참고문헌
- Amsterdam Optimization Modeling Group LLC. 2009. "Modeling with Excel+OML, a Practical Guide." http://www.amsterdamoptimization.com/models/msf/oml.pdf, accessed 11/8/2019.
- Brah, Shaukat A. 1996. "A Comparative Analysis of Due Date Based Job Sequencing Rules in a Flow Shop with Multiple Processors." Production Planning & Control 7(4):362-73. https://doi.org/10.1080/09537289608930364
- Campbell, Stephen L., and Ramine Nikoukhah. 2018. "Introduction to OML." In Modeling and Simulation with Compose and Activate, eds. Stephen L. Campbell and Ramine Nikoukhah. Cham: Springer International Publishing, 9-60.
- Choi, Hyun-Seon, and Dong-Ho Lee. 2007. "A Branch and Bound Algorithm for Two-Stage Hybrid Flow Shop Scheduling: Minimizing the Number of Tardy Jobs." Journal of the Korean Institute of Industrial Engineers 33(2):213-20.
- de Fatima Morais, Marcia et al. 2014. "Multicriteria Hybrid Flow Shop Scheduling Problem: Literature Review, Analysis, And Future Research." Independent Journal of Management & Production 5(4):1004-31.
- Fattahi, Parviz, Seyed Mohammad Hassan Hosseini, Fariborz Jolai, and Reza Tavakkoli-Moghaddam. 2014. "A Branch and Bound Algorithm for Hybrid Flow Shop Scheduling Problem with Setup Time and Assembly Operations." Applied Mathematical Modelling 38(1):119-34. https://doi.org/10.1016/j.apm.2013.06.005
- Gupta, Jatinder N. D. 1988. "Two-Stage, Hybrid Flowshop Scheduling Problem." The Journal of the Operational Research Society 39(4):359-64. https://doi.org/10.1057/jors.1988.63
- Holthaus, Oliver, and Chandrasekharan Rajendran. 1997. "Efficient Dispatching Rules for Scheduling in a Job Shop." International Journal of Production Economics 48(1):87-105. https://doi.org/10.1016/S0925-5273(96)00068-0
- Huang, Wanzhen, and Shanling Li. 1998. "A Two-Stage Hybrid Flowshop with Uniform Machines and Setup Times." Mathematical and Computer Modelling 27(2):27-45. https://doi.org/10.1016/S0895-7177(97)00258-6
- Jeong, K-C, and Y-D Kim. 1998. "A Real-Time Scheduling Mechanism for a Flexible Manufacturing System: Using Simulation and Dispatching Rules." International Journal of Production Research 36(9):2609-26. https://doi.org/10.1080/002075498192733
- Jun, Choi Yu. 2015. "A Genetic Algorithm for Minimizing Total Tardiness with Non-identical Parallel Machines." Journal of the Society of Korea Industrial and Systems Engineering 38(1):65-73. https://doi.org/10.11627/jkise.2014.38.1.65
- Kang, Jun-Gyu. 2018. "A Simulation Based Scheduler Development for Hybrid Flow Shop." Proceedings of the Annual Conference of the Korea Society for Simulation: 514-19.
- Kim, Bong-jin, and Dong-Bock Cho. 2005. "A Genetic Algorithm to Minimize Total Weighted Tardiness on Two Types of Nonidentical Parallel Machines." Journal of the Korean Society of Maintenance Engineers 10(1):23-31.
- Kim, Yeong-Dae, Sang-Oh Shim, Bum Choi, and Hark Hwang. 2003. "Simplification Methods for Accelerating Simulation-Based Real-Time Scheduling in a Semiconductor Wafer Fabrication Facility." IEEE Transactions on Semiconductor Manufacturing 16(2):290-98. https://doi.org/10.1109/TSM.2003.811890
- Lee, Geun-Cheol, and Yeong-Dae, Kim. 2004. "A Branch-and-Bound Algorithm for a Two-Stage Hybrid Flowshop Scheduling Problem Minimizing Total Tardiness." International Journal of Production Research 42(22):4731-43. https://doi.org/10.1080/0020754041233127044
- Mittelmann, Hans D. 2017. "Latest Benchmarks of Optimization Software." INFORMS Annual Meeting, Houston, TX.
- Ruiz, Ruben, and Jose Antonio Vazquez-Rodríguez. 2010. "The Hybrid Flow Shop Scheduling Problem." European Journal of Operational Research 205(1):1-18. https://doi.org/10.1016/j.ejor.2009.09.024
- Sudipta, Saha. 2017. "Simulation-Based Decision Support Framework for Hybrid Flow Shop (HFS) Scheduling Problem." MSc Dissertation, Graduate School of Engineering, Seoul National University. available at http://hdl.handle.net/10371/137370.
- Yoon, Sungwook, Daehoon Ko, Jihyun Kim, and Sukjae Jeong. 2013. "A Study on Combinatorial Dispatching Decision of Hybrid Flow Shop: Application to Printed Circuit Board Process." Journal of Korean Institute of Industrial Engineers 39(1): 10-19. https://doi.org/10.7232/JKIIE.2013.39.1.010