A Study on Prediction and Adjustment of Disputes Amount of Power Generated by the PV System by the Peripheral Structure Shadow

주변 구조물의 일조방해로 발생한 음영에 의한 태양광 발전 시스템 발전량 예측 및 분쟁 조정(안)에 대한 연구

  • Oh, Min-Seok (Department of Architectural Engineering, Dankook University) ;
  • Kim, Gi-Cheol (Department of Architectural Engineering, Dankook University)
  • Received : 2018.05.15
  • Accepted : 2019.03.07
  • Published : 2019.04.30

Abstract

The first case of the Central Environmental Dispute Mediation Committee, which recently decided to repay the builder for damaging the solar power plant due to the obstruction of the sunshine of new buildings, came out. Even if the Respondent complies with the provisions of the Building Act, the decision of the Complainant can be considered to have been made in light of the fact that the applicant's power plant has suffered from sunlight damage. However, since the extent of the damage may differ depending on the weather, the decision is reserved, and there is room for additional disputes on a regular basis because the loss of power generation to be continuously generated is not reflected in the future. Therefore, in this study, we try to find the direction of dispute adjustment by summarizing the issues related to the generation of power generation due to the influence of shading through the analysis of the case of dispute related to sunlight related to the PV system.

Keywords

TOONB4_2019_v39n2_11_f0001.png 이미지

Fig. 1 Position relationship

TOONB4_2019_v39n2_11_f0002.png 이미지

Fig. 2 Site plan and section

TOONB4_2019_v39n2_11_f0003.png 이미지

Fig. 3 Yearly SMP price (KEPCO) & SMP trend by year (2015 year)

TOONB4_2019_v39n2_11_f0004.png 이미지

Fig. 4 Configuration before and after new construction

TOONB4_2019_v39n2_11_f0005.png 이미지

Fig. 5 Simulation process & Inv power graph (Before)

TOONB4_2019_v39n2_11_f0006.png 이미지

Fig. 6 Simulation process & Inv power graph (After, East side)

Table 1 Overview of targeted PV system

TOONB4_2019_v39n2_11_t0001.png 이미지

Table 2 Power generation and sales status

TOONB4_2019_v39n2_11_t0002.png 이미지

Table 3 Certifications and warranty (LG)

TOONB4_2019_v39n2_11_t0003.png 이미지

Table 4 Simulation result (Before)

TOONB4_2019_v39n2_11_t0004.png 이미지

Table 5 Simulation result (After, East side)

TOONB4_2019_v39n2_11_t0005.png 이미지

Table 6 Comparison of simulation results

TOONB4_2019_v39n2_11_t0006.png 이미지

Table 7 Summary of differences

TOONB4_2019_v39n2_11_t0007.png 이미지

Table 8 Power generation loss standard

TOONB4_2019_v39n2_11_t0008.png 이미지

Table 9 Amount of unit price based on damage amount

TOONB4_2019_v39n2_11_t0009.png 이미지

References

  1. Kang, J. H., Q4 2017 PV industry trends, The Export-Import Bank of Korea, 2018.
  2. Ministry of Trade, Industry and Energy of Korea, Guidelines for Management of New and Renewable Energy Mandatory System and Fuel Mixed Mandatory System, 2018.
  3. Ministry of Trade, Industry and Energy of Korea, Rules for Issuing Supply Certificates and Operating the Trading Market, 2019.
  4. LG Electronics, In official hompage, High Efficiency Mono X Module LG260S1C-G2, from https://www.lg.com/us/business/solar-panel/all-products/lg-LG260S1C-G2