Fig. 1. Study flow diagram
Fig. 2. Conceptual diagram for EPSS based on construction inspection information in Temporary Work
Fig. 3. Comparison of unit processes for quality inspection in Temporary Work (AS-IS, TO-BE)
Fig. 4. Process for quality inspection in temporary work based on construction inspection information. (Level 1)
Fig. 5. Process model for quality inspection based on construction inspection information in Temporary Work (A1: Before Inspection)
Fig. 6. Process model for quality inspection based on construction inspection information in Temporary Work (A2: Implementation Inspection)
Fig. 7. Process model for quality inspection based on construction inspection information in Temporary Work (A3: After Inspection)
Fig. 8. Algorithm for EPSS based on construction inspection information in Temporary Work
Fig. 9. Illustration of activation of EPSS based on construction inspection information in Temporary Work
Fig. 10. Generation screen for construction inspection information per Inspection subject in Temporary Work (Various Standard information)
Fig. 11. Generation screen for construction inspection information per Inspection subject in Temporary Work (Inspection items information)
Fig. 12. Illustration of inspection records for EPSS based on construction inspection information in Temporary Work
Fig. 13. Interlocking with portable instruments for EPSS based on construction inspection information in Temporary Work
Fig. 14. Illustration of quality inspection results data for EPSS based on construction inspection information in Temporary Work
Table 1. Related major research
Table 2. Classification system for Temporary Work of standard specification code for construction standards (KCS)
Table 3. List of construction inspection information related to inspection tasks for Form construction (Illustration)
Table 4. Problems in implementation of quality inspection for Temporary Work by Quality Management Construction Engineers
Table 5. Classification of construction inspection information for quality inspection
Table 6. Category code for database in Temporary Work (Level 1)
Table 7. Illustration of database code for Temporary Work
Table 8. Illustration of Data Breakdown Structure on construction inspection information (Gang form)
Table 9. Establishment of unit process for quality inspection in Temporary Work
Table 10. Required functions for EPSS based on construction inspection information in Temporary Work
Table 11. Overview of the Sample Project for system verification
Table 12. Status of Construction Engineer at Interview (Quality)
Table 13. Measurement results on required time for quality inspection per Sample Project
References
- Ko, K.J., Oh, S.H., and Lee, C.S. (2016). "Application Prototype Development for the Building Safety Periodic Inspection." Journal of the Architectural Institute of Korea Structure & Construction, 16(1), pp. 63-71.
- Kim, M.J. (2012). "Development of Breakdown Structure of Temporary Work in Housing Project." Chungbuk Univ., Chungbuk.
- Kim, B.S., Park, J.M., Kim, O.K., Kwak, S.S., Choi, B.J., and Song, G.H. (2011). "Improvement of Safety Certification System related on Construction Temporary Equipment." Journal of the Regional Association of Architectural Institute of Korea, pp. 319-322.
- Park, J.W. (2008). "Classification of Temporary Equipments for Building Construction in Safety Certification." Chungbuk Univ., Chungbuk.
- Park, J.M. (2012). "Improvement Plan of Work Process Model for Analyzing Productivity in Construction Temporary Work." Chungbuk Univ., Chungbuk.
- Park, J.M., and Kim, O.K. (2014). "Development on Breakdown Structure of Construction Site centered Construction Temporary Technology Index." Korean Journal of Construction Engineering and Management, KICEM, 14(4), pp. 77-85. https://doi.org/10.6106/KJCEM.2014.15.4.077
- Oh, S.W., and Kim, Y.S. (2005). "Development of PDA and Web-based System for Quality Inspection and Defect Management of Apartment Housing Project."Korean Journal of Construction Engineering and Management, KICEM, 5(1), pp. 140-150.
- Lee, H.R., Cho, D.H., Park, S.H., and Koo, K.J. (2017). "Nexus based Quality Inspection Support Model for Defect Prevention of Architectural Finishing Works." Korean Journal of Construction Engineering and Management, KICEM, 17(5), pp. 59-67.
- Jung, S.K. (2015). "Improvement of Site Quality Control through Results Analysis of Construction Workʼs Quality Inspection." University of Seoul, Seoul.
- Han, J.K., and Lee, S.K. (2015). "Improvement Direction of Construction Field Inspections : A Survey-Based." The Korea Institute of Building Construction, 15(1), pp. 188-189.