References
- Faraz, A., Heuchenne, C., and Saniga, E. (2017). The np chart with guaranteed in-control average run lengths, Quality and Reliability Engineering International, 33, 1057-1066. https://doi.org/10.1002/qre.2091
- Gandy, A. and Kvaloy, K. J. (2013) Guaranteed conditional performance of control charts via bootstrap methods, Scandinavian Journal of Statistics, 40, 647-668. https://doi.org/10.1002/sjos.12006
- Jones, M. A. and Steiner, S. H. (2012) Assessing the effect of estimation error on risk-adjusted CUSUM chart performance, International Journal for Quality in Health Care, 24, 176-181. https://doi.org/10.1093/intqhc/mzr082
- Lee, J., Wang, N., Xu, L., Schuh, A., and Woodall, W. H. (2013). The effect of parameter estimation on upper-sided Bernoulli cumulative sum charts, Quality and Reliability Engineering International, 29, 639-651. https://doi.org/10.1002/qre.1413
- Montgomery, D. C. (2013). Statistical Quality Control: A Modern Introduction (7th ed.), John Wiley & Sons, NJ.
- Quesenberry, C. P. (1993). The effect of sample size on estimated limits for X and X control charts, Journal of Quality Technology, 25, 237-247. https://doi.org/10.1080/00224065.1993.11979470
- Saleh, N. A., Mahmoud, M. A., Jones-Farmer, L. A., Zwetsloot, I. N. E. Z., and Woodall, W. H. (2015a). Another look at the EWMA control chart with estimated parameters, Journal of Quality Technology, 47, 363-382. https://doi.org/10.1080/00224065.2015.11918140
- Saleh, N. A., Mahmoud, M. A., Keefe, M. J., and Woodall, W. H. (2015b). The difficulty in designing Shewhart X and X control charts with estimated parameters, Journal of Quality Technology, 47, 127-138. https://doi.org/10.1080/00224065.2015.11918120
- Xie, M., Lu, X. S., Goh, T. N., and Chan, L. Y. (1999). A quality monitoring and decision-making scheme for automated production processes, International Journal of Quality & Reliability Management, 16, 148-157. https://doi.org/10.1108/02656719910218238
- Yang, Z., Xie, M., Kuralmani, V., and Tsui, K. L. (2002). On the performance of geometric charts with estimated control limits, Journal of Quality Technology, 34, 448-458. https://doi.org/10.1080/00224065.2002.11980176
- Zhang, M., Peng, Y., Schuh, A., Megahed, F. M., and Woodall, W. H. (2013). Geometric charts with estimated control limits, Quality and Reliability Engineering International, 29, 209-223. https://doi.org/10.1002/qre.1304
- Zhao, M. J. and Driscoll, A. R. (2016). The c-chart with bootstrap adjusted control limits to improve conditional performance, Quality and Reliability Engineering International, 32, 2871-2881. https://doi.org/10.1002/qre.1971