DOI QR코드

DOI QR Code

부하지속곡선을 이용한 삽교호수계 지류하천의 오염원인 분석

Estimation of Pollution Using Load Duration Curves at Streams in Sapgyo Watershed

  • 최정호 (충남연구원 물환경연구센터) ;
  • 김홍수 (충남연구원 물환경연구센터) ;
  • 조병욱 (충남연구원 물환경연구센터) ;
  • 박상현 (충남연구원 물환경연구센터) ;
  • 이무규 (충남연구원 물환경연구센터) ;
  • 이병구 (충남연구원 물환경연구센터)
  • Cho, Jeongho (Water Envirornment Research Center, Chungnam Institute) ;
  • Kim, Hongsu (Water Envirornment Research Center, Chungnam Institute) ;
  • Cho, Byunguk (Water Envirornment Research Center, Chungnam Institute) ;
  • Park, Sanghyun (Water Envirornment Research Center, Chungnam Institute) ;
  • Lee, Mukyu (Water Envirornment Research Center, Chungnam Institute) ;
  • Lee, byeonggu (Water Envirornment Research Center, Chungnam Institute)
  • 투고 : 2021.01.15
  • 심사 : 2021.04.27
  • 발행 : 2021.05.30

초록

In this study, 48 streams in the Sapgyo Watershed were selected, and the Load Duration Curves (LDC) were drawn up for each stream using water quality and flow monitoring over the last three years (2018-2020), and it was evaluated whether the target water quality was achieved for each flow section. As a result of evaluating whether or not the target water quality exceeded according to the LDC, it was found that 22 rivers exceeded the target water quality. Five rivers exceeded the target water quality due to point pollutant sources, 13 rivers exceeded the target water quality due to non-point pollutant sources, and 4 rivers exceeded the target water quality due to both point and non-point pollutant sources. Among the rivers that exceeded the target water quality due to point pollutant sources, which included domestic sewage of the untreated population, there is a need to reduce the influx of polluted loads by the untreated population. The use of eco-friendly fertilizers is recommended for rivers with a relatively high farmland ratio among rivers exceeding the target water quality due to non-point pollutant sources, and installation of boiling point reduction facilities that can reduce the amount of polluted load introduced during rainfall or manage water shores. In rivers with a large number of livestock breeding heads, the livestock houses located in these rivers need to be preferentially transferred to livestock manure treatment plants. Due to the high ratio of land area because of urbanization, initial rainwater treatment facilities are required to reduce the amount of pollutant load flowing into the river through the impermeable layer during rainfall.

키워드

참고문헌

  1. Choi, J. H., Kim, H. S., Cho, H. G., Park, S. H., and Lee, M. K. (2020). Water quality management planning for the lake Sapgyo by stream grading method, Journal of Korean Society on Water Environment, 36(3), 245-254. [Korean Literature] https://doi.org/10.15681/KSWE.2020.36.3.245
  2. Chungcheongnam-do. (2018). Basic plan of total maximum daily load, Research Report, Chungcheongnam-do, 1-4. [Korean Literature]
  3. Chungcheongnam-do. (2020). Water Integrated Management System, http://water.chungnam.net. (accessed Jan. 2021).
  4. Han, S., Shin, H. S., and Kim, S. (2007). Applicability of load duration curve to Nakdong river watershed management, Journal of Korean Society on Water Environment, 23(5), 620-627. [Korean Literature]
  5. Kal, B. S., Mun, H. S., Hong, S. H., Park, C. D., Min, K. O., and Park, J. B. (2019). A study on the applicability of load duration curve for the management of nonpoint source pollution in Seohwacheon basin, Journal of Korean Association of Geographic Information Stiudies, 23(3), 174-191. [Korean Literature]
  6. Kim, D. Y., Yoon, C. G., Rhee, H. O., Choi, J. H., and Hwang, H. S. (2019). Estimation of pollution contribution TMDL unit watershed in Han-river according to hydrological characteristic using flow duration curve, Journal of Korean Society on Water Environment, 35(6), 497-509. [Korean Literature] https://doi.org/10.15681/KSWE.2019.35.6.497
  7. Kim, H. S., Cho, H. G., Park, S. H., Lee, M. K., Kim, C. G., and Choi, J. H. (2019). Forecasting of changes in the water quality in Sapgyo-lake in accordance with implementation of total water pollutant load management system, Journal of Korean Society on Water Environment, 35(3), 209-223. [Korean Literature] https://doi.org/10.15681/KSWE.2019.35.3.209
  8. Ministry of Environment (ME). (2018). Middle watershed water environment management plan by Sapgyo-cheon, Research Report, Ministry of Environment. [Korean Literature]
  9. Ministry of Land, Infrastructure and Transport (MOLIT). (2019). Korea national spatial data infrastructure portal, http://data.nsdi.go.kr/dataset (accessed Jan. 2021).
  10. National Institute of Environment Research (NIER). (2020). Water emission management system, https://wems.nier.go.kr (accessed Jan. 2021).
  11. Park, S. H., Kim, H. S., Cho, H. G., Moon, E. H., and Choi, J. H. (2016). Watershed management plan through water quality monitoring for main branches of 4 water systems in Chungcheongnamdo, Journal of Korean Society on Water Environment, 32(2), 163-172. [Korean Literature] https://doi.org/10.15681/KSWE.2016.32.2.163
  12. United States Environmental Protection Agency Office of Wetlands, Oceans and Watersheds (U. S. EPA.). (2007). An approach for using load duration curves in the development of TMDLs, EPA 841-B-07-006, 1-68.