Challenges to Prevent in Practice for Effective Cost and Time Control of Construction Projects

  • Olawale, Yakubu A. (WMG, University of Warwick)
  • 투고 : 2018.09.29
  • 심사 : 2019.12.09
  • 발행 : 2020.03.31

초록

Cost and time control of projects is important in preventing project failure. However, achieving effective cost and time control in practice is often challenging. The challenges of project cost and time control in practice are investigated by carrying out a questionnaire survey on the top 150 construction contractors in the UK followed by in-depth semi-structured interviews of practitioners from 15 construction companies in the country. Quantitative analysis reveals that design change is the most important factor inhibiting the ability of UK contractors from effectively controlling both the cost and time of construction projects. Four of the top five factors inhibiting effective cost control are also the top factors inhibiting effective time control albeit in a different order. These top factors-design changes, inaccurate evaluation of project time/duration, risk and uncertainty, non-performance of subcontractors and nominated suppliers were also found to be endogenous factors to the project. Additionally, qualitative analysis of the interviews reveals 16 key challenges to prevent for effective project cost and time control in practice. These are classified into four categorised based on where they stem from as follows; from the organisation (1. Lack of integration of cost and time during project control, 2. lack of management buy-in, 3. complicated project control systems and processes, 4. lack of a project control training regime); from the construction management/project management approach (5. Lapses in integration of interfaces, 6. project control not being implemented from the early stages of a project, 7. inefficient utilisation and control of labour, 8. limited time devoted to planning how a project will be controlled at the outset); from the client; (9. Excessive authorisation gates, 10. use of adversarial and non-collaborative forms of contracts, 11. communication problems within client set-up, 12. obstructive client representatives) and; from the project team (13. Lack of detailed/complete design, 14. lack of trust among the project partners, 15. limited time devoted to project control on site, 16. non-factual reporting). The study posits that knowledge of these project control inhibiting factors and challenges is the first step at ensuring they are avoided and enable the implementation of a more effective project cost and time control process in practice.

