Abstract
According to the Framework Act on Sustainable Infrastructure Management, which has been enforced since 2020, reservoirs should be managed to minimize life cycle costs caused by aging through preemptive management such as systematic maintenance and performance improvement. For maintenance in consideration of the life cycle, it is essential to derive the end of life due to continuous performance degradation as the common period increases. For this purpose, it is necessary to develop a performance-predicting model for reservoirs. In this study, a reservoir was divided into main complex facilities to develop a model for the maintenance of the life cycle. A model was developed for each facility. For model development, maintenance information data were collected under management by the Rural Community Corporation. The data available for model development were selected by analyzing the collected data. The developed model was used to predict the expected life expectancy of the reservoir in the current maintenance system and the expected life expectancy in the case of no action. By using the developed model, it is expected that it will be possible to support decision making in operation management and maintenance while considering the life cycle of the reservoir.
2020년부터 시행된 「지속가능한 기반시설 관리기본법」에 의해 저수지는 체계적인 유지관리와 성능개선 등의 선제적인 관리로 노후화에 따른 생애주기 비용을 최소화하도록 관리해야 한다. 생애주기를 고려한 유지관리를 위해서는 공용기간이 증가함에 따라 지속적인 성능저하에 의해 수명이 종료되는 시점을 생애 주기적인 관점에서 도출하는 것이 필수적이며 이를 위해서 저수지의 성능저하예측 모델 개발이 요구된다. 본 논문에서는 저수지를 주요 복합시설인 제체, 여수로, 취수시설로 구분하고, 생애주기 유지관리를 위한 성능저하예측 모델을 개발하였다. 모델 개발을 위해 농어촌공사의 농업기반시설 시스템(RIMS; Rural Infrastructure Management System)이 관리 중인 유지관리 정보 데이터를 수집하였으며, 수집된 데이터를 통계적으로 분석하여 모델 개발에 활용 가능한 데이터를 선별하고 추세분석을 통해 모델을 개발하였다. 개발된 모델을 통해 저수지가 현행의 유지관리 체계에서 예상되는 기대수명과 미조치시 예상되는 기대수명을 예측하였으며, 현행 유지관리체계에서의 기대수명은 미조시치 기대수명보다 약 네 배가 증대되는 것으로 나타났다. 본 논문을 통해 제안된 모델을 활용하여 향후 저수지의 생애주기를 고려한 운영관리와 유지보수의 의사결정 지원이 가능할 것으로 판단된다.