Abstract

In this study, a new type of Durometer was invented by modifying the currently used Durometer with the hemisphere shaped needle to columnar shaped needle. The aim of the study is, hence, to provide the feasibility of the advanced Durometer for assessing setting time of the concrete. Generally, the finishing of concrete surface should be conducted to secure the smooth surface, improve the permeability, and prevent the plastic shrinkage cracking. Although this surface finishing work should be conducted during the plastic phase between initial and final setting, currently in practical situations, the timing of starting the finishing work was determined by the sense of the worker. To improve this situation, Kato Junji suggested to use the hemisphere and needle shaped Durometers to determine the initial and final setting time, respectively. However, in this case, there are difficulties of using two different Durometers and of occurring failure of the Durometer due to the intruded cement paste. To prove the feasibility of new typed Durometer, setting time and surface hardness were evaluated by applying for the concrete with various replacing ratios of fly-ash and coal gasification slag as an aggregate.

콘크리트 공사에서 타설완료 후 마감작업은 표면 평활화, 수밀성 향상, 침하 및 소성수축 균열방지 등의 목적으로 반드시 실시되어야 한다. 그런데, 표면마감작업은 초결과 종결 사이의 소성상태에서 실시 되어야 하는데, 종전의 경우는 기능공의 감에 의해 결정되었다. 이에 일본의 Kato junjj는 초결의 경우 반구형 듀로미터, 종결의 경우 핀형 듀로미터로 추정하는 것을 제안한 바 있다. 그렇지만, 2개의 듀로미터를 사용함의 번잡함 및 시멘트 페이스트의 기기내부 침입으로 인한 고장의 원인이 됨에 따라 본 연구에서는 반구형 듀로미터의 침을 원주형으로 변형시킨 개량형 듀로미터로 개발하였다. 이때 개량형 듀로미터의 사용 가능성은 결합재로 플라이애시의 치환율, 골재에 Coal gasification slag의 치환율을 변화시킨 콘크리트 배합에 적용하여 사용 가능을 분석하였다.

Keywords

References

  1. Korea Concrete Institue. Concrete working manual, Concrete curing. Korea: Kimoondang; 2010. p. 17-8.
  2. Han MC, Shin YS, Han ID. Estimation of the setting time of the high flowing concrete using durometer. Journal of the Architectural Institute of Korea. 2019 sep;35(9):143-50. https://doi.org/10.5659/JAIK_SC.2019.35.9.143
  3. Lee HJ, Han JH, Kim TW, Lee DY, Jang DB, Han MC. Blast furnace slag using durometer determination of the surface closing time of high fluidity concreate. Proceedings of the Korea Concrete Institute; 2018 May 02-04; Changwon, Korea. Seoul (Korea): Korea Concrete Institute; 2018. p. 353-4.
  4. Han MC, Han ID, Shin YS. Estimation of setting time of concrete using rubber hardness meter. Journals of the Korean Recycled Construction Resources Institute. 2019 Dec;7(4):358-66. https://doi.org/10.14190/JRCR.2019.7.4.358
  5. Han MC, Lee HJ. Setting time evaluation of high flowable ternary concrete mix using durometer. Journals of the Korean Recycled Construction Resources Institute. 2020 Mac;8(1):33-8. https://doi.org/10.14190/JRCR.2020.8.1.33
  6. Lee HJ, Chol YH, Lee YJ, Shin YS, Han MC, Han CG. An analysis on the possibility of using the improved durometer in estimating the setting time according to the temperature variation of high strength concrete. Proceedings of the Architectural Institute of Korea; 2019 Api 26-7; Seoul, Korea. Seoul (Korea): Architectural Institute of Korea; 2019. p. 620-1.
  7. Lee HJ, Sin SJ, Hyun SY, Shin YS, Jang DB, Han MC. Estimation of setting time for concrete replaced by blast-furnace slag using improved durometer. Proceedings of the Architectural Institute of Korea; 2019 Api 26-7; Seoul, Korea. Seoul (Korea): Architectural Institute of Korea; 2019. p. 622-3.
  8. Lee HJ, Han JH, Shin YS, Lee JS, Han ID, Han MC. Estimation of setting time of concrete incorporating blast-furnace slag using improved durometer. Proceedings of the Korea Concrete Institute; 2019 May 08-10: Jeju, Korea. Seoul (Korea): Korea Concrete Institute; 2019. p. 657-8.
  9. Lee HJ, Choi YH, Han JH, Shin YS, Han ID, Han MC. Estimation of setting time of high strength bs concrete through mock-up test using improved durometer. Proceedings of the Korea Concrete Institute; 2019 May 08-10: Jeju, Korea. Seoul (Korea): Korea Concrete Institute; 2019. p. 679-80.
  10. Lee HJ, Shin YS, Seo HG, Han ID, Han MC, Han CG. Utilization of improved durometer when estimating setting time of FA replacement concrete using CGS for fine aggregate. Proceedings of the The Korean Institute of Building Construction: 2019 Oct 31-Nov 01; Chungju, Korea. Seoul (Korea). The Korean Institute of Building Construction; 2019. p. 81-2.
  11. Lee HJ, Lee YJ, Hyun SY, Shin YS, Han MC. Han CG. Estimation of setting time using improved type durometer of fly ash concrete. Proceedings of The Korean Recycled Construction Resources Institute: 2019 Api 03-5; Wonju, Korea. Seoul (Korea). The Korean Recycled Construction Resources Institute; 2019. p. 79-80.
  12. Lee HJ, Choi YH, Lee JS, Han DY, Han ID. Han MC. Estimation of setting time using improved type durometer of powdered high fluidity concrete. Proceedings of The Korean Recycled Construction Resources Institute: 2019 Api 03-5; Wonju, Korea. Seoul (Korea). The Korean Recycled Construction Resources Institute; 2019. p. 17-8.