DOI QR코드

DOI QR Code

Estimation of Travel Time in Natural River and Dam Outflow Conditions Considering Rainfall Conditions and Soil Moisture Accounting

강우조건과 토양함수상태를 고려한 자연하천과 댐 방류량 조건에서의 도달시간 산정

  • Received : 2018.06.29
  • Accepted : 2018.07.18
  • Published : 2018.08.01

Abstract

Determination of the time parameters such as the travel time in the design flood is very important. The travel time is mainly used for flood and river management, and the travel time of non flood season is used for maintenance flow and management of the river. Estimation of travel time for natural rivers is mainly based on the geomorphological factors of the basin. In addition to the topographical factors, the travel time is calculated by considering the factors of the runoff curve, velocity and rainfall intensity. However, there is no study on the estimation of travel time considering both the rainfall condition and the soil moisture accounting by the frequency period. Therefore, the travel time calculation is divided into the case of setting the Hwanggang Dam and the Imjin bridge water level station of Imjin river as the natural river considering rainfall condition by the frequency period and the soil moisture accounting, and the case of traveling the Imjin bridge water level station according to the condition of outflow of the Hwanggang Dam. For the sections set as natural rivers, the results were verified by comparing with the newly developed travel time calculation method. Based on the results, the travel times of the Hwanggang Dam outflow conditions were calculated. The time to travel in this study can be secured flood control of the Imjin river basin and time to prepare for danger when outflowing the the Hwanggang Dam.

설계홍수량 산정 시 도달시간과 같은 시간매개변수의 결정은 매우 중요한 요소이다. 도달시간은 주로 홍수 및 하천관리를 위해 이용되고 있으며, 평수기의 도달시간은 하천의 유지유량 및 이수관리를 위해 이용되고 있다. 자연하천에 대한 도달시간 산정은 주로 유역의 지형학적 인자를 기반으로 산정하고 있으며, 지형학적 인자 이외에 유출곡선지수, 유속, 강우강도의 인자를 고려하여 도달시간을 산정하고 있다. 그러나 재현기간별 강우조건과 토양함수상태를 함께 고려한 도달시간의 산정연구는 부재한 상황이다. 따라서 본 연구는 재현기간별 강우조건과 토양함수상태를 고려하여 임진강의 황강댐과 임진교 수위관측소 구간을 자연하천으로 설정한 경우와 황강댐의 방류량 조건에 따라 임진교 수위관측소에 도달하는 경우로 구분하여 도달시간을 산정하였다. 자연하천으로 설정한 구간에 대해서는 기 개발된 도달시간 산정방법과 비교 검토를 통해 결과를 입증하였으며, 이를 토대로 황강댐의 방류량 조건별 도달시간을 산정하였다. 본 연구에서 제시된 도달시간은 임진강 유역의 홍수관리와 황강댐 방류시 위험에 대비할 수 있는 시간을 확보할 수 있다.

Keywords

References

  1. Bedient, P. B. and Huber, W. C. (1988). "Hydrology and flood-plain analysis." Addison-Wesley Publishing Company, New York.
  2. Bedient, P. B. and Huber, W. C. (1992). "Hydrology and floodplain analysis."Addison-Wesley, Reading, Mass.
  3. Bell, F. C. and Omakar, S. (1969). "Characteristic response times in design flood estimation," Journal of Hydrology, Vol. 8, pp. 173-196. https://doi.org/10.1016/0022-1694(69)90120-6
  4. Brasil, L. E. and Hudlow, M. D. (1980). "Calibration procedures used with the national weather service river forecast system," Water and related Land Resource Systems, Cleveland, Ohio, pp. 457-466.
  5. Jeong, J. H., Keum, J. H. and Yoon, Y. N. (2002). "Development of estimation method for travel time."Journal of Korean Water Resources Association, Vol. 35, No. 6, pp. 715-727 (in Korean). https://doi.org/10.3741/JKWRA.2002.35.6.715
  6. Kim, D. P. (2018). Analysis of the influence on downstream runoff due to upstream dam operation of the Imjin river, Ph.D. Dissertation, Dept. of Civil Engineering, Chungbuk National University, Cheongju, Korea (in Korean).
  7. Korea Institute of Civil Engineering and Building Technology (KICT). (1994). Determination of hydraulic and hydrological factors for the forecasting of flood runoff - focused on Clark and Nash methods -, No. 94-WR-113 (in Korean).
  8. Korea Water Resources Association (KWRA). (2009). River design standard.commentary (in Korean).
  9. McCuen, R. H., Wong, S. L. and Rawls, W. J. (1984). "Estimation urban time of concentration." Journal of Hydrology, ASCE, Vol. 110, No.7, pp. 887-904.
  10. Ministry of Land, Transport and Maritime Affairs (MLTM). (2011). Improvement and Supplementation of Probability Rainfall, No. 11-1611000-001995-01 (in Korean).
  11. National Institute for Disaster Prevention (NIDP). (2013). (Development of technology for reducing damages of small river facilities based on real experiments) quantification of design element for reduction in small river damage, No. 11-1312184-000031-01 (in Korean).
  12. Pilgrim, D. H. (1966). "Radioactive tracing of storm runoff on a small catchment: 1. experimental technique." Journal of Hydrology, Vol. 4, pp. 289-305. https://doi.org/10.1016/0022-1694(66)90094-1
  13. SCS. (1975). "Urban hydrology for small watersheds, technical release, No. 55." Soil Conservation Service, U.S. Department of Agriculture.
  14. Singh, V. P. (1976). "Derivation of time of concentration." Journal of hydrology, Vol. 30, issues 1-2, pp. 147-165. https://doi.org/10.1016/0022-1694(76)90095-0
  15. STRM, http://srtm.csi.cgiar.org. (Accessed: June 21, 2018)
  16. Tabios III, G., Obeysekera, J. T. and Salas, J. D. (1986). "National Weather Service Model : PC version, program and manual." assembled by Hydrology and Water Resources Program, Colorado State University, Fort Collins, Colorado, pp. 1-137.
  17. Yoo, D. H., Kim, J. H., Lee, M. H. and Lee, S. H. (2011). "The time of concentration considering the rainfall intensity."Journal of Korean Water Resources Association, Vol. 44, No. 7, pp. 591-599 (in Korean). https://doi.org/10.3741/JKWRA.2011.44.7.591