Estimating the water supply capacity of Hwacheon reservoir for multi-purpose utilization |
Lee, Eunkyung
(Department of Civil System Engineering, Ajou University)
Lee, Seonmi (Department of Civil System Engineering, Ajou University) Ji, Jungwon (Department of Civil System Engineering, Ajou University) Yi, Jaeeung (Department of Civil System Engineering, Ajou University) Jung, Soonchan (Department of Water Resources, Dongbu Engineering Co.) |
1 | Cha, S.H., and Park, G.B. (2004). "A study on estimate of evaluation indices of water supply capacity for multipurpose dam." Journal of Environmental Science International, Vol. 13, No. 3, pp. 197-204. DOI |
2 | Kim, J., Read, L., Johnson, L.E., Gochis, D., Cifelli, R., and Han, H. (2020). "An experiment on reservoir representation schemes to improve hydrologic prediction: Coupling the national water model with the HEC-ResSim." Hydrological Sciences Journal, Vol. 65, No. 10, pp. 1652-1666. DOI |
3 | Ahn, J.M., Lyu, S., and Kim, J.C. (2012). "Study of operation rules for flood control to Seomjin river dam using HEC-ResSim." Journal of Civil and Environmental Engineering Research, Vol. 32, No. 2B, pp. 93-101. |
4 | Branche, E. (2015). Multipurpose water uses of hydropower reservoirs. Electricite de France-World Water Council (EDF-WWC), France. |
5 | Reis, L.F.R., Bessler, F.T., Walters, G.A., and Savic, D. (2006). "Water supply reservoir operation by combined genetic algorithm-linear programming (GA-LP) approach." Water Resources Management, Vol. 20, No. 2, pp. 227-255. DOI |
6 | Chhuon, K., Herrera, E., and Nadaoka, K. (2016). "Application of integrated hydrologic and river basin management modeling for the optimal development of a multi-purpose reservoir project." Water Resources Management, Vol. 30, No. 9, pp. 3143-3157. DOI |
7 | Draper, A.J., Munevar, A., Arora, S.K., Reyes, E., Parker, N.L., Chung, F.I., and Peterson, L.E. (2004). "CalSim: Generalized model for reservoir system analysis." Journal of Water Resources Planning and Management, Vol. 130, No. 6, pp. 480-489. DOI |
8 | Jung, Y.H., Jung, C.G., Jung, S.W., Park, J.Y., and Kim, S.J. (2012). "Estimation of upstream ungauged watershed streamflow using downstream discharge data." Journal of the Korean Society of Agricultural Engineers. Vol. 54, No. 6, pp. 169-176. DOI |
9 | Korea Meteorological Administration (KMA) (2020), Korean climate changes assessment report 2020. pp. 4-5. |
10 | Oh, J.O., Lee, J.J., and Jun, S.M. (2021). "Development of method of discharge estimate at ungauged watershed by drainage area ratio method considering watershed characteristics." Journal of Crisisonomy, Vol. 17, No. 4, pp. 43-55. |
11 | Tao, T., and Lennox, W.C. (1991). "Reservoir operations by successive linear programming." Journal of Water Resources Planning and Management, Vol. 117, No. 2, pp. 274-280. DOI |
12 | Afshar, A., Haddad, O.B., Marino, M.A., and Adams, B.J. (2007). "Honey-bee mating optimization (HBMO) algorithm for optimal reservoir operation." Journal of the Franklin Institute, Vol. 344, No. 5, pp. 452-462. DOI |
13 | Valeriano, O.C.S., Koike, T., Yang, K., and Yang, D. (2010). "Optimal dam operation during flood season using a distributed hydrological model and a heuristic algorithm." Journal of Hydrologic Engineering, Vol. 15, No. 7, pp. 580-586. DOI |
14 | Votruba, L., and Broza, V. (1989). Water management in reservoirs. Elsevier, Amsterdam, Nederland. |
15 | Yang, H.K., and Choi, H.C. (2003). "Estimation of water quality environment in Youngsan and Seumjin river basins." Journal of the Korean Geographical Society, Vol. 38, No. 1, pp. 16-31. |
16 | Zarri, L.J., Danner, E.M., Daniels, M.E., and Palkovacs, E.P. (2019). "Managing hydropower dam releases for water users and imperiled fishes with contrasting thermal habitat requirements." Journal of Applied Ecology, Vol. 56, No. 11, pp. 2423-2430. DOI |
