Fig. 1. Overseas construction contract value by Koreanconstruction firms (data from International Contractors Association of Korea (ICAK))
Fig. 2. Overseas construction bidding value by Korean construction firms (data from ICAK)
Fig. 4. BSR ranges by work type
Fig. 5. BSR ranges by Project size
Fig. 7. BSR ranges by bidding type
Fig. 8. BSR ranges by contract type
Fig. 3. BSR ranges by region
Fig. 6. BSR ranges by project duration
Fig. 9. BSR ranges by client type
Fig. 10. BSR ranges by period
Table 1. Key Attributes of Overseas construction projects
Table 2. Normality test on Bidding Success Ratio(BSR) according to the characteristics of overseas projects
Table 3. Descriptive statistics of international bidding results by region
Table 4. Kruskal-Wallis tests of BSR by region
Table 5. Descriptive statistics of international bidding results by work type
Table 6. Kruskal-Wallis tests of BSR by work type
Table 7. Descriptive statistics of international bidding results by project size
Table 8. Kruskal-Wallis tests of BSR by project size
Table 9. Descriptive statistics of international bidding results by project duration
Table 10. Kruskal-Wallis tests of BSR by Project duration
Table 11. Descriptive statistics of international bidding results by bidding type
Table 12. Kruskal-Wallis tests of BSR by bidding type
Table 13. Descriptive statistics of international bidding results by contract type
Table 14. Descriptive statistics of international bidding results by client type
Table 15. Kruskal-Wallis tests of BSR by client type
Table 16. Descriptive statistics of international bidding results by period
참고문헌
- Aje, I.O., Oladinrin, T.O., and Nwaole, A.N.C. (2016). "Factors Influencing Success Rate of Contractors in Competitive Bidding for Construction Works in South-East, Nigeria." Journal of Construction in Developing Countries, 21(1), pp. 19-34. https://doi.org/10.21315/jcdc2016.21.1.2
- Aznar, B., Pellicer, E., Davis, S., and Ballesteros-Perez, P. (2017). "Factors affecting contractor's bidding success for international infrastructure projects in Australia." Journal of Civil Engineering and Management, 23(7), pp. 880-889. https://doi.org/10.3846/13923730.2017.1341955
- Bu-Qammaz, A.S., Dikmen, I., and Birgonul, M.T. (2009). "Risk assessment of international construction projects using the analytic network process." Canadian Journal of Civil Engineering, 36(7), pp. 1170-1181. https://doi.org/10.1139/L09-061
- Chua, D.K.H., and Li, D. (2000). "Key factors in bid reasoning model." Journal of Construction Engineering and Management, 126(5), pp. 349-357. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:5(349)
- Drew, D.S., and Skitmore, M. (1997). "The effect of contract type and size on competitiveness in bidding." Construction Management and Economics, 15(5), pp. 469-89. https://doi.org/10.1080/014461997372836
- Dikmen, I., and Birgonul, M.T. (2004). "Neural network model to support international market entry decisions." Journal of Construction Engineering and Management, 130(1), pp. 59-66. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:1(59)
- Dikmen, I., and Birgonul, M.T. (2006). "An analytic hierarchy process based model for risk and opportunity assessment of international construction projects." Canadian Journal of Civil Engineering, 33(1), pp. 58-68. https://doi.org/10.1139/l05-087
- Dikmen, I., Birgonul, M.T., and Gur, A.K. (2007a). "A case-based decision support tool for bid mark-up estimation of international construction projects." Automation in Construction, 17(1), pp. 30-44. https://doi.org/10.1016/j.autcon.2007.02.009
- Dikmen, I., Birgonul, M.T., and Han, S.H. (2007b). "Using fuzzy risk assessment to rate cost overrun risk in international construction projects." International Journal of Project Management, 25(5), pp. 494-505. https://doi.org/10.1016/j.ijproman.2006.12.002
