DOI QR코드

DOI QR Code

Analysis on Research Trend of Productivity Using Text Mining - Focusing on KSCE Journal -

텍스트 마이닝을 통한 건설 생산성 분야의 연구동향 분석 - KSCE 저널을 중심으로 -

  • Gu, Bongil (Housing & Building Division, Daewoo Engineering & Construction) ;
  • Huh, Youngki (Department of Architectural Engineering, Pusan National University)
  • 구본길 (대우건설 주택건축사업본부) ;
  • 허영기 (부산대학교 건축공학과)
  • Received : 2020.01.27
  • Accepted : 2020.02.19
  • Published : 2020.03.31

Abstract

The relationship between keywords, found in all productivity related papers published in the KSCE journal for last 15 years, were analyzed in order to reveal a research trend in the area using text mining and A-Priori algorithm. As the results, it is found that the word of 'productivity' is most closely related to the words of 'work' and 'labor'. Futhermore, the word is somewhat related to those of 'factor', 'model', simulation', and 'work time'. It is also revealed that, on the other hand, the words of 'machine' and 'equipment' have little relationships with the keyword. This research will be a great help for academia to understand a research trend in the area of construction productivity.

국토교통부가 2017년 12월에 발표한 제6차 건설기술진흥기본계획에 따르면, 건설기술혁신 등을 통해 2022년까지 건설 노동생산성을 40% 향상하는 것을 주요 목표로 하고 있다. 또한, 건설업계 및 학계에서는 건설 생산성 향상을 위해 지속적으로 다양한 연구 및 개발을 해오고 있다. 본 연구에서는 과거 15년간 대한토목학회 영문논문집에 발표된 생산성(Productivity) 관련 논문을 대상으로 어 프라이오리(A Priori) 알고리즘을 활용하여 키워드(Keyword) 간의 상관관계를 분석하였다. 분석 결과, 생산성 연구 키워드는 '작업(Work)' 및 '노무 인력(Labor)' 단어와 연관성이 매우 높은 것으로 나타났으며 생산성 영향요소, 생산성 모델과 시뮬레이션, 그리고 작업 시간에 따른 생산성 등이 키워드로 주로 연구되고 있음이 밝혀졌다. 또한, 건설기계(Machine) 혹은 장비(Equipment)와의 상관성은 낮은 것으로 분석되었다. 본 연구는 텍스트 마이닝(Text Mining)을 활용하여 국내 토목 분야에서 이루어진 생산성 관련 연구들의 개략적인 상관성과 경향을 분석하였으며, 특정 분야에서 이루어지고 있는 연구 동향 분석의 새로운 방안을 제시하였다.

Keywords

References

  1. Ahiaga-Dagbui, D.D., and Smith S.D. (2014). "Dealing with construction cost overruns using data mining." Construction Management and Economics, Taylor & Francis, 32, pp. 682-694. https://doi.org/10.1080/01446193.2014.933854
  2. Chen, Q., Garcia, D.S., and Adey, B.T. (2018). "Construction automation: Research areas, industry concerns and suggestions for advancement." Automation in Construction, 94, pp. 22-38. https://doi.org/10.1016/j.autcon.2018.05.028
  3. Iranmanesh, H., Skandari, M.R., and Allahverdiloo, M. (2009). "Finding Pareto optimal front for the multi-mode time, cost quality trade-off in project scheduling." World Academy of Science, Engineering and Technology, 40, pp. 346-350.
  4. Jo, T.H. (2001). "The Concepts and applications of text mining." Journal of Scientific & Technological Knowledge Infrastructure, KISTI, 5(1), pp. 76-85.
  5. Kim, J.A., and Kim, B.S. (2019). "Characteristics Analysis of Seasonal Construction Site Fall Accident using Text Mining." Korean Journal of Construction Engineering and Management, KICEM, 20(3), pp. 113-121. https://doi.org/10.6106/KJCEM.2019.20.3.113
  6. Lee, S.I., Lim, S.H., Cho, K.M., and Kim, T.H. (2017). "Research Trend on Construction Automation Technology for the Fourth Industrial Revolution." Korean Journal of Construction Engineering and Management, KICEM, 2017(11), pp. 250-253.
  7. Lee, S. (2018). "Analysis of Domestic Existing Countermeasures Against Climate Change Using Language Network Analysis." MS thesis, Ewha Womans University, Seoul.
  8. McNicholas, P.D., Murphy, T.B., O' and Regan, M. (2008). "Standardising the lift of an association rule." Computational Statistics & Data Analysis, 52(10), pp. 4712-4721. https://doi.org/10.1016/j.csda.2008.03.013
  9. Suneetha, K.R., and Krishnamoorti, R. (2010). "Advanced version of a priori algorithm." 2010 First International Conference on Integrated Intelligent Computing, IEEE, pp. 238-245.