Acknowledgement
이 논문은 2016년도 대한건축학회 추계학술발표대회 내용을 수정.보완하여 작성된 내용임.
References
- Ha, M.S., Ha, G.J., & Yi, D.R. (2017). Comparative Analysis on the Labor Cost of Apartment House Frame work using Work Crew Based Model, Journal of the Regional Association of Architectural Institute of Korea, 19(3), 141-147
- Ha, G.J., & Ha, M.S. (2016). A Study on the Reasonable Professional Human Resource Management of through Employment Environment Analysis of Construction Craft Workers, Journal of the Regional Association of Architectural Institute of Korea
- Ha, M.S. (2012). A Study on the Proper Construction Cost Estimation of Apartment House using Work Crew Based Model, Kyungil University
- Ha G.J., Choi M.K., & Ha, M.S. (2012). Analysis on the Present Work Manpower in Process of Apartment House Frame Work, Journal of the Regional Association of Architectural Institute of Korea
- Chun, J.Y. (2002). A Study on Construction Cost Estimating Method based on Actual Cost Data, AIK Journal, 18(4)
- Construction Technology & Policy Institute. (2008). A study on the development of Crew based next generation cost data
- Kim, B.J., Jung, M.H., Hyun, C.T., Koo, K.J., & Moon, H.S. (2006). A Proposal fo Development of the Certification and Level System of Construction Craft Workers, construction engineering and management, 7(5), 105-114
- Agapiou, A., Clausen, LE., Flanagan, R., Norman, D., & Notman, G. (1998). The role of logistics in the materials flow control process, Construction Management and Economics 16-131-7 https://doi.org/10.1080/014461998372420
- Sonmez, R, & Rowings, J.E. (1998). Construction Labor Productivity Modeling with neural Network, Journal of Construction Engineering and Management, ASCE, 124(6), 498-504 https://doi.org/10.1061/(ASCE)0733-9364(1998)124:6(498)
- W.H. Tsai. (1996). A technical note on using work sampling to estimate the effort on activities under activity-based costing, International journal of production economics, 43
- Allan Ashworth (1994). Cost Studies of Buildings(Second edition), Longman Group
- Bode, J. (1998). Neural Networks for Cost Estimation, Cost Engineering, AACE, Vol. 40, No. 1, p.p. 25-30
- Hanna, AS, & Sanvido, VE. (1991). Interactive Horizontal Formwork Selection System, Concrete International
- WORKNET/Korea Network for Occupations and Workers(KNOW) Reference Materials