참고문헌
- Aouam T & Brahimi N. 2013. Integrated production planning and order acceptance under uncertainty: A robust optimization approach. European Journal of Operational Research 228(3):504-515. https://doi.org/10.1016/j.ejor.2013.02.010
- APICS. 2002. Apics dictionary. 10 ed. Alexandria, VA.
- Berry WL & Cooper MC. 1999. Manufacturing flexibility: Methods for measuring the impact of product variety on performance in process industries. Journal of Operations Management 17(2):163-178. https://doi.org/10.1016/S0272-6963(98)00033-3
- Bersch CV, Akkerman R, & Kolisch R. 2021. Strategic planning of new product introductions: Integrated planning of products and modules in the automotive industry. Omega 105:102515. https://doi.org/10.1016/j.omega.2021.102515
- Betts JM & Johnston RB. 2005. Just-in-time component replenishment decisions for assemble-to-order manufacturing under capital constraint and stochastic demand. International Journal of Production Economics. 95(1):51-70. https://doi.org/10.1016/j.ijpe.2003.10.020
- Chong HR, Bae KH, Lee MK, Kwon HM, & Hong SH. 2020. Quality strategy for building a smart factory in the fourth industrial revolution. J Korean Soc Qual Manag. 48(1):87-105. https://doi.org/10.7469/JKSQM.2020.48.1.87
- Djordjevic I, Petrovic D, & Stojic G. 2019. A fuzzy linear programming model for aggregated production planning (app) in the automotive industry. Computers in Industry 110:48-63. https://doi.org/10.1016/j.compind.2019.05.004
- Filho MG & Uzsoy R. 2010. The effect of shop floor continuous improvement programs on the lot size-cycle time relationship in a multi-product single-machine environment. International Journal of Advanced Manufacturing Technology 52(5-8):669-681. https://doi.org/10.1007/s00170-010-2770-8
- Forrester JW. 1958. Industrial dynamics - a major breakthrough for decision makers. Harvard Business Review 36(4):37-66.
- Ha JY, Lee SH, Na MH, Kim DH, Lim LH, & Lee YG. 2021. The analysis of the management efficiency and impact factors of smart greenhouse business entities - focusing on the business entities of strawberry cultivation in jeolla-do. J Korean Soc Qual Manag. 49(2):213-231. https://doi.org/10.7469/JKSQM.2021.49.2.213
- Hopp JW, Spearman ML. 2000. Factory physics : Foundations of manufacturing management. 2 ed. Chicago.
- Kang S-M. 2012. Analysis of subcontract business performance in consideration of company transactional relations : Shipbuilding, automobile, electrical and electronics. Korean Jouranl of Business Administration 25(4):2157-2183.
- Kwak S-I, Choi K-H, & Kim S-W. 2005. A dynamic resource allocation on service quality of internet shopping-mall. J Korean Soc Qual Manag. 33(4):21.
- Lee CW, Shin YH, Shang M, & Ryu YS. 2020. A study on improvement of organizational culture of the members of manufacturing and service industry quality control : Focused on mediation effect of job satisfaction. J Korean Soc Qual Manag. 48(1):29-50. https://doi.org/10.7469/JKSQM.2020.48.1.29
- Lee HC & Choi IC. 2004. Parallel machine scheduling for small-size batch production with sequence dependent setup times larger than processing times. Journal of the Korean Society of Supply Chain Management. 4:35-43.
- Pound ES, Bell JH, & Spearman ML. 2014. Factory physics for managers: How leaders improve performance in a post-lean six sigma world. McGraw-Hill Education.
- Salamati-Hormozi H, Zhang Z-H, Zarei O, & Ramezanian R. 2018. Trade-off between the costs and the fairness for a collaborative production planning problem in make-to-order manufacturing. Computers & Industrial Engineering 126:421-434. https://doi.org/10.1016/j.cie.2018.09.044
- Seo CS & An OH. 2019. A structural analysis of the factors affecting productivity performance: Based on sme of manufacturing certified the pms. J Korean Soc Qual Manag. 47(2):295-314. https://doi.org/10.7469/JKSQM.2019.47.2.295
- Sterman J, Oliva R, Linderman KW, & Bendoly E. 2015. System dynamics perspectives and modeling opportunities for research in operations management. Journal of Operations Management 39(40):1-5.
- Wong J-T, Su C-T, & Wang C-H. 2012. Stochastic dynamic lot-sizing problem using bi-level programming base on artificial intelligence techniques. Applied Mathematical Modelling 36(5):2003-2016. https://doi.org/10.1016/j.apm.2011.08.017