참고문헌
- Ahn, J., and Lee, D. (2014). "Construction Cost Estimate Modeling of Roundabout at Preliminary Design Stage in Jeju." Journal of KSCE, 34(4), pp. 1299-1306. https://doi.org/10.12652/Ksce.2014.34.4.1299
- Baek, H., Nam, W., Kim, S., Kim, H., Choi, J., and Kim, K. (2013). "Scheduling Technique for Remodeling Project of Inhabited Condition." Korean Journal of Construction Engineering and Management, KICEM, 14(2), pp. 141-150. https://doi.org/10.6106/KJCEM.2013.14.2.141
- Bakhshi, P., and Touran, A. (2014). "An overview of budget contingency calculation methods in construction industry." Procedia Engineering, 85, pp. 52-60. https://doi.org/10.1016/j.proeng.2014.10.528
- BCIS (2012). Elemental Standard Form of Cost Analysis - Principles, Instructions, Elements and Definitions, 4th (NRM) ed., RICS Building Cost Information Service, London.
- Cha, H., and Lee, D. (2018). "Determining Value at Risk for Estimating Renovation Building Projects by Application of Probability-based Fuzzy Set Theory." Journal of Asian Architecture and Building Engineering, 17(1), pp. 63-70. https://doi.org/10.3130/jaabe.17.63
- Cheng, M. Y., Tsai, H. C., and Hsieh, W. S. (2009). "Web-based conceptual cost estimates for construction projects using Evolutionary Fuzzy Neural Inference Model." Automation in Construction, 18(2), pp. 164-172. https://doi.org/10.1016/j.autcon.2008.07.001
- Choi, J., Kim, H., and Kim, I. (2015). "Open BIM-based quantity take-off system for schematic estimation of building frame in early design stage." Journal of Computational Design and Engineering, 2(1), pp. 16-25. https://doi.org/10.1016/j.jcde.2014.11.002
- Choi, S., Son, J., Lee, D., and Choi, M. (2010). "Management A Study on the Application of the Cost Data Guide in Remodeling Works." Journal of AIKRA, 12(4), pp. 343-353.
- Getuli, V., Giusti, T., and Capone, P. (2015). "A Decision Support System (DSS) for constructability assessment in seismic retrofit of complex buildings." ISARC, 32(1).
- Han, J., Cha, H., and Lee, D. (2009). "A Measure for Standardization of Old Aged Apartment Remodeling through Application of BIM." Korean Journal of Construction Engineering and Management, KICEM, 10(3), pp. 53-64.
- Han, J., and Kim, K. (2010). "Developing element technology for competitive remodeling construction." Journal of seismic retrofitting & remodeling research center, 8(2), pp. 33-38.
- Hong, J., Yeom, D., Choi, S., and Kim, Y. (2017). "A Study of the Decision Support Model to Select an Appropriate Alternative Plan in Apartment Remodeling." Journal of AIK, 33(3), pp. 41-50.
- Hong, S., and Ahn, Y. (2004). "A Study on Countermeasures for the Strategic Risk Management of Remodeling in Construction Projects." Journal of AIK, 20(11), pp 153-161.
- Hwang, K. (2003). "Construction Management in Remodeling." Korean Journal of Construction Engineering and Management, KICEM, pp. 191-197.
- Hwang, Y., Kim, K., Kim, K, and Han, J. (2008). "Development a Process Model of Environment-friendly Demolition Works for Aged Housing Remodeling." Korean Journal of Construction Engineering and Management, KICEM, 9(6). pp. 204-216.
- Idrus, A., Nuruddin, M. F., and Rohman, M. A. (2011). "Development of project cost contingency estimation model using risk analysis and fuzzy expert system." Expert Systems with Applications, 38(3), pp. 1501-1508. https://doi.org/10.1016/j.eswa.2010.07.061
- Jeon, Y. (2004). "study on the analysis and the prediction of the cost for the school construction." Masters dissertation, Mokwon univ.
- Joe, E. (2006). "A Study on the Build Cost Estimation Method for Feasibility Analysis in the Initial Phase." Masters dissertation, Konkook univ.
- Joe, Y., Seo, B., and Yoon, S. (2015). "Development of BIM Based Estimation Prototype System Using Building Elements Combination Database." Journal of AIK, 31(3), pp. 45-52.
- Kang, K., Jung, B., Bang, J., and Min, A. (2004). "Apartment house remodeling construction case report." Daelim, pp. 112-129.
