References
- A.J. Conejo, L. Baringo Morales, S.J. Kazempour, and A. S. Siddiqui, Investment in Electricity Generation and Transmission, no. May. Cham: Springer Inter-national Publishing, 2016.
- S. K. Kim, J. H. Park, H. C. Lee, G. P. Park, S. S. Lee, W. Kim, and Y. T. Yoon, "Comparison between centralized planning model and market oriented planning model for the generation expansion plan," IEEE PES Gen. Meet. PES 2010, pp. 1-6, 2010.
- F. P. (Fereidoon P. Sioshansi, Competitive electricity markets: design, implementation, performance. Elsevier, 2008.
- G. Doorman, J. Barquin, L. Barroso, C. Batlle, A. Cruickshank, C. Dervieux, R. Flanagan, J. Gilmore, J. Greenhalg, H. Hoschle, P. Mastropietro, A. Keech, M. Krupa, J. Riesz, B. LaRose, S. Schwenen, G. Thorpe, K. De Vos, L. de Vries, and J. Wright, Capacity mechanisms: needs, solutions and state of affairs. CIGRE, 2016.
- K. Neuhoff, J. Diekmann, F. Kunz, S. Ruster, W. P. Schill, and S. Schwenen, "A coordinated strategic reserve to safeguard the European energy transition," Util. Policy, vol. 41, pp. 252-263, 2016. https://doi.org/10.1016/j.jup.2016.02.002
- P. C. Bhagwat, J. C. Richstein, E. J. L. Chappin, and L. J. de Vries, "The effectiveness of a strategic reserve in the presence of a high portfolio share of renewable energy sources," Util. Policy, vol. 39, pp. 13-28, 2016. https://doi.org/10.1016/j.jup.2016.01.006
- P. Cramton and S. Stoft, "A Capacity Market that Makes Sense," Electr. J., vol. 18, no. 7, pp. 43-54, Aug. 2005. https://doi.org/10.1016/j.tej.2005.07.003
- C. Byers, T. Levin, and A. Botterud, "Capacity market design and renewable energy: Performance incentives, qualifying capacity, and demand curves," Electr. J., vol. 31, no. 1, pp. 65-74, 2018. https://doi.org/10.1016/j.tej.2018.01.006
- C. Batlle, C. Vazquez, M. Rivier, and I. J. Perez-Arriaga, "Enhancing power supply adequacy in Spain: Migrating from capacity payments to reliability options," Energy Policy, vol. 35, no. 9, pp. 4545-4554, Sep. 2007. https://doi.org/10.1016/j.enpol.2007.04.002
- M. Hasani and S. H. Hosseini, "Dynamic assessment of capacity investment in electricity market considering complementary capacity mechanisms," Energy, vol. 36, no. 1, pp. 277-293, 2011. https://doi.org/10.1016/j.energy.2010.10.041
- H. Kim and S.-S. Kim, "The resource adequacy scheme in the Korean electricity market," Energy Policy, vol. 47, pp. 133-144, Aug. 2012. https://doi.org/10.1016/j.enpol.2012.04.035
- H. Kim and S.-S. Kim, "The optimal fuel mix and redistribution of social surplus in the Korean power market," Energy Policy, vol. 38, no. 12, pp. 7929-7938, Dec. 2010. https://doi.org/10.1016/j.enpol.2010.08.047
- A. Al-Sunaidy and R. Green, "Electricity deregulation in OECD (Organization for Economic Cooperation and Development) countries," Energy, vol. 31, no. 6-7, pp. 769-787, May 2006. https://doi.org/10.1016/j.energy.2005.02.017
- Korea Power Exchange, "Capacity Payments Redesign and the Introduction of a Capacity Market in the Korean Electricity Market," 2014.
- D. S. Kirschen and G. Strbac, Fundamentals of power system economics. 2004.
- M. J. Leppitsch and B. F. Hobbs, "The effect of NOx regulations on emissions dispatch: a probabilistic production costing analysis," IEEE Trans. Power Syst., vol. 11, no. 4, pp. 1711-1717, 1996. https://doi.org/10.1109/59.544632
- R. R. Booth, "Power System Simulation Model Based on Probability Analysis," IEEE Trans. Power Appar. Syst., vol. PAS-91, no. 1, pp. 62-69, 1972. https://doi.org/10.1109/TPAS.1972.293291
- K. Campbell, F. Murphy, and A. Soyster, "Estimating operational costs in an electric utility," Omega, vol. 10, no. 4, pp. 373-382, Jan. 1982. https://doi.org/10.1016/0305-0483(82)90016-0
- W. Kim, D. Chattopadhyay, and J. bae Park, "Impact of carbon cost on wholesale electricity price: A note on price pass-through issues," Energy, vol. 35, no. 8, pp. 3441-3448, 2010. https://doi.org/10.1016/j.energy.2010.04.037
- S. C. Bhattacharyya, Energy Economics. London: Springer London, 2011.
- R. Bellman, Dynamic programming. Dover Publications, 2003.
- Korea Power Exchance, "The 7th Basic Plan for Long-Term Electricity Supply-Demand," 2015.
- H. Kim, S. Lee, and W. Kim, "Impact of Maintenance Outage Rate Modeling on the Minimum Reserve Rate in Long-term Generation Expansion Planning," Trans. Korean Inst. Electr. Eng., vol. 66, no. 12, pp. 1712-1720, 2017. https://doi.org/10.5370/KIEE.2017.66.12.1712