DOI QR코드

DOI QR Code

Future Direction of Mission Operation System for Satellite Constellation and the Automation Priority Evaluation

군집위성 임무운영시스템 발전방향 및 자동화 우선순위 평가

  • Received : 2022.01.18
  • Accepted : 2022.04.30
  • Published : 2022.06.30

Abstract

According to the Space Development Promotion Basic Plan, more than 110 satellites are expected to be deployed by 2031. Accordingly, the operation concept and technology for satellites constellation are required, compared to the existing few multi-satellite operations. It is essential to automate and optimize the mission operation system, for efficient operation of the satellite constellation, and preparations are urgently needed for the operation of satellite constellation in domestic as well. In this study, the development direction and strategy of the mission operation system applying automation and optimization for efficient operation of the satellite constellation are proposed. The framework for evaluating the automation level and priority of the mission operation system was developed, to identify the tasks to which automation should be applied preferentially.

우주개발진흥 기본계획에 따르면 2031년까지 110여 기의 위성이 운영될 것으로 예상되며, 이에 따라 기존의 소수의 다중위성 운영과는 다른 군집위성 운영을 위한 운영개념과 기술이 필요하다. 효율적인 군집위성 운영을 위해 임무운영시스템의 자동화 및 최적화가 필수적이며, 국내에서도 군집위성 운영을 위한 준비가 시급하다. 본 논문에서는 효율적인 군집위성 운영을 위해 자동화 및 최적화를 적용한 임무운영시스템 발전방향 및 추진전략을 제안하였으며, 임무운영시스템의 자동화 수준 및 우선순위 평가를 위한 프레임워크를 개발하여 자동화를 우선적으로 적용하여야 하는 업무를 식별하였다.

Keywords

Acknowledgement

본 연구는 한국항공우주연구원의 위성정보공공활용사업(다중위성 임무운영시스템 운영 최적화 연구, 2021040F21D-00)의 지원으로 수행되었습니다.

