References
- Afshar, A., Haddad, O.B., Marino, M.A., and Adams, B.J. (2007). "Honey-bee mating optimization (HBMO) algorithm for optimal reservoir operation." Journal of the Franklin Institute, Vol. 344, No. 5, pp. 452-462. https://doi.org/10.1016/j.jfranklin.2006.06.001
- Ahn, J.M., Lyu, S., and Kim, J.C. (2012). "Study of operation rules for flood control to Seomjin river dam using HEC-ResSim." Journal of Civil and Environmental Engineering Research, Vol. 32, No. 2B, pp. 93-101.
- Arunkumar, R., and Jothiprakash, V. (2012). "Optimal reservoir operation for hydropower generation using non-linear programming model." Journal of The Institution of Engineers (India): Series A, Vol. 93, No. 2, pp. 111-120. https://doi.org/10.1007/s40030-012-0013-8
- Berhe, F.T., Melesse, A.M., Hailu, D., and Sileshi, Y. (2013). "MODSIM-based water allocation modeling of Awash river basin, Ethiopia." Catena, Vol. 109, pp. 118-128. https://doi.org/10.1016/j.catena.2013.04.007
- Branche, E. (2015). Multipurpose water uses of hydropower reservoirs. Electricite de France-World Water Council (EDF-WWC), France.
- Branche, E. (2017). "The multipurpose water uses of hydropower reservoir: The share concept." Comptes Rendus Physique, Vol. 18, No. 7-8, pp. 469-478. https://doi.org/10.1016/j.crhy.2017.06.001
- Cha, S.H., and Park, G.B. (2004). "A study on estimate of evaluation indices of water supply capacity for multipurpose dam." Journal of Environmental Science International, Vol. 13, No. 3, pp. 197-204. https://doi.org/10.5322/JES.2004.13.3.197
- Chhuon, K., Herrera, E., and Nadaoka, K. (2016). "Application of integrated hydrologic and river basin management modeling for the optimal development of a multi-purpose reservoir project." Water Resources Management, Vol. 30, No. 9, pp. 3143-3157. https://doi.org/10.1007/s11269-016-1336-4
- Choi, S.J., Kim, S.D., Lee, D.R., and Moon, J.W. (2014). "Comparison of water supply reliability by dam operation method." Journal of Korea Water Resource Association, Vol. 47, No. 6, pp. 523-536. https://doi.org/10.3741/JKWRA.2014.47.6.523
- Chu, W.S., and Yeh, W.W.G. (1978). "A nonlinear programming algorithm for real time hourly reservoir operations." Journal of the American Water Resources Association, Vol. 14, No. 5, pp. 1048-1063. https://doi.org/10.1111/j.1752-1688.1978.tb02245.x
- Draper, A.J., Munevar, A., Arora, S.K., Reyes, E., Parker, N.L., Chung, F.I., and Peterson, L.E. (2004). "CalSim: Generalized model for reservoir system analysis." Journal of Water Resources Planning and Management, Vol. 130, No. 6, pp. 480-489. https://doi.org/10.1061/(ASCE)0733-9496(2004)130:6(480)
- Hashimoto, T., Stedinger, J.R., and Loucks, D.P. (1982). "Reliability, resiliency, and vulnerability criteria for water resource system performance evaluation." Journal of Water Resources Research, Vol. 18, No. 1, pp. 14-20. https://doi.org/10.1029/WR018i001p00014
- Jung, J.H., and Yoon, Y.N. (2021). Water resource design practice. Goomibook, pp. 265-266.
- Jung, Y.H., Jung, C.G., Jung, S.W., Park, J.Y., and Kim, S.J. (2012). "Estimation of upstream ungauged watershed streamflow using downstream discharge data." Journal of the Korean Society of Agricultural Engineers. Vol. 54, No. 6, pp. 169-176. https://doi.org/10.5389/KSAE.2012.54.6.169
- Kim, J., Read, L., Johnson, L.E., Gochis, D., Cifelli, R., and Han, H. (2020). "An experiment on reservoir representation schemes to improve hydrologic prediction: Coupling the national water model with the HEC-ResSim." Hydrological Sciences Journal, Vol. 65, No. 10, pp. 1652-1666. https://doi.org/10.1080/02626667.2020.1757677
- Kim, Y.B., Lee, M.W., and Jo, J.C. (2005). A study on the utilization of the Bukhan river basin through South-North Korea cooperation. Korea Research Institute for Human Settlements.
- Korea Meteorological Administration (KMA) (2020), Korean climate changes assessment report 2020. pp. 4-5.
