DOI QR코드

DOI QR Code

산업재해 감소율 제고를 위한 위험성평가 제도의 개선 방안 도출 : 중소규모 사업장을 중심으로

Identification an Improvement Plan for the Risk Assessment System to Increase the Reduction Rate of Industrial Accidents : Focus on Small and Medium-size Companies

  • 송호준 (대한산업안전협회) ;
  • 김범수 (금오공과대학교 산업공학부) ;
  • 신종규 (금오공과대학교 산업공학부) ;
  • 김상호 (금오공과대학교 산업공학부)
  • Song, Ho-Jun (Korea Industrial Safety Association) ;
  • Kim, Beom-Su (Department of lndustrial Engineering, Kumoh National Institute of Technology) ;
  • Shin, Jong-Gyu (Department of lndustrial Engineering, Kumoh National Institute of Technology) ;
  • Kim, Sang-Ho (Department of lndustrial Engineering, Kumoh National Institute of Technology)
  • 투고 : 2022.05.20
  • 심사 : 2022.06.21
  • 발행 : 2022.06.30

초록

The rate of industrial accident reduction is slowing down as the attention of the Ministry of Employment and Labor and related agencies on risk assessment systems decreased. this paper focuses on weakness of legal system for the risk assessment in recent years. A survey was conducted to identify the status and condition of the risk assessment system applying on small and medium-sized manufacturing companies. A set of questionnaires is designed to reflect various perspectives of the companies regarding the problems and solutions of the system. The results refer that differentiated instructions and support systems in response to the actual conditions of the companies are mandatory to reinforce the efficiency of risk assessment system.

키워드

참고문헌

  1. S. J. Song(2021), "A study on the actual condition of industrial accident prevention with accident prevention institution-Focusing on safety management agencies-." Master's thesis, Ulsan University.
  2. J. B. Baek(2012), "Special theme-Policy improvement tasks for the expanded implementation of the risk assessment policy." Safety Technology, 177:6-10.
  3. J. W. Jung(2014), "A study on the implementation of risk assessment system at workplace in Korea." Journal of the Korean Society of Safety, 29(3): 121-128. https://doi.org/10.14346/JKOSOS.2014.29.3.121
  4. R. Wilson, E. A. Crouch(1987), "Risk assessment and comparisons: An introduction." Science, 236(4799):267-270. https://doi.org/10.1126/science.3563505
  5. E. Zio(2018), "The future of risk assessment." Reliability Engineering & System Safety, 177: 176-190. https://doi.org/10.1016/j.ress.2018.04.020
  6. S. B. Kim(2021), "Legal study on risk assessment system in workspace for preventing industrial disaster." Doctoral dissertation, Dong-A University.
  7. H. I. Cheng, S. M. Shin, J. W. Jung, Y. H. Lee, H. A. Jang, S. B. Lee(2019), "A proposal for the improvement of risk assessment." Proceedings of 2019 Spring Conference of ESK, 29-29.
  8. KOSHA, https://kras.kosha.or.kr/information/danger1_page
  9. Occupational Safety and Health Research Institute(2014), Risk assessment expert training material. Ulsan, pp. 576-592.
  10. KOSHA, https://www.kosha.or.kr/kosha/business/rskassessmentb.do
  11. Korea Industrial Safety Association(2012), "International occupational safety and health trends-development of the European industrial safety and health incentive system." The Safety Technology, 173:74-74.
  12. N. S. N. Yiu, D. W. M. Chan, N. N. Sze, M. Shan, A. P. C. Chan(2019), "Implementation of safety management system for improving construction safety performance: A structural equation modelling approach." Buildings, 9(4):89. https://doi.org/10.3390/buildings9040089
  13. Y. H. Seo, I. S. Woo, C. Jang, M. H. Hwang(2015), "Research on effectiveness of risk assessment of construction industry by the self administered questionnaires." Korea Risk Management Society, 26:1-27.
  14. B. S. Oh(2014), "Suggestion-Evaluation status and reviews." Korean Industrial Health Association, 317:2-5.
  15. I. J. Shin(2013), "Comparative study on the institutional framework of risk assessment between German, UK and Korea, Japan in Asian Countries." Journal of the Korean Society of Safety, 28:151-157. https://doi.org/10.14346/JKOSOS.2013.28.1.151
  16. H. S. Rhee, W. C. Shin(2015), "A study on the risk assessment of the workplaces in the General Sawmill Industry." Journal of the Korea Safety Management & Science, 17:105-112.
  17. J. S. Kim(2018), "A study of industrial accident through risk assessment consulting." Master's thesis, Hansung University.
  18. T. Aven(2016), "Risk assessment and risk management: Review of recent advances on their foundation." European Journal of Operational Research, 253:1-13. https://doi.org/10.1016/j.ejor.2015.12.023
  19. J. H. Kim, T. K. Oh(2016), "A case study on the improvement of risk assessment by worker-oriented safety circle discussion in construction industry by the survey." Journal of the Korean Society of Safety, 31:82-88.
  20. C. H. Paek, U. R. Cho(2015), "A study on the optimization effectiveness of risk assessment in construction industry." Journal of the Korea Safety Management & Science, 17:15-22. https://doi.org/10.12812/KSMS.2015.17.3.15
  21. Y. R. Jang, S. S. Go(2018), "A risk assessment counterplan for reducing the accident rates in medium and small sized construction sites." Korean Institute of Construction Engineering and Management, 19:90-100.
  22. H. S. Woo(2016), "The limit of occupational safety management by criminal law and the adoption of risk assessment." Korean Journal of Comparative Criminal Law, 18:251-280. https://doi.org/10.23894/KJCCL.2016.18.2.010