- Gunhan, S., and Arditi, D. (2005). "Factors Affecting International Construction." J. Constr. Eng. Manage., 131(3), pp. 273-282. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:3(273)
- Flanagan, R. Lu, W., Shen. L., and Jewell, C. (2007). "Competitiveness in Construction: a critical review of research." Construction Management and Economics, 25(9), pp. 989-1000. https://doi.org/10.1080/01446190701258039
- Han, S.H., and Diekmann, J.E. (2001). "Making a risk-based bid decision for overseas construction projects." Construction Management and Economics, 19(8), pp. 765-776. https://doi.org/10.1080/01446190110072860
- Han, S.H., Diekmann, J.E., and Ock, J.H. (2005). "Contractor's risk attitudes in the selection of international construction projects." Journal of Construction Engineering and Management, 131(3), pp. 283-292. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:3(283)
- Hwang, J.S., and Kim, Y.S. (2016). "A bid decision-making model in the initial bidding phase for overseas construction projects." KSCE Journal of Civil Engineering, 20(4), pp. 1189-1200. https://doi.org/10.1007/s12205-015-0760-y
- Jang, W., Lee, J.K., Lee, J., and Han, S.H. (2015). "Naive Bayesian Classifier for Selecting Good/Bad Projects during the Early Stage of International Construction Bidding Decisions." Mathematical Problems in Engineering, vol. 2015, Article ID 830781, 12 pages, 2015.
- Jaselskis, E.J., and Talukhaba, A. (1998). "Bidding considerations in developing countries." Journal of Construction Engineering and Management, 124(3), pp. 185-193. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:3(185)
- Kim, D.Y., Han, S.H., and Kim, H. (2008). "Discriminant analysis for predicting ranges of cost variance in international construction projects." Journal of Construction Engineering and Management, 134(6), pp. 398-410. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:6(398)
- Kim, J., and Kim Y. (2014). "An Analysis of Profitability Study of Overseas Construction Projects using Multiple-Regression." Korean Journal of Construction Engineering and Management, KICEM, 15(2) pp. 95-103.
- Ling, F.Y.Y. (2005). "Global factors affecting margin-size of construction projects." Journal of Construction Research, 6(1), pp. 91-106. https://doi.org/10.1142/S1609945105000274
- Lu, W.S. (2006). "A system for assessing and communicating contractors' competitiveness, thesis submitted to the Degree of Doctor of Philosophy in the Department of Building and Real Estate, the Hong Kong Polytechnic University, Hong Kong.
- Ofori, G. (2003). "Frameworks for analysing international construction." Construction Management and Economics, 21, pp. 379-391. https://doi.org/10.1080/0144619032000049746
- OO, B.L., Drew, D.S., and Runeson, G. (2010). "Competitor analysis in construction bidding." Construction Management and Economics, 28, pp. 1321-1329. https://doi.org/10.1080/01446193.2010.520721
- Polat, G., and Bingol, B.N. (2013). "A comparison of fuzzy logic and multiple regression analysis models in determining contingency in international construction projects." Construction Innovation, 13(4), pp. 445-462. https://doi.org/10.1108/CI-06-2012-0034
- Sohn, T.H. (2011). "A Study on Associations among Number of Bidders, Contract Award Rate and Profitability on International Construction." Journal of The Korean Society of Civil Engineers, 31(3), pp. 247-253.
- Sonmez, R., Ergin, A., and Birgonul, M.T. (2007). "Quantiative methodology for determination of cost contingency in international projects." Journal of Management in Engineering, 23(1), pp. 35-39. https://doi.org/10.1061/(ASCE)0742-597X(2007)23:1(35)
- Yu, Y., Shin, B., Koo, B., and Han, S. (2018). "Using Logistic Regression for Determining the Facctors Affecting Bidding Success in World Bank's International Consulting Projects in Indonesia." Korean Journal of Construction Engineering and Management, KICEM, 19(1) pp. 80-89.