Abstract
This study is conducted to improve the manufacturing process of the modular construction method, which is a pre-fabricated construction method recognized for its advantage on the shortening of construction time. This study first identified the factors that result in shortening of pre-fabrication processes in the current module-processing factory. In addition, those identified factors were further considered for installing the M.E.P. system that is being outsourced on the main module in the production line. A manufacturing process of the construction modules, which considers installation of a M.E.P. system most suitable for shortening the time on the outsourcing of modular construction, is introduced throughout the research. Furthermore, this study suggests the factors in need of improvement during design phase of modular construction and improvement measures to consider the quality of unit modules by focusing on the module parts that are most exposed to defects.
공기를 획기적으로 감소시킬 수 있는 모듈러건축으로 유사 모듈이 반복되는 공동주택을 건설하는 안에 대해 현행의 시공방법을 고찰한 결과 설비시스템에서 개선할 점을 발견하고, 그 방법으로 공장제작과 현장설치부분을 구분해서 살펴보고 현재 모듈러생산사 실무진의 의견과 종합건설사 기술담당자의 의견으로 그 가능성을 확인하고자 했으며 그 과정에서 제기된 문제에 대해 원천적인 관점에서 쉽게 풀어나갈 수 있는 방법으로 유리한 설계안을 제안하였고, 접속부위의 누수하자와 같은 고질적 문제점에 대한 대안을 기재하였다.