17 | Zhao, T., Zhao, J., and Yang, D. (2014). "Improved dynamic programming for hydropower reservoir operation." Journal of Water Resources Planning and Management, Vol. 140, No. 3, pp. 365-374. DOI |
18 | Lee, S.H., and Kang, T.U. (2006). "An evaluation method of water supply reliability for a dam by firm yield analysis." Journal of Korea Water Resource Association, Vol. 39, No. 5, pp. 467-478. DOI |
19 | Labadie, J.W. (2004). "Optimal operation of multireservoir systems: State-of-the-art review." Journal of Water Resources Planning and Management, Vol. 130, No. 2, pp. 93-111. DOI |
20 | Yi, J.E., Lee, G.M., and Cha, K.U. (2012). "Idea on the improvement of water yield evaluation methodoloty." Magazine of Korea Water Resources Association, Vol. 45, No. 12, pp. 51-57. |
21 | Arunkumar, R., and Jothiprakash, V. (2012). "Optimal reservoir operation for hydropower generation using non-linear programming model." Journal of The Institution of Engineers (India): Series A, Vol. 93, No. 2, pp. 111-120. DOI |
22 | Berhe, F.T., Melesse, A.M., Hailu, D., and Sileshi, Y. (2013). "MODSIM-based water allocation modeling of Awash river basin, Ethiopia." Catena, Vol. 109, pp. 118-128. DOI |
23 | Branche, E. (2017). "The multipurpose water uses of hydropower reservoir: The share concept." Comptes Rendus Physique, Vol. 18, No. 7-8, pp. 469-478. DOI |
24 | Choi, S.J., Kim, S.D., Lee, D.R., and Moon, J.W. (2014). "Comparison of water supply reliability by dam operation method." Journal of Korea Water Resource Association, Vol. 47, No. 6, pp. 523-536. DOI |
25 | Chu, W.S., and Yeh, W.W.G. (1978). "A nonlinear programming algorithm for real time hourly reservoir operations." Journal of the American Water Resources Association, Vol. 14, No. 5, pp. 1048-1063. DOI |
26 | Hashimoto, T., Stedinger, J.R., and Loucks, D.P. (1982). "Reliability, resiliency, and vulnerability criteria for water resource system performance evaluation." Journal of Water Resources Research, Vol. 18, No. 1, pp. 14-20. DOI |
27 | Jung, J.H., and Yoon, Y.N. (2021). Water resource design practice. Goomibook, pp. 265-266. |
28 | Lee, G.M., Kang, B.S., and Hong, I.P. (2008). "Cooperative framework for conflict mitigation and shared use of South-North Korean transboundary rivers." Journal of Civil and Environmental Engineering Research, Vol. 28, No. 5B, pp. 505-514. |
29 | Kim, Y.B., Lee, M.W., and Jo, J.C. (2005). A study on the utilization of the Bukhan river basin through South-North Korea cooperation. Korea Research Institute for Human Settlements. |
30 | Lee, D.H., Choi, C.W., Yu, M.S., and Yi, J.E. (2012). "Reevaluation of multi-purpose reservoir yield." Journal of Korea Water Resource Association. Vol. 45, No. 4, pp. 361-371. DOI |
31 | Ministry of Environment (ME) (2009). Water environmental management in mid-watershed. |
32 | Ministry of Environment (ME) and Ministry of Trade, Industry and Energy (MOTIE) (2019). A study on the optimal management of existing reservoirs to improve the water resource's system management. |
33 | Osroosh, M., Makenanizadeh, H., and Torfi, S. (2012). "HEC-Res sim model for simulating utilization from reservoir in the form of multiple-dam." International Journal of Structronics & Mechatronics, pp. 1-6. |
34 | Ozkaya, A., and Zerberg, Y. (2021). "Water storage change assessment in the Seyhan reservoir (Turkey) using HEC-ResSim model." Arabian Journal of Geosciences, Vol. 14, No. 6, pp. 1-12. DOI |
35 | Srivastava, D.K., and Awchi, T.A. (2009). "Storage-yield evaluation and operation of mula reservoir, India." Journal of Water Resources Planning and Management. Vol. 135, No. 6, pp. 414-425. DOI |
36 | Stedinger, J.R., Sule, B.F., and Loucks, D.P. (1984). "Stochastic dynamic programming models for reservoir operation optimization." Water Resources Research, Vol. 20, No. 11, pp. 1499-1505. DOI |