참고문헌
- AlGeelani, A., Dabous, S.A., and Venkatachalam, S. (2020). "Investigation of Project Delivery Risks in Public-Private-Partnership (PPP) Infrastructure Projects in UAE-A Stakeholder's Perspective." In 2020 Advances in Science and Engineering Technology International Conferences (ASET), IEEE, pp. 1-5.
- Baek, S, Han, S.H., and Jung, W. (2019). "A Comparative Analysis of Risk Assessment Depending on International Project Types." Construction Engineering and Management, 20(5), pp. 125-136.
- Balali, A., Moehler, R.C., and Valipour, A. (2020). "Ranking Cost Overrun Factors in the Mega Hospital Construction Projects using Delphi-SWARA Method: An Iranian Case Study." International Journal of Construction Management, pp. 1-9.
- Choi, J.W. (2017). "A Study on Relation between Construction Quality and Transaction Price of Apartment, Mh.D. Thesis, Hanyang University.
- Chun, Y.J., and Cho, J.H. (2017). "Financial Feasibility Study by Considering Risk Factors for High-Rise Development Project." Construction Engineering and Management, 18(4), pp. 3-16.
- Di Maddaloni, F., and Davis, K. (2018). "Project Manager' s Perception of the Local Communities' Stakeholder in Mega Projects." An Empirical Investigation in the UK, International Journal of Project Management, 36(3), pp. 542-565. https://doi.org/10.1016/j.ijproman.2017.11.003
- Gupta, V.K., and Thakkar, J.J. (2018). "A Quantitative Risk Assessment Methodology for Construction Project." Sadhana, 43(7), pp. 1-16. https://doi.org/10.1007/s12046-017-0766-x
- Jang, H.S. (2018). "Domestic Companies' Plan to Enter the ASEAN Construction Market: focusing on PPP projects." Construction Engineering and Management, 19(5), pp. 16-18.
- Jung, W., and Han, S.H. (2017). "Successful Winning Award Factors in Early Stage of International Public Private Partnership Projects." Construction Engineering and Management, 18(3), pp. 84-94.
- Kang, S., and Kim, S.C. (2016). "A Study on Composition and Application of Risk Management Planning and Procedure for Successful Overseas Construction Projects -Based on the PRINCE2 Methodology in the UK-." Construction Engineering and Management, 17(1), pp. 48-55.
- Kang, S.W., Kim, D.H., and Kim, K.T. (2018). "Cost Overrun in Construction of Railway Infrastructure: Causes & Implications." Journal of the Korean Society for Railway, 22(11), pp. 905-912. https://doi.org/10.7782/JKSR.2019.22.11.905
- Kersuliene, V., Zavadskas, E.K., and Turskis, Z. (2010). "Selection of Rational Dispute Resolution Method by Applying New Stepwise Weight Assessment Ratio Analysis (SWARA)." Journal of business economics and management, 11(2), pp. 243-258. https://doi.org/10.3846/jbem.2010.12
- Kim, D. Kim, H., and Jang, H. (2018). "An Analysis of the Casual Relations on Construction Project Managers Level Competency." Journal of the Architectural Institute of Korea Structure & Construction, 34(3), pp. 77-86. https://doi.org/10.5659/JAIK_SC.2018.34.3.77
- NezihTayyar, M.D. (2017). Comparison of Max100, SWARA and Pairwise Weight Elicitation Methods.
- Radovic, D., and Stevic, Z. (2018). "Evaluation and Selection of KPI in Transport Using SWARA Method." Transport & Logistics: The International Journal, 8(44), pp. 60-68.
- Rathi, A.S., and Khandve, P.V. (2014). "Study of Factors Influencing Cost Overruns: An Overview." International Journal of Science and Research, 5, p. 334.
- Safapour, E., Kermanshachi, S., Kamalirad, S., and Tran, D. (2019). "Identifying Effective Project-based Communication Indicators within Primary and Secondary Stakeholders in Construction Projects." Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 11(4), 04519028. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000332
- Sinesilassie, E.G., Tabish, S.Z.S., and Jha, K.N. (2018). "Critical Factors Affecting Cost Performance: A Case of Ethiopian Public Construction Projects." International Journal of Construction Management, 18(2), pp. 108-119. https://doi.org/10.1080/15623599.2016.1277058
- Ullah, K., Abdullah, A.H., and Nagapan, S. (2016). "A Framework for Avoiding Cost Overruns in Malaysian Construction Projects." International Journal of Advanced and Applied Sciences, 3(3), pp. 28-31.
- Valipour, A., Yahaya, N., Md Noor, N., Antucheviciene, J., and Tamosaitiene, J. (2017). "Hybrid SWARA-COPRAS Method for Risk Assessment in Deep Foundation Excavation Project: An Iranian Case Study." Journal of Civil Engineering and Management, 23(4), pp. 524-532. https://doi.org/10.3846/13923730.2017.1281842
- Van der Linden, S. (2014). "On the Relationship between Personal Experience, Affect and Risk Perception: The Case of Climate Change." European Journal of Social Psychology, 44(5), pp. 430-440. https://doi.org/10.1002/ejsp.2008
- Wang, C.M., Xu, B.B., Zhang, S.J., and Chen, Y.Q. (2016). "Influence of Personality and Risk Propensity on Risk Perception of Chinese Construction Project Managers." International Journal of Project Management, 34(7), pp. 1294-1304. https://doi.org/10.1016/j.ijproman.2016.07.004
- Yu, W.S. (2014). "Enhancement of Domestic Construction Companies' Risk Management Capabilities for Overseas Projects." Construction Engineering and Management, 15(5), pp. 27-30.
- Zolfani, S.H., Yazdani, M., and Zavadskas, E.K. (2018). "An Extended Stepwise Weight Assessment Ratio Analysis (SWARA) Method for Improving Criteria Prioritization Process." Soft Computing, 22(22), pp. 7399-7405. https://doi.org/10.1007/s00500-018-3092-2