References
- Acebes, F., Pajares, J., Galan, J., and Lopez-Paredes, A., "A new approach for project control under uncertainty. Going back to the basics", International Journal of Project Management, vol. 32, no. 3, pp. 423-434, 2014. https://doi.org/10.1016/j.ijproman.2013.08.003
- Platje, A. and Seidel, H., "Breakthrough in multiproject management: how to escape the vicious circle of planning and control", International Journal of Project Management, vol. 11, no. 4, pp. 209-213, 1993. https://doi.org/10.1016/0263-7863(93)90037-N
- Besteiro, E., De Souza Pinto, J., and Novaski, O., "Success factors in project management", Business Management Dynamics, vol. 4, no. 9, pp. 19-34, 2015.
- Abdul-Rahman, Z. H., Berawi, M., Berawi, A., Mohamed, O., Othman, M.J.A., and Yahya, I., "Delay mitigation in the Malaysian construction industry", Journal of Construction Engineering and Management, vol. 132, no. 2, pp.125-133, 2006. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:2(125)
- Chan, A., "Time-cost relationship of public sector projects in Malaysia", International Journal of Project Management, vol. 19, pp. 223-229, 2001. https://doi.org/10.1016/s0263-7863(99)00072-1
- White, D. and Fortune, J., "Current practice in project management - An empirical study", International Journal of Project Management, vol. 20, no. 1, pp. 1-11, 2002. https://doi.org/10.1016/S0263-7863(00)00029-6
- Winch, G. and Kelsey, J., "What do construction project planners do?", International Journal of Project Management, vol. 23, no. 2, pp. 141-149, 2005. https://doi.org/10.1016/j.ijproman.2004.06.002
- Zou, Y. and Lee, S., "The impacts of change management practices on project change cost performance", Construction Management and Economics, vol. 26, no. 4, pp. 387-393, 2008. https://doi.org/10.1080/01446190801918714
- Thompson, C. and Walker, B., "Basics of research (Part 12): Qualitative research," Air Medical Journal, vol. 17, pp. 65-70, 1998. https://doi.org/10.1016/S1067-991X(98)90022-0
- Chang, A., "Reasons for cost and schedule increase for engineering design projects", Journal of Management in Engineering, vol. 18, pp. 29-36, 2002. https://doi.org/10.1061/(ASCE)0742-597X(2002)18:1(29)
- Iyer, K. and Jha, K., "Factors Affecting Cost Performance Evidence from Indian Construction Projects", International Journal of Project Management, vol. 23, pp. 283-295, 2005. https://doi.org/10.1016/j.ijproman.2004.10.003
- Larsen, J., Shen, G., Lindhard, S., and Brunoe, T., "Factors affecting schedule delay, cost overrun, and quality level in public construction projects", Journal of Management in Engineering, vol. 32, no. 1 pp. 04015032, 2016. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000391
- Aibinu, A. and Jagboro, G., "The effects of construction delays on project delivery in Nigerian construction industry," International Journal of Project Management, vol. 20, pp. 593-599, 2002. https://doi.org/10.1016/S0263-7863(02)00028-5
- Yong, Y. and Mustaffa, N., "Critical success factors for Malaysian construction projects: an empirical assessment", Construction Management and Economics, vol. 31, no. 9, pp. 959-978, 2013. https://doi.org/10.1080/01446193.2013.828843
- Akintoye, A., Fitzgerald, E. "A survey of current cost estimating practices in the UK", Construction Management and Economics, vol. 18, no. 2, pp. 161-172, 2000. https://doi.org/10.1080/014461900370799
- Barraza, G. and Bueno, R., "Probabilistic control of project performance using control limit curves", Journal of Construction Engineering and Management, vol. 133, no. 12, pp. 957-965, 2007. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:12(957)
- Chan, P., Ho, D., and Tam, C., (2001) "Design and build project success: multivariate analysis", Journal of Construction Engineering and Management, vol. 127, no. 2, pp. 93-100, 2001. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:2(93)
- Cho, K., Hong, T., and Hyun, C., (2010) "Integrated schedule and cost model for repetitive construction process", Journal of Management in Engineering, vol. 26, no. 2, pp. 78-88, 2010. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000009
- Flyvbjerg, B., Holm, M., and Buhl, S., "How common and how large are cost overruns in transport infrastructure projects?" Transport Reviews, vol. 23, no. 3, pp. 71-88, 2003. https://doi.org/10.1080/01441640309904
