Acknowledgement
Supported by : 국토교통부
References
- Ahn, H. K., Ham, N. H., Kim, J. H., & Kim, J. J. (2013). A Study on Improvement of Implementation Documents using DSM(Design Structure Matrix), Journal of the Architectural Institute of Korea, JAIK, 29(3), 173-181.
- Alvanchi, A., Azimi, R., Lee, S., AbouRizk, S. M., & Zubick, P. (2011). Off-site construction planning using discrete event simulation, Journal of Architectural Engineering, 18(2), 114-122. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000055
- Austin, S., Baldwin, A., Li, B., & Waskett, P. (2000). Analytical design planning technique (ADePT): a dependency structure matrix tool to schedule the building design process, Construction Management & Economics, 18(2), 173-182. https://doi.org/10.1080/014461900370807
- Blismas, N. G., Pendlebury, M., Gibb, A., & Pasquire, C. (2005). Constraints to the use of off-site production on construction projects, Architectural Engineering & Design Management, 1(3), 153-162. https://doi.org/10.1080/17452007.2005.9684590
- Giaglis, G. M. (2001). A taxonomy of business process modeling & information systems modeling techniques, International Journal of Flexible Manufacturing Systems, 13(2), 209-228. https://doi.org/10.1023/A:1011139719773
- Han, S. H., Hasan, S., Bouferguene, A., Al-Hussein, M., & Kosa, J. (2014). Utilization of 3D visualization of mobile crane operations for modular construction on-site assembly, Journal of management in engineering, 31(5), 04014080. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000317
- Hwang, B.G., Thomas, S. R., Haas, C. T., & Caldas, C. H. (2009). Measuring the impact of rework on construction cost performance, Journal of construction engineering & management, 135(3), 187-198. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:3(187)
- Josephson, P. E., & Hammarlund, Y. (1999). The causes & costs of defects in construction: A study of seven building projects, Automation in Construction, 8(6), 681-687. https://doi.org/10.1016/S0926-5805(98)00114-9
- Lawson, R. M., & Richards, J. (2010). Modular design for high-rise buildings, Proceedings of the Institution of Civil Engineers-Structures & Buildings, 163(3), 151-164. https://doi.org/10.1680/stbu.2010.163.3.151
- Lawson, M., Ogden, R., & Goodier, C. (2014). Design in modular construction, CRC Press, New York, USA, 211-214.
- Lee, J., Park, M., Lee, H.S., Kim, T., Kim, S., & Hyun, H. (2017). Workflow dependency approach for modular building construction manufacturing process using Dependency Structure Matrix (DSM), KSCE Journal of Civil Engineering, 21(5), 1525-1535. https://doi.org/10.1007/s12205-016-1085-1
- Lei, Z., Taghaddos, H., Olearczyk, J., Al-Hussein, M., & Hermann, U. (2013). Automated method for checking crane paths for heavy lifts in industrial projects, Journal of construction engineering & management, 139(10), 04013011. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000740
- Love, P. E., & Li, H. (2000). Quantifying the causes & costs of rework in construction, Construction Management & Economics, 18(4), 479-490. https://doi.org/10.1080/01446190050024897
- Love, P. E., & Edwards, D. J. (2004). Determinants of rework in building construction projects, Engineering, Construction & Architectural Management, 11(4), 259-274. https://doi.org/10.1108/09699980410547612
- Lu, N. (2009). The current use of offsite construction techniques in the United States construction industry, Proc., Construction Research Congress 2009, Seattle, Washington, 946-955.
- Mayer, R. J., Benjamin, P. C., Caraway, B. E., & Painter, M. K. (1995). A framework & a suite of methods for business process reengineering, Business process reengineering: a managerial perspective, 3, 245-290.
- Mullens, M. A. (2011). Factory Design for Modular Homebuilding: Equipping the Modular Factory for Success, 1st ed, Constructability Press, New York(USA), 1-26.
- Nahangi, M., Safa, M., Shahi, A., & Haas, C. T. (2014). Automated registration of 3D point clouds with 3D CAD models for remote assessment of staged fabrication, Proc., Construction Research Congress 2014: Construction in a Global Network, 1004-1013.
- Olearczyk, J., Al-Hussein, M., & Bouferguene, A. (2014). Evolution of the crane selection & on-site utilization process for modular construction multilifts, Automation in Construction, 43, 59-72. https://doi.org/10.1016/j.autcon.2014.03.015
- Oloufa, A. A., Hosni, Y. A., Fayez, M., & Axelsson, P. (2004). Using DSM for modeling information flow in construction design projects, Civil Engineering & Environmental Systems, 21(2), 105-125. https://doi.org/10.1080/10286600310001638474
- Park, H. K., & Ock, J.H. (2016). Unit modular in-fill construction method for high-rise buildings, KSCE Journal of Civil Engineering, 20(4), 1201-1210. https://doi.org/10.1007/s12205-015-0198-2
- Park, M. S., Cho, J. Y., Lee, H. S., Kwon, Sung-Keun, & Kim, W. Y. (2010). BIM Design Management Process Using the Dependency Structure Matrix at the Introduction Phase, Journal of the Architectural Institute of Korea, 11(5), 65-74.
- Smith, R. E. (2011). Prefab architecture: A guide to modular design & construction, John Wiley & Sons, Hoboken, New Jersey, USA, 53-73
- Yassine, A., & Braha, D. (2003). Complex concurrent engineering & the design structure matrix method, Concurrent Engineering, 11(3), 165-176. https://doi.org/10.1177/106329303034503
- Architect Service Scope and Standard Cost, Announcement of Ministry of Land, Infrastructure and Transport 2002-152, 2002