References
- S. Y. Oh, S. H, Park, Y. Park, H. Y. Cho, J. T, Song, "Analysis of dynamic/electric characteristic assessment system implementation technology for overhead contact lines", Fall conference of the Korean Society for Railway, pp. 1174-1179, 2009.
- Y. Park, K. Lee, S. Y. Park, J. Y. Park, W. S. Choi, "Implementation of Multi-functional Type Condition Monitoring System for Railway Catenary Systems", The Transactions of the Korean Institute of Electrical Engineers, vol. 64, no. 9 pp. 1406-1410, 2015. https://doi.org/10.5370/KIEE.2015.64.9.1406
- Y. Park, S. K. Shin, K. Lee, J. Kim, W. Kim, "Analysis of Current Collection Performance using Real-time Measurement of Current for Overhead Contact Line on the Track-side", The Transactions of the Korean Institute of Electrical Engineers, vol. 62, no. 4, pp. 573-576, 2013. https://doi.org/10.5370/KIEE.2013.62.4.573
- H. J. Park, Y. Park, H. S. Jung, H. C. Kim, "A Comparative Study on the Railway Electricity Maintenance Management", Fall conference of the Korean Society for Railway, pp. 1202-1207, 2011.
- Gao S.B, Liu Z, G. Yu L, "Detection and Monitoring System of the Pantograph-Catenary in High-speed Railway (6C)", International Conference on Power Electronic System and Application, pp. 1-7, 2017. 12.
- K. S. Yoo, C. H. Lee, G. Y. An, J. T. Kim, "Investigation of Effective Maintenance System for the Infra on the Conventional Line Prepared for the Tilting Train Service", Fall conference of the Korean Society for Railway, pp. 79-87, 2008.
- G. H. Jang, (2015), "A study on the Optimization for Automatic Inspection System of Catenary", Ph.D. Thesis, Woosong University, Daejeon, Republic of Korea, 151 pages.
- S. G. Song, "Development of Catenary Stagger and Height Measurement System using Laser", The Transactions of the Korean Institute of Electrical Engineers, vol. 11, no. 6, pp. 569-574, 2008. 12.
- KRTS-VE-Part1-2016(R1), Minister of Land, Infrastructure and Transport, 2016.
- Y. Park, K. Lee, S. Y. Kwon, C. M. Park, J. K. Kim, W. S. Choi, "Analysis of Percentage of Arcing between Pantograph and Overhead Contact Line as a Function of Duration of Arc", The Transactions of the Korean Institute of Electrical Engineers, vol. 63, no. 6 pp. 855-859, 2014.6. https://doi.org/10.5370/KIEE.2014.63.6.855
- Y. M. Gimm, Y. J. ju, J. S. Yoo, B. C. Koo "Measurement of EMI by High-Speed Train System", Spring Conference of the Korean Society for Railway, pp. 1157-1162, 2008. 11.
- IEC 62486:2010, "International Standard, Railway applications-Current collection systems-Technical criteria for the interaction between pantograph and overhead line", 2010.
- Y. Park, Y. H. Cho, S. Y. Kwon, K. W. Lee, W. You, "Development of an Arc Detector Assessment System by Loss of Contact Between Pantograph and Contact Wire in Electric Railway", The Transactions of the Korean Institute of Electrical Engineers, vol. 60, no. 11, pp. 2171-2175, 2011. https://doi.org/10.5370/KIEE.2011.60.11.2171
- K. M. Na, Y. Park, Y. H. Cho, S. Y. Kwon, K. Lee, W. You, "Analysis of Current Collect Performance Depending on Installation Condition of Overhead Contact Line in Suseo High Speed Line", The Transactions of the Korean Institute of Electrical Engineers, vol. 66, no. 4, pp. 727-732, 2017. 04. https://doi.org/10.5370/KIEE.2017.66.4.727
- UIC799-2002 Characteristics of a.c. overhead contact systems for high-speed lines worked at speeds of over 200 km/h. 2002