키워드

참고문헌

  1. Acebes, F., Pajares, J., Galan, J., and Lopez-Paredes, A., "A new approach for project control under uncertainty. Going back to the basics", International Journal of Project Management, vol. 32, no. 3, pp. 423-434, 2014. https://doi.org/10.1016/j.ijproman.2013.08.003
  2. Platje, A. and Seidel, H., "Breakthrough in multiproject management: how to escape the vicious circle of planning and control", International Journal of Project Management, vol. 11, no. 4, pp. 209-213, 1993. https://doi.org/10.1016/0263-7863(93)90037-N
  3. Besteiro, E., De Souza Pinto, J., and Novaski, O., "Success factors in project management", Business Management Dynamics, vol. 4, no. 9, pp. 19-34, 2015.
  4. Abdul-Rahman, Z. H., Berawi, M., Berawi, A., Mohamed, O., Othman, M.J.A., and Yahya, I., "Delay mitigation in the Malaysian construction industry", Journal of Construction Engineering and Management, vol. 132, no. 2, pp.125-133, 2006. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:2(125)
  5. Chan, A., "Time-cost relationship of public sector projects in Malaysia", International Journal of Project Management, vol. 19, pp. 223-229, 2001. https://doi.org/10.1016/s0263-7863(99)00072-1
  6. White, D. and Fortune, J., "Current practice in project management - An empirical study", International Journal of Project Management, vol. 20, no. 1, pp. 1-11, 2002. https://doi.org/10.1016/S0263-7863(00)00029-6
  7. Winch, G. and Kelsey, J., "What do construction project planners do?", International Journal of Project Management, vol. 23, no. 2, pp. 141-149, 2005. https://doi.org/10.1016/j.ijproman.2004.06.002
  8. Zou, Y. and Lee, S., "The impacts of change management practices on project change cost performance", Construction Management and Economics, vol. 26, no. 4, pp. 387-393, 2008. https://doi.org/10.1080/01446190801918714
  9. Thompson, C. and Walker, B., "Basics of research (Part 12): Qualitative research," Air Medical Journal, vol. 17, pp. 65-70, 1998. https://doi.org/10.1016/S1067-991X(98)90022-0
  10. Chang, A., "Reasons for cost and schedule increase for engineering design projects", Journal of Management in Engineering, vol. 18, pp. 29-36, 2002. https://doi.org/10.1061/(ASCE)0742-597X(2002)18:1(29)
  11. Iyer, K. and Jha, K., "Factors Affecting Cost Performance Evidence from Indian Construction Projects", International Journal of Project Management, vol. 23, pp. 283-295, 2005. https://doi.org/10.1016/j.ijproman.2004.10.003
  12. Larsen, J., Shen, G., Lindhard, S., and Brunoe, T., "Factors affecting schedule delay, cost overrun, and quality level in public construction projects", Journal of Management in Engineering, vol. 32, no. 1 pp. 04015032, 2016. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000391
  13. Aibinu, A. and Jagboro, G., "The effects of construction delays on project delivery in Nigerian construction industry," International Journal of Project Management, vol. 20, pp. 593-599, 2002. https://doi.org/10.1016/S0263-7863(02)00028-5
  14. Yong, Y. and Mustaffa, N., "Critical success factors for Malaysian construction projects: an empirical assessment", Construction Management and Economics, vol. 31, no. 9, pp. 959-978, 2013. https://doi.org/10.1080/01446193.2013.828843
  15. Akintoye, A., Fitzgerald, E. "A survey of current cost estimating practices in the UK", Construction Management and Economics, vol. 18, no. 2, pp. 161-172, 2000. https://doi.org/10.1080/014461900370799
  16. Barraza, G. and Bueno, R., "Probabilistic control of project performance using control limit curves", Journal of Construction Engineering and Management, vol. 133, no. 12, pp. 957-965, 2007. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:12(957)
  17. Chan, P., Ho, D., and Tam, C., (2001) "Design and build project success: multivariate analysis", Journal of Construction Engineering and Management, vol. 127, no. 2, pp. 93-100, 2001. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:2(93)
  18. Cho, K., Hong, T., and Hyun, C., (2010) "Integrated schedule and cost model for repetitive construction process", Journal of Management in Engineering, vol. 26, no. 2, pp. 78-88, 2010. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000009
  19. Flyvbjerg, B., Holm, M., and Buhl, S., "How common and how large are cost overruns in transport infrastructure projects?" Transport Reviews, vol. 23, no. 3, pp. 71-88, 2003. https://doi.org/10.1080/01441640309904
  20. Gibson, G., Wang, Y., Cho, C., and Pappas, M., (2006) "What is preproject planning anyway?" Journal of Management in Engineering, vol. 22, no. 1, pp. 35-42, 2006. https://doi.org/10.1061/(ASCE)0742-597X(2006)22:1(35)
  21. Jung, Y. and Woo, S., "Flexible work breakdown structure for integrated cost and schedule control", Journal of Construction Engineering and Management, vol. 130, no. 5, pp. 616-625, 2004. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:5(616)
  22. Kim, S. and Liu, L. "Cost information models for managing multiple projects". Journal of Construction Engineering and Management, vol. 133, no. 12, pp. 966-974, 2007. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:12(966)
  23. Koga, Y., Chua, D., Loh, P. and Jaselskis, E., "Key determinants for construction schedule performance", International Journal of Project Management, vol. 17, no. 6, pp. 351-359, 1999. https://doi.org/10.1016/S0263-7863(98)00058-1
  24. Larson, E., "Project partnering: Results of study of 280 construction projects", Journal of Management in Engineering, vol. 11, no. 2, pp. 30-35, 1995. https://doi.org/10.1061/(ASCE)0742-597X(1995)11:2(30)
  25. Laufer, A. and Tucker, R., "Is construction project planning really doing its job? A critical examination of focus, role and process", Construction Management and Economics, vol. 5, no. 3, pp. 243-266, 1987. https://doi.org/10.1080/01446198700000023
  26. Lee, S., Thomas, S., Tucker, R., "The relative impacts of selected practices on project cost and schedule", Construction Management and Economics, vol. 23, no. 5, pp. 545-553, 2005. https://doi.org/10.1080/01446190500040232
  27. Leu, S., Chen, A., and Yang, C., "A GA-based fuzzy optimal model for construction time-cost trade-off" International Journal of Project Management, vol. 19, pp. 47-58, 2001. https://doi.org/10.1016/S0263-7863(99)00035-6
  28. Sanchez, Otavio Prospero, Terlizzi, Marco Alexandre, Cesar de Moraes, Heverton Roberto de Oliveira (2017) Cost and time project management success factors for information systems development projects, IJPM (35), 1608-1626.
  29. Kanwal, N., Zafar, M., Bashir, S., (2017), "The combined effects of managerial control, resource commitment, and top management support on the successful delivery of information systems projects", vol. 35, pp. 1459-1465, 2017. https://doi.org/10.1016/j.ijproman.2017.08.007
  30. Young, R. and Poon, S., "Top management support-almost always necessary and sometimes sufficient for success: Findings from a fuzzy set analysis" International Journal of Project Management, vol. 31, pp. 94-957, 2013.
  31. Bryde, D., Unterhitzenberger, C., and Jober, R., "Conditions of success for earned value analysis in projects, International Journal of Project Management, vol. 36, pp. 474-484, 2018. https://doi.org/10.1016/j.ijproman.2017.12.002
  32. Ling, F., "How project managers can better control the performance of design-build projects", International Journal of Project Management, vol. 22, no. 6, pp. 477-488, 2004. https://doi.org/10.1016/j.ijproman.2003.09.003
  33. Ling, Y., Low, S., Wang, S., and Lim, H., "Key project management practices affecting Singaporean firms' project performance in China", International Journal of Project Management, vol. 27, no. 1, pp. 59-71, 2009. https://doi.org/10.1016/j.ijproman.2007.10.004
  34. Marco, A., Briccallero, D., Rafele, C., "Cost and schedule monitoring of industrial building projects: Case study", Journal of Construction Engineering and Management, vol. 135, no. 9, pp. 853-862, 2009. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000055
  35. Milosevic, D. and Patanakul, P., "Standardised project management may increase development projects success" International Journal of Project Management, vol. 23, no. 3, pp. 181-192, 2005. https://doi.org/10.1016/j.ijproman.2004.11.002
  36. Ritchie, L. and Spencer, W. O'Connor, "Carrying out qualitative analysis", in: Qualitative research practice: A guide for social science students and researchers, Eds, J. Ritchie, J. Lewis, SAGE publications, London, pp. 219-262, 2003.
  37. Olawale, Y. and Sun, M., "PCIM: Project Control and Inhibiting Factors Management Model", Journal of Management in Engineering, vol. 29, no. 1, pp. 60-70, 2013. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000125
  38. Olawale, Y. and Sun, M., (2015) "Construction project control in the UK: Current practice, existing problems and recommendations for future improvements", International Journal of Project Management, vol, 33 no. 3, pp. 623-637, 2015. https://doi.org/10.1016/j.ijproman.2014.10.003