Acknowledgement
Supported by : 국토교통부
References
- Moon, I. S. (2002). Automatic Climbing System, Journal of Korean Concrete Institute, 14(5), 27-30
- Kwon, S. M. (2002). ACS (Automatic Climbing System) Form Construction Technology for High-rise Building Construction, Korea Institute of Building Construction, 2(1)
- ACI Committee 347. (2004). Guide to Formwork For Concrete(ACI 347-04), American Concrete Institute
- Oh, J. H. (2006). The Effect of ACS Construction Method on Highrise Building, Korean Journal of Construction Engineering and Management, 6-11, 228-231
- KOSHA Committee. (2010). Systemform (RCS,ACS form) safety operation instructions(C-1-2010), Korea Occupational Safety & Health Agency
- Park, B. J., You, S. K., Kim, J. H., & Kim, J. J. (2012). Comparative Study of Strength and Weakness of System Form in High-rise Building Project, Korea Institute of Building Construction, 12(1), 9-11
- Yang, S. H., Cho, J. Y., Cho, J. W., Lee, J. H., & Kim, Y. S. (2012). A Study on the Development of Automated Gangform Climbing System for Apartment Housing Construction, Korean Journal of Construction Engineering and Management, 13(1), 53-66 https://doi.org/10.6106/KJCEM.2012.13.1.053
- KDS Committee (2016). Design Standard for Formwork and Support(KDS 21 50 00), Ministry of Land Infrastructure and Transport
- KTEA Committee (2016). hypothesis construction standard specification, Korea Temporary Equipment Association
- Doka. (2017). Automatic climbing formwork Xclimb 60 User information, Doka
- Shim, W. K., Chae, B. M., Jung, S. W., & Hong, G. H. (2018). Development of K-ACS Form for High-Rise Building, Cambridge, a journal of conference, 30(2), 225-226