Acknowledgement
이 논문은 정부(과학기술정보통신부)의 재원으로 한국연구재단의 지원을 받아 수행된 연구임(NRF-2019R1A2C2003636).
References
- Bjerrum, L. (1963), "Allowable settlement of structures", Proceedings of the 3rd European Conference on Soil Mechanics and Foundation Engineering, Wiesbaden, Germany, Vol. 2, pp. 135-137.
- Byun, Y.S., Kim, H.G., Lee, S.S., Chun, B.S. (2010), "A study on pillar behavior of twin parallel tunnels by numerical approach", Journal of the Korean Geo-Environmental Society, Vol. 11, No. 8, pp. 49-55.
- Cheng, C.Y., Dasari, G.R., Chow, Y.K., Leung, C.F. (2007), "Finite element analysis of tunnel-soil-pile interaction using displacement controlled model", Tunnelling and Underground Space Technology, Vol. 22, No. 4, pp. 450-466. https://doi.org/10.1016/j.tust.2006.08.002
- Hoek, E., Brown, E.T. (1980), Underground Excavation in Rock, The Institution of Mining and Metallurgy, London, pp. 202-203.
- Kim, H.E., Kim, J.J., Lee, J.K., Yoo, H.K. (2017), "Stability analysis of an existing tunnel due to the excavation of a divergence tunnel emerging from double-deck tunnel", Journal of Korean Tunnelling and Underground Space Association, Vol. 19, No. 5, pp. 779-797. https://doi.org/10.9711/KTAJ.2017.19.5.779
- Kim, P.G., Kim, J.W. (2013), "Scale model studies for stability estimation of twin tunnels with small clearance", Tunnel and Underground Space, Vol. 23, No. 2, pp. 130-140. https://doi.org/10.7474/TUS.2013.23.2.130
- Kim, S.J., Kim, M.S., Kim, J.C., Yoo, Y.I., Oh, J.B., Oh, S.J. (2006), "Tunnel safety diagnosis in near-excavation by in-depth inspection of tunnel", Tunnel and Underground Space, Vol. 16, No. 4, pp. 347-356.
- Kim, Y.J., Im, C.G., Kang, S.G., Lee, Y.J. (2014), "A study on surface settlement characteristics according to the cohesive soil depth through laboratory model tests", Journal of Korean Tunnelling and Underground Space Association, Vol. 16, No. 6, pp. 507-520. https://doi.org/10.9711/KTAJ.2014.16.6.507
- Li, X.G., Yuan, D.J. (2012), "Response of a double-decked metro tunnel to shield driving of twin closely under-crossing tunnels", Tunnelling and Underground Space Technology, Vol. 28, pp. 18-30. https://doi.org/10.1016/j.tust.2011.08.005
- Matsuda, T., Terada, K., Igarashi, M., Miura, K. (1998), "Ground behavior and settlement control of twin tunnels in soil ground", Tunnels and Metropolises, Vol. 16, No. 2, pp. 1193-1198.
- Na, Y.S., Kim, Y.H., Lee, K.I., Kim, Y.S., Kim, B.J. (2020), "Effect of widening excavation in divergence section of a double-deck tunnel on its stability", Journal of Korean Tunnelling and Underground Space Association, Vol. 22, No. 4, pp. 435-450. https://doi.org/10.9711/KTAJ.2020.22.4.435
- Nam, K.M., Choi, M.K., Kim, J.J., Jafri, T.H., Yoo, H.K. (2017), "Stability analysis of an existing utility tunnel due to the excavation of a divergence tunnel emerging from double-deck tunnel", Journal of Korean Tunnelling and Underground Space Association, Vol. 19, No. 2, pp. 231-248. https://doi.org/10.9711/KTAJ.2017.19.2.231
- Peck, R.B. (1969), "Deep excavations and tunnelling in soft grouting", Proceedings of the 7th ICSMFE, Mexico, State-of-the-art Report, pp. 225-290.
- Xue, F., Zhang, M. (2020), "Stability of the excavation face on a shield tunnel crossing beneath an existing tunnel", Geotechnical Research, Vol. 7, No. 2, pp. 96-102. https://doi.org/10.1680/jgere.19.00027
- Yoo, C.S., Song, A.R. (2006), "Effects of tunnel construction on an existing tunnel lining", Journal of Korean Tunnelling and Underground Space Association, Vol. 8, No. 4, pp. 307-324.
- Yoo, K.H., Kim, J.G. (2011), "Evaluation of the influence of pillar width on the stability of a twin tunnel", Journal of Korean Tunnelling and Underground Space Association, Vol. 13, No. 2, pp. 115-131. https://doi.org/10.9711/KTAJ.2011.13.2.115