- Gibson, G., Wang, Y., Cho, C., and Pappas, M., (2006) "What is preproject planning anyway?" Journal of Management in Engineering, vol. 22, no. 1, pp. 35-42, 2006. https://doi.org/10.1061/(ASCE)0742-597X(2006)22:1(35)
- Jung, Y. and Woo, S., "Flexible work breakdown structure for integrated cost and schedule control", Journal of Construction Engineering and Management, vol. 130, no. 5, pp. 616-625, 2004. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:5(616)
- Kim, S. and Liu, L. "Cost information models for managing multiple projects". Journal of Construction Engineering and Management, vol. 133, no. 12, pp. 966-974, 2007. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:12(966)
- Koga, Y., Chua, D., Loh, P. and Jaselskis, E., "Key determinants for construction schedule performance", International Journal of Project Management, vol. 17, no. 6, pp. 351-359, 1999. https://doi.org/10.1016/S0263-7863(98)00058-1
- Larson, E., "Project partnering: Results of study of 280 construction projects", Journal of Management in Engineering, vol. 11, no. 2, pp. 30-35, 1995. https://doi.org/10.1061/(ASCE)0742-597X(1995)11:2(30)
- Laufer, A. and Tucker, R., "Is construction project planning really doing its job? A critical examination of focus, role and process", Construction Management and Economics, vol. 5, no. 3, pp. 243-266, 1987. https://doi.org/10.1080/01446198700000023
- Lee, S., Thomas, S., Tucker, R., "The relative impacts of selected practices on project cost and schedule", Construction Management and Economics, vol. 23, no. 5, pp. 545-553, 2005. https://doi.org/10.1080/01446190500040232
- Leu, S., Chen, A., and Yang, C., "A GA-based fuzzy optimal model for construction time-cost trade-off" International Journal of Project Management, vol. 19, pp. 47-58, 2001. https://doi.org/10.1016/S0263-7863(99)00035-6
- Sanchez, Otavio Prospero, Terlizzi, Marco Alexandre, Cesar de Moraes, Heverton Roberto de Oliveira (2017) Cost and time project management success factors for information systems development projects, IJPM (35), 1608-1626.
- Kanwal, N., Zafar, M., Bashir, S., (2017), "The combined effects of managerial control, resource commitment, and top management support on the successful delivery of information systems projects", vol. 35, pp. 1459-1465, 2017. https://doi.org/10.1016/j.ijproman.2017.08.007
- Young, R. and Poon, S., "Top management support-almost always necessary and sometimes sufficient for success: Findings from a fuzzy set analysis" International Journal of Project Management, vol. 31, pp. 94-957, 2013.
- Bryde, D., Unterhitzenberger, C., and Jober, R., "Conditions of success for earned value analysis in projects, International Journal of Project Management, vol. 36, pp. 474-484, 2018. https://doi.org/10.1016/j.ijproman.2017.12.002
- Ling, F., "How project managers can better control the performance of design-build projects", International Journal of Project Management, vol. 22, no. 6, pp. 477-488, 2004. https://doi.org/10.1016/j.ijproman.2003.09.003
- Ling, Y., Low, S., Wang, S., and Lim, H., "Key project management practices affecting Singaporean firms' project performance in China", International Journal of Project Management, vol. 27, no. 1, pp. 59-71, 2009. https://doi.org/10.1016/j.ijproman.2007.10.004
- Marco, A., Briccallero, D., Rafele, C., "Cost and schedule monitoring of industrial building projects: Case study", Journal of Construction Engineering and Management, vol. 135, no. 9, pp. 853-862, 2009. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000055
- Milosevic, D. and Patanakul, P., "Standardised project management may increase development projects success" International Journal of Project Management, vol. 23, no. 3, pp. 181-192, 2005. https://doi.org/10.1016/j.ijproman.2004.11.002
- Ritchie, L. and Spencer, W. O'Connor, "Carrying out qualitative analysis", in: Qualitative research practice: A guide for social science students and researchers, Eds, J. Ritchie, J. Lewis, SAGE publications, London, pp. 219-262, 2003.
- Olawale, Y. and Sun, M., "PCIM: Project Control and Inhibiting Factors Management Model", Journal of Management in Engineering, vol. 29, no. 1, pp. 60-70, 2013. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000125
- Olawale, Y. and Sun, M., (2015) "Construction project control in the UK: Current practice, existing problems and recommendations for future improvements", International Journal of Project Management, vol, 33 no. 3, pp. 623-637, 2015. https://doi.org/10.1016/j.ijproman.2014.10.003