- Labadie, J.W. (2004). "Optimal operation of multireservoir systems: State-of-the-art review." Journal of Water Resources Planning and Management, Vol. 130, No. 2, pp. 93-111. https://doi.org/10.1061/(ASCE)0733-9496(2004)130:2(93)
- Lee, D.H., Choi, C.W., Yu, M.S., and Yi, J.E. (2012). "Reevaluation of multi-purpose reservoir yield." Journal of Korea Water Resource Association. Vol. 45, No. 4, pp. 361-371. https://doi.org/10.3741/JKWRA.2012.45.4.361
- Lee, G.M., Kang, B.S., and Hong, I.P. (2008). "Cooperative framework for conflict mitigation and shared use of South-North Korean transboundary rivers." Journal of Civil and Environmental Engineering Research, Vol. 28, No. 5B, pp. 505-514.
- Lee, S.H., and Kang, T.U. (2006). "An evaluation method of water supply reliability for a dam by firm yield analysis." Journal of Korea Water Resource Association, Vol. 39, No. 5, pp. 467-478. https://doi.org/10.3741/JKWRA.2006.39.5.467
- Ministry of Environment (ME) (2009). Water environmental management in mid-watershed.
- Ministry of Environment (ME) and Ministry of Trade, Industry and Energy (MOTIE) (2019). A study on the optimal management of existing reservoirs to improve the water resource's system management.
- Oh, J.O., Lee, J.J., and Jun, S.M. (2021). "Development of method of discharge estimate at ungauged watershed by drainage area ratio method considering watershed characteristics." Journal of Crisisonomy, Vol. 17, No. 4, pp. 43-55.
- Osroosh, M., Makenanizadeh, H., and Torfi, S. (2012). "HEC-Res sim model for simulating utilization from reservoir in the form of multiple-dam." International Journal of Structronics & Mechatronics, pp. 1-6.
- Ozkaya, A., and Zerberg, Y. (2021). "Water storage change assessment in the Seyhan reservoir (Turkey) using HEC-ResSim model." Arabian Journal of Geosciences, Vol. 14, No. 6, pp. 1-12. https://doi.org/10.1007/s12517-020-06304-8
- Reis, L.F.R., Bessler, F.T., Walters, G.A., and Savic, D. (2006). "Water supply reservoir operation by combined genetic algorithm-linear programming (GA-LP) approach." Water Resources Management, Vol. 20, No. 2, pp. 227-255. https://doi.org/10.1007/s11269-006-8049-z
- Srivastava, D.K., and Awchi, T.A. (2009). "Storage-yield evaluation and operation of mula reservoir, India." Journal of Water Resources Planning and Management. Vol. 135, No. 6, pp. 414-425. https://doi.org/10.1061/(ASCE)0733-9496(2009)135:6(414)
- Stedinger, J.R., Sule, B.F., and Loucks, D.P. (1984). "Stochastic dynamic programming models for reservoir operation optimization." Water Resources Research, Vol. 20, No. 11, pp. 1499-1505. https://doi.org/10.1029/WR020i011p01499
- Tao, T., and Lennox, W.C. (1991). "Reservoir operations by successive linear programming." Journal of Water Resources Planning and Management, Vol. 117, No. 2, pp. 274-280. https://doi.org/10.1061/(ASCE)0733-9496(1991)117:2(274)
- Valeriano, O.C.S., Koike, T., Yang, K., and Yang, D. (2010). "Optimal dam operation during flood season using a distributed hydrological model and a heuristic algorithm." Journal of Hydrologic Engineering, Vol. 15, No. 7, pp. 580-586. https://doi.org/10.1061/(ASCE)HE.1943-5584.0000212
- Votruba, L., and Broza, V. (1989). Water management in reservoirs. Elsevier, Amsterdam, Nederland.
- Yang, H.K., and Choi, H.C. (2003). "Estimation of water quality environment in Youngsan and Seumjin river basins." Journal of the Korean Geographical Society, Vol. 38, No. 1, pp. 16-31.
- Yi, J.E., Lee, G.M., and Cha, K.U. (2012). "Idea on the improvement of water yield evaluation methodoloty." Magazine of Korea Water Resources Association, Vol. 45, No. 12, pp. 51-57.
- Zarri, L.J., Danner, E.M., Daniels, M.E., and Palkovacs, E.P. (2019). "Managing hydropower dam releases for water users and imperiled fishes with contrasting thermal habitat requirements." Journal of Applied Ecology, Vol. 56, No. 11, pp. 2423-2430. https://doi.org/10.1111/1365-2664.13478
- Zhao, T., Zhao, J., and Yang, D. (2014). "Improved dynamic programming for hydropower reservoir operation." Journal of Water Resources Planning and Management, Vol. 140, No. 3, pp. 365-374. https://doi.org/10.1061/(ASCE)WR.1943-5452.0000343