References
- Choi, H., Park, J., Kim, E., & Jun, H. (2020). A Basic Study on the Derivation of Qualitative and Quantitative Indicators for the Evaluation of Work Efficiency in BIM, Proceeding of Annual Conference of the Architectural Institute of Korea, 29(4)
- Chung, J., & Kim, Y. (2012). Analysis of Core Ability of BIM Manager, Journal of the Architectural Institute of Korea, Structure & Construction, 28(1), 175-182 https://doi.org/10.5659/JAIK_SC.2012.28.1.175
- D, Sarkar., H, Raghavendra., & M, Ruparelia. (2015). Role of Key performance Indicators for evaluating the usage of BIM as tool for Facility Management of Construction Projects, Journal of Civil Structural Engineering Research, 5(4), 370-378
- E, Forman., & K, Peniwati. (1998). Aggregating individual judgements and priorities with the analytic hierarchy process, European Journal of Operational Research, vol.180, 165-169
- Kang, H. (2013). A Study on the Development of BIM Template to introduce of BIM in Small and Middle Architectural Design Firms using AHP method(master's thesis). Hanyang University, Seoul.
- Kim, S., Park, G., Song, B., Choi, C., & Chin, S. (2016). A Study on Setting Up Work Conditions for Improving Productivity of BIM-based Cost Estimation, Korean Journal of Construction Engineering and Management, 17(1), 56-65 https://doi.org/10.6106/KJCEM.2016.17.1.056
- Kim, W., Lee, B., & Kang, H. (2012). A Survey on the Utilization of BIM by Construction Companies and Its Implications, Construction & Economy Research Institute of Korea
- Lee, H. (2016b). BIM work Process and project execution status, EGA GROUP, Retrieved December 28, 2020 from https://prezi.com/bv_v8f_b30je/bim/
- Lee, J., Jung, J., & Oh, H. (2013). Work Efficiency Analysis of BIM Based Structural Drawing, Journal of the Architectural Institute of Korea, Structure & Construction, 29(6), 21-28 https://doi.org/10.5659/JAIK_SC.2013.29.6.21
- Lee, J., & Yi, J. (2011). A Study on BIM Capability Evaluation for Design Organizations, Journal of the Architectural Institute of Korea, Planning & Design, 27(6), 257-266
- Lee, Y. (2016a). An empirical Study on the efficiency of design document preparation applying BIM - Focused on office building design processes(master's thesis). The University of Seoul, Seoul.
- Ministry of SMEs and Startups. (2018). Survey on the Information Level of Korean Small and Medium Enterprise, Retrieved December 28, 2020 from https://www.mss.go.kr/site/smba/foffice/ex/statDB/StReportContentDetailView.do?gb=1&reSeq=1712
- S, Coates., & Y, Arayici. (2013). Operational Knowledge for BIM Adoption and Implementation for Lean Efficiency Gains, International Journal of Entrepreneurship and Innovation Management, 1(2), 1-22
- Roh, H. (2006). Public Policy Analysis, pybook, Seoul, p.247
- T.L, Saaty. (1980). The Analytic Hierarchy Process, Mcgraw-Hill, New York
- Song, A. (2007). A Research to Decide Investment Priority of Information and Communication Budget by Using AHP(master's thesis). Daegu Catholic University, Gyeongsan.