Abstract
The purpose of this study is to analyze in advance the problems and improvements that may occur during the construction of intermediate slabs and the loading of intermediate slabs through the preliminary structural safety evaluation of intermediate slabs for Test bed structures in deep depth tunnels. The Test bed construction can verify and confirm the results of the design and construction technology development of large depth double deck tunnel through the process, and can also be used as a learning site for engineers and the general public to speed up the time of underground space development. There will be an opportunity to do this. In particular, the design load of middle slab built inside the circular deep-depth double-sided tunnel cross-section varies depending on the construction method and the construction equipment load used. Class 3 truck load of KL-510 assumed to be common load to upper and middle slab during loading and installation is loaded on upper and lower slab with different working position for each load combination Analyzed.
이 연구의 목적은 대심도 복층터널 Test Bed 구조물에 대한 슬래브의 사전 구조안전성 평가를 통해 슬래브의 가설시와 공용하중 작용시에 발생 가능한 문제점과 개선점을 미리 분석하는 것이다. 대심도 복층터널의 설계 및 시공기술개발의 성과물을 Test Bed 구축을 과정을 통해 검증하고 확인할 수 있으며, 엔지니어 및 일반인들의 학습현장으로도 활용할 수 있어 지하공간 개발의 시기를 더욱 앞당길 수 있는 계기가 마련될 것이다. 특히, 원형의 대심도 복층터널 단면 내부에 구축되는 슬래브는 시공방법과 사용하는 시공장비에 따라 설계하중이 달라지며, 이번 Test Bed 구조체는 그 내부에 상부 슬래브 및 풍도슬래브를 전용 가설장비를 이용하여 설치하는 동안 가설장비하중과 상·하부 슬래브에 공용하중으로 가정된 KL-510의 3등급 트럭하중을 하중조합별 작용위치를 달리하며 상·하부 슬래브에 각각 재하하여 그 영향을 분석하였다.