Design and Application of Self-Lifting & Slewing Multi-Cranes Platform

  • Kun Zhang (China Construction Third Engineering Bureau Group Co., Ltd) ;
  • Kaiqiang Wang (China Construction Third Engineering Bureau Group Co., Ltd) ;
  • Bo Chen (China Construction Third Engineering Bureau Group Co., Ltd) ;
  • Qing Sun (China Construction Third Engineering Bureau Group Co., Ltd) ;
  • Hui Yang (China Construction Third Engineering Bureau Group Co., Ltd) ;
  • Xin Ba (China Construction Third Engineering Bureau Group Co., Ltd) ;
  • Jinming Zhao (China Construction Third Engineering Bureau Group Co., Ltd)
  • 발행 : 2022.06.01

초록

Tower crane is of great importance in the construction of high rise buildings. A self-lifting & slewing multi-cranes platform (referred to as crane slewing platform) was developed to optimize the configuration of tower cranes, as well as solve the problems of cooperative operation conflict between multiple cranes and other construction equipment and their respective climbing and occupying of construction period. The design and test of the slewing platform was introduced. By applying the slewing platform in the construction of Chengdu Greenland Center super high rise building project, some key technologies such as the configuration of cranes, the installation, construction and lifting of the slewing platform are implemented and validated. Up to now, the slewing platform has been safely lifted up 98 times in Chengdu Greenland Center project construction, and achieved good social and economic benefits.

키워드

참고문헌

  1. Journal: Ba X., Wang K., Liu X., et al.(2017). The key techniques of hydraulic lifting system for high-rise building structure construction platform. Construction Technology, 46(3), 80-84.
  2. Li D., Wang Z., Jiang G., et al. (2012). The tower crane easonable application in the construction of super highrise building. Industrial Construction, 42(12), 76-80.
  3. Liu Zh.v, Sun K., Guo F., et al. (2013). Development and application of the monitoring system for the variable micro bump support covered intelligent control jacking formwork in Wuhan Center. Construction Technology (19), 1-5.
  4. Peng K. (1980). Low-speed performance of the hydraulic motor and its test methods. Construction Machinery and Equipment (09), 29-31.
  5. Wang K., Chen B., Li D., et al. (2013). Design of the variable micro bump support covered intelligent control jacking formwork in Wuhan Center. Construction Technology, 42(19), 6-11.
  6. Wang K., Guo Y., Wu Y., et al. (2012). Design and research of assembled spatial steel truss platform of modularized low-position jacking formwork system. Construction Technology, 41(8),1-6.
  7. Xiang X., Ma Ch., Zhang W., et al. (2016). Selection and arrangement of group tower cranes for super tall residential building project. Building Construction, 38(9), 1275-1277.
  8. Zhang, K., Wang, H., Wang, K., et al. (2018). Significant progress in construction equipment of super high-rise building. International Journal of High Rise Buildings, 7(3), 243-253. https://doi.org/10.21022/IJHRB.2018.7.3.243