References

  1. D. Chung, "Prospect and Direction of Korean Ground System Development," Journal of The Korean Society for Aeronautical and Space Sciences, Vol. 44, No. 8, pp.718-727, 2016. https://doi.org/10.5139/JKSAS.2016.44.8.718
  2. J. Yun, H. Kim, H. Seol, K. Kwon, M. Lee, J. Lee, "The Future Directions and Strategy of the Domestic Mission Operation System for Satellite Constellation," 2021 KSAS Fall Conference, 2021.
  3. J. Lee, H. Kim, H. Chung, K. Ko, "Genetic Algorithm-based Scheduling for ground support of mulitple Satellites and Antennae Considering Operation Modes," International Journal of Aeronautical and Space Sciences, 17(1), 2016.
  4. Spangelo S, Cutler J, Gilson K, Cohn A, "Optimization-based scheduing for the single-satellite, multi-ground station communication problem," Comput Oper Res 57, pp.1-16, 2015. https://doi.org/10.1016/j.cor.2014.11.004
  5. Rao J, Soma P, Padmashree G, "Multi-satellite scheduling system for LEO satellite operations," In: proceedings of SpaceOps, Tokyo, 1998.
  6. Soma P, Venkateswarlu S, Santhalakshmi S, Bagchi T, Kumar S, "Mulit-satellite scheduling using genetic algorithms," In: Proceedings of ISTRAC/ISRO, SpaceOps, 2004.
  7. J. Lee, H. Kim, H. Chung, K. Ko, "Genetic algorithm-based scheduling for ground support of mulitple satellites and antennae considering operation modes," Int J Aeronaut Space Sci 17, pp.89-100, 2010. https://doi.org/10.5139/IJASS.2016.17.1.89
  8. Ben-Larbi, Mohamed Khalil, et al, "Towards the automated operations of large distributed satellite systems. Part 1: Review and paradigm shifts," Advances in Space Research 67.11, pp.3598-3619, 2021. https://doi.org/10.1016/j.asr.2020.08.009
  9. Ben-Larbi, Mohamed Khalil, et al, "Towards the automated operations of large distributed satellite systems. Part 2: Classifications and tools," Advances in Space Research 67.11, pp.3620-3637, 2021. https://doi.org/10.1016/j.asr.2020.08.018
  10. Gauthier Picard, "Auction-based and Distributed Optimization Approached for Scheduling Observations in Satellite Constellations with Exclusive Orbit Portions," International Workshop on Planning and Scheduling for Space(OWPSS 2021), 2021.
  11. S. Han, S. Baek, D. Jo, H. Kim, "Optimization of the Satellite Mission Scheduling Using Genetic Algorithms," Journal of the Korean Society for Aeronautical & Space Science, 36(12), pp.1163-1170, 2008. https://doi.org/10.5139/JKSAS.2008.36.12.1163
  12. M. Lee, S. Yoo, T. Kim, H. Kim, K. Kwon, M. Lee, J. Lee, "Misxed-Integer Linear Progamming Model for Scheduling the Missions and Communications of Multi-Satellites," 2021 KSAS Fall Conference, 2021.
  13. Robert Schwarz, et al, "A Probabilisic Model for the Determination of the Effects of Automation of Satellite Operations on Life Cycle Costs," Space mission operations and Ground Data System - SpaceOps '96, pp.954-962, 1996.
  14. Volker Schaus, et al, "Automated Constellation Management with Self Regulating Data-Economic Actors," 70th International Astronautical Congress, 2019.
  15. Dishan, Q., Chuan, H., Jin, L., & Manhao, M., "A dynamic scheduling method of earth-observing satellites by employing rolling horizon strategy," The Scientific World Journal, 2013.
  16. Fuchs, C., & Moll, F., "Ground Station Network Optimization for Space-to-Ground Optical Communication Links," Journal of Optical Communications and Networking 7(12), pp.1148-1159, 2015. https://doi.org/10.1364/JOCN.7.001148
  17. Gilles, Kbidy. "Flying Large Constellations Using Automation and Big Data," 14th International Conference on Space Operations, 2016.
  18. Hajjaji, Yosra, and Imed Riadh Farah, "Performance investigation of selected NoSQL databases for massive remote sensing image data storage," 2018 4th International Conference on Advanced Technologies for Signal and Image Processing (ATSIP), 2018.
  19. Arkali, G., Dawande, M., & Sriskandarajah, C., "Scheduling support times for satellites with overlapping visibilities," Production and Operations Management 17(2), pp.224-234, 2008. https://doi.org/10.3401/poms.1080.0016
  20. S. Baek, K. Cho, D. Lee, H. Kim, "A Comparison of Scheduling Optimization Algorithm for the Efficient Satellite Mission Scheduling Operation," Journal of the Korean Society for Aeronautical & Space Sciences 38(1), pp.48-57, 2010. https://doi.org/10.5139/JKSAS.2010.38.1.048
  21. S. Han, S. Baek, D. Jo, H. Kim, "Optimization of the Satellite Mission Scheduling Using Genetic Algorithms," Journal of the Korean Society for Aeronautical & Space Science 36(12), pp.1163-1170, 2008. https://doi.org/10.5139/JKSAS.2008.36.12.1163
  22. Ben-Larbi, Mohamed Khalil, et al, "Towards the automated operations of large distributed satellite systems. Part 1: Review and paradigm shifts," Advances in Space Research 67.11, pp.3598-3619, 2021. https://doi.org/10.1016/j.asr.2020.08.009
  23. Edoardo Benzi, Tiziana Casinelli, "Eutelsat Automatic Spacecraft Operations: System Evolution and Consolidation," SpaceOps 2010 Conference, 2010.
  24. S. Baek, S. Han, K. Cho, D. Lee, J. Yang, P. Bainum, H. Kim, "Development of a scheduling algorithm and GUI for autonomous satellite missions," Acta Astronautica 68(7), pp.1396-1402, 2011. https://doi.org/10.1016/j.actaastro.2010.08.011
  25. NASA, "NASA Work Breakdown Structure(WBS) Handbook", NASA, 2018.
  26. ESA-ESTEC, 2003, "Space Project Management", ECSS-M-10B
  27. A. Chauhan, R. Vaish, "Fluid Selection of Organic Rankine Cycle using Decicsion Making Approach," Hindawi Research Article, 2013.