- Kang, S., Hwang, Y., and Kim, K. (2008). "A Scheduling Method Of Dismantling Work Considering Specific Condition Of Remodeling Project." Korean Journal of Construction Engineering and Management, KICEM, 9(5), pp. 104-116.
- Karakhan, A. A., and Gambatese, J. A. (2017). "Identification, quantification and classification of potential safety risk for sustainable construction in the United States." Journal of Construction Engineering and Management, 143(7), 04017018. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001302
- Park, K. S., and Kim, K. P. (2014). "Essential BIM input data study for housing refurbishment: homeowners' preferences in the UK." Buildings, 4(3), pp. 467-487. https://doi.org/10.3390/buildings4030467
- Kim, K. P., and Park, K. S. (2013). "BIM Feasibility Study For Housing Refurbishment Projects In The UK." Organization, technology & management in construction : an international journal, 5, pp. 765-774.
- Kim, H., Choi. J., Kim, H., and Kim, I. (2013). "The Development of Data Model for Open BIM-Based Schematic Estimates - Focused on Construction Type for Actual Cost of Public Projects." Journal of AIK, 29(3), pp. 61-70.
- Kim, H., Choi, J., and Kim, I. (2013). "A Methodology of Open BIM-Based Quantity Take-Off for Schematic Estimation of Frame Work in Super-Tall Buildings." Journal of AIK, 29(5), pp. 31-38.
- Kim, H., Kang, I., Lee, D., and Kim, C. (2014). "Development of a Computer System and Suggestion of Man-Hours for Demolition Cost Estimation." Journal of KSCE, 34(3), pp. 1007-1015. https://doi.org/10.12652/Ksce.2014.34.3.1007
- Kim, K., and Baek, H. (2015). "Comparative Analysis between RSMeans and Standard Estimating System for Selective Finish Demolition in Remodeling Projects." Journal of AIK, 31(3), pp. 73-80.
- Kim, S., and Koo, I. (2000). "A Neural Network Cost Model for Office Buildings." Journal of AIK, 16(9), pp. 59-66.
- Kim, Y., Kim, K., Cha, H., Kim, K., and Shin, D. (2010). "Economic Evaluation of Eco-friendly Demolition Work and Case study in Remodeling Project." Korean Journal of Construction Engineering and Management, KICEM, 11(2), pp. 45-54. https://doi.org/10.6106/KJCEM.2010.11.2.45
- L.Joblot, Paviot, T., Deneux, D., and Lamouri, S. (2017). "Literature review of Building Information Modeling (BIM) intended for the purpose of renovation projects." IFAC-PapersOnLine, 50(1), pp. 10518-10525. https://doi.org/10.1016/j.ifacol.2017.08.1298
- Lee, D., and Cha, H. (2010). "Development of BIM Standard Database System for an Approximate Estimate of Old-Aged Apartment Remodeling Project." Korean Journal of Construction Engineering and Management, KICEM, 11(5), pp. 53-65. https://doi.org/10.6106/KJCEM.2010.11.5.53
- Lee, D., and Cha, H. (2016). "A Probabilistic Risk-based Cost Estimation Model for Initial-Satge Decision Making on Apartment Remolding Projects." Korean Journal of Construction Engineering and Management, KICEM, 17(2), pp. 70-80. https://doi.org/10.6106/KJCEM.2016.17.2.070
- Lee, D., Cha, H., Kim, W., and Shin, D. (2008). "Strategy for Facilitating Old Aged Apartment Remodeling through Technology Analysis for Space Expansion." Korean Journal of Construction Engineering and Management, KICEM, 9(6), pp. 147-155.
- Lee, H., Lee, H., Park, M., Kim, S., and Ahn, Y. (2012). "Conceptual Cost Estimating System Development for Public Apartment Projects." Korean Journal of Construction Engineering and Management, KICEM, 13(4), pp. 152-164. https://doi.org/10.6106/KJCEM.2012.13.4.152
- Lee, K. (2016). "Remodeling and cost." Korea Remodeling Association, pp. 49-51.
- Lim, J. (2008). "Database of preliminary estimate cost data for developing a historical data based preliminary estimate system." Masters dissertation, Sungkyunkwan univ., Korea.
- Lim, J. (2016). "BIM-based Preliminary Estimate for Decision-Making in Conceptual Design Phase." Masters dissertation, Sejong univ., Korea.
- Myung, J., Jung, J., and Lee, C. (2010). "Cost Analysis for a Parking Lot Expansion in the aged Apartment Complex." Proceedings of KICEM Annual Conference, KICEM, 10, pp. 233-235.
