities DVD.
  4. AWWA. (2014). M28 Rehabilitation of Water Mains 3rd Ed.
  5. Korea Agent for Technology and Standards(KATS). (2007a). Test pieces for tensile test for metallic materials(KS B 0801).
  6. KATS. (2007b). DC arc welding machine(KS C 9602).
  7. KATS. (2018). Covered electrodes for mild steel(KS D 7004).
  8. Ministry of Environment(MOE). (2020). 2020 Statistics of waterworks.
  9. Pipeline Research Council International(PRCI). (2006). Pipeline Repair Manual.
  10. Rogers, P.D. and Grigg, N.S. (2009). Failure assessment modeling to prioritize water pipe renewal: Two case studies, J. Infra. Syst., 15(3), 162-171. https://doi.org/10.1061/(ASCE)1076-0342(2009)15:3(162)