References
- Daube D, Vollrath S, Alfen HW. A comparison of project finance and the forfeiting model as financing forms for PPP projects in Germany. International Journal of Project Management. 2008 May;26(4):376-87. https://doi.org/10.1016/j.ijproman.2007.07.001
- Merrow EW. Industrial megaprojects: concepts, strategies, and practices for success. Hoboken:John Wiley &Sons; 2011. 384p.
- Jun SH. Problem analysis and improvement strategy for overseas plant construction by EPC lump-sum turnkey system [master thesis]. [Seoul (Korea)]: Chung-Ang University; 2009. 95 p.
- Kwon TW. The framework development of EPC project claims management system[master thesis]. [Pohang (Korea)]. Pohang University of Science and Technology. 2015. 98 p.
- Kululanga GK, Kuotcha W, McCaffer R, Edum-Fotwe F. Construction contractors' claim process framework. Journal of Construction Engineering and Management. 2001 Aug;127(4):309-14.https://doi.org/10.1061/(ASCE)0733-9364 (2001)127:4(309)
- Hartman FT, Snelgrove P, Ashrafi R. Appropriate risk allocation in lump-sum contracts-who should take the risk. Cost Engineering. 1998 Jul;40(7):21-6.
- Construction Industry Institute. Equitable risk allocation: a legal perspective. Texas: Construction Industry Institute, Austin. 2007. 62 P.
- Kim SH. The research on standard contract conditions of oversea construction project(FIDIC) [master thesis]. [Seoul (Korea)]: Seoul National University. 2014. 394 p.
- Ashley DB, Dunlop JR, Parker MM. Impact of risk allocation and equity in construction contracts: an overview of indemnification, consequential damages, differing conditions &delay clauses. Texas: Construction Industry Institute, Austin. 1988. 432 p.
- Ibbs CW. Determining the impact of various construction contract types and clauses on project performance. Texas: Construction Industry Institute, Austin. 1986. 227 p.
- Scott S, Harris RA. United kingdom construction claims: views of professionals. Journal of Construction Engineering and Management. 2004 Oct;130(5):734-41. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:5(734)
- Yoon JS, Yoo BE. A study of analyzing claim factor and making strategies to prevent claim in early stage for architectural turn-key project. Journal of the Korea Institute of Building Construction. 2006 May;6(1):93-9. https://doi.org/10.5345/JKIC.2006.6.1.093
- Abdul-Malak MAU, El-Saadi MMH, Abou-Zeid MG. Process model for administrating construction claims. Journal of Management in Engineering. 2002 Apr;18(2):84-94. https://doi.org/10.1061/(ASCE)0742-597X(2002)18:2(84)
- Hegab MY, Nassar KM. Decision support system for commencement delay claims. Practice Periodical on Structural Design and Construction. 2005 Aug;10(3):177-80. https://doi.org/10.1061/(ASCE)1084-0680(2005)10:3(177)
- Kim SC, Jung BH. Dispute settlement in construction contracts under FIDIC. Journal of the Korea Institute of Building Construction. 2010 Aug;10(4):21-9. https://doi.org/10.5345/JKIC.2010.10.4.021
- Kim YJ, Kim TK, Jo DS. Lee HK. A study on substantiation methodology for extension of time in international megaproject claims. Korean Journal of Construction Engineering and Management. 2015 May;16(3):165-76. http://dx.doi.org/10.6106/KJCEM.2015.16.3.165
- Ko HS. Risk analysis of contractual provisions for EPC/Turnkey projects: Contractor''s liability position [master thesis], [Pohang (Korea)]: Pohang University of Science and Technology. 2014. 97p.
- The international Federation of Consulting Engineers. Conditions of contract for EPC/Trunkey projects. Geneva: The international Federation of Consulting Engineers (FIDIC); 1999. 122 p.
- The society of construction law. The society of construction law delay and disruption protocol. 2nd ed. Leicestershire: The society of construction law; 2002. 84 p.