- Osama E. K. Daoud (1997). "The Architect/Engineer's Role in Rehabilitation Work." Journal of Construction Engineering and Management, 123(1).
- Park, C., Jang, S., and Kim, K. (2003). "A Probabilistic Cost Planning Model during the Design Decision-Making Process-Focused on High-Rise Office Building-" Journal of AIK, 19(11), pp. 181-189.
- Park. S., Goo. G., Park. S(2008), "Object-Parameter Integrated Schematic Estimation Model for Predicting Office Building Interior-finishing Costs", Journal of the korea institute of building construction, 8(2), pp 159-166
- Park, Y., Won, S., Han, C., and Lee, J. (2011). "A Study on 3D BIM Collaborative Approximate Estimating Model of Structural Work for Apartment Projects." Journal of AIK, 27(6), pp. 123-130.
- Petroutsatou, K., Georgopoulos, E., Lambropoulos, S., and Pantouvakis, J. P. (2011). "Early cost estimating of road tunnel construction using neural networks." Journal of Construction Engineering and Management, 138(6), pp. 679-687. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000479
- Razali Abdul Hamid, and Fabi Jonathan Kehinde (2017). "Choosing an appropriate contingency sum estimating methods for highway construction projects in nigeria: a literature review." Journal of the Malaysian Institute of Planners, 15(1), pp. 13-20.
- Son, B., Park, M., Lee, H., and Lim, D. (2008). "Analyzing the Schematic Cost Estimating Model Based on Quantity Variation in Building Projects Using the Case Study - Applying to Structure Cost of Residential Complex Building Project." Journal of AIK, 24(6), pp. 109-118.
- Stoy, C., Pollalis, S., and Schalcher, H. R. (2008). "Drivers for cost estimating in early design: Case study of residential construction." Journal of Construction Engineering and Management, 134(1), pp. 32-39. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:1(32)
- Sun, Y., Fang, D., Wang, S., Mengdong, D., and Lv, X. (2008). "Safety risk identification and assessment for beijing olympic venues construction." Journal of Management in Engineering, 24, pp. 40-47.
- Tavakolan, M., and Etemadinia, H. (2017). "Fuzzy Weighted Interpretive Structural Modeling: Improved Method for Identification of Risk Interactions in Construction Projects." Journal of Construction Engineering and Management, 143(11), 04017084. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001395
- Wang, X., Xia, N., Zhang, Z., Wu, C., and Liu, B. (2017). "Human Safety Risks and Their Interactions in China's Subways: Stakeholder Perspectives." Journal of Management in Engineering, 33(5), 05017004.
- Wayne, E. Whiteman, and Henry G. Irvvig (1988). "Disturbance Scheduling Technique for Managing Renovation Work." Journal of Construction Engineering and Management, 114(2), pp. 191-213. https://doi.org/10.1061/(ASCE)0733-9364(1988)114:2(191)
- Woo, J., Cha, H., Kim, K., and Shin, D. (2013). "A Study on Duration Calculation Method for Eco-Friendly Remodeling Demolition Work Using Productivity Analysis." Korean Journal of Construction Engineering and Management, KICEM, 14(1) pp. 124-133. https://doi.org/10.6106/KJCEM.2013.14.1.124
- Xing Su, Abdul rahman Andoh, Hubo Cai, Jing Pan, Amr Kandil, and Hisham M. Said (2012). "GIS-based dynamic construction site material layout evaluation for building renovation projects." Automation in Construction, 27, pp. 40-49. https://doi.org/10.1016/j.autcon.2012.04.007
- Yeom, D. (2014). "Development of An Approximate Estimate System for Exterior Finishing Works of Super High-rise Buildings." Masters dissertation, Inha univ., Korea.
- Yoon. J., You. I.(2017). "A Study on Estimating Normal Project Duration", Journal of KICEM, 18(2), pp 12-21
- Yoon, Y. (2013). "The methodology of the apartment remodeling for supporting the customized renovation." land & housing institute.
- You, S., Lee, J., Park, J., and Jeon, J. (2008). "A Study on Developing Systems for Managing Information on Owner's Requirements in the Design Phase." Korean Journal of Construction Engineering and Management, KICEM, 9(3), pp. 126-135.
- You, Y., Lee, K., Kim, J., and Chou, I. (2004). "A Study on the Change Factors by Activities for Estimating Historical Cost on Apartment Housing Projects." Journal of AIKRA, 4(4), pp. 117-127.
- Zolfagharian, S., and Irizarry, J. (2017). "Constructability Assessment Model for Commercial Building Designs in the United States." Journal of Construction Engineering and Management, 143(8)