References
- Ahn, B. J., Yang, J. Y., Baik, J. K., and Kim, J. J. (2003). "Developing a Transportation and Procurement System for Curtain-Wall Materials focused on JIT Management." Journal of the Architectural Institute of Korea Structure & Construction, 19(8), pp. 153-162.
- Alvanchi, A., Azimi, R., Lee, S., AbouRizk, S. M., and Zubick, P. (2011). "Off-site construction planning using discrete event simulation." Journal of architectural engineering, 18(2), pp. 114-122. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000055
- Boyd, N., Khalfan, M. M., and Maqsood, T. (2012). "Off-site construction of apartment buildings." Journal of architectural engineering, 19(1), pp. 51-57. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000091
- Chehayeb, N. N., and AbouRizk, S. M. (1998). "Simulation-based scheduling with continuous activity relationships." Journal of Construction Engineering and Management, 124(2), pp. 107-115. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:2(107)
- Cho, C. Y., Cho, M. Y., and Shin, Y. S. (2012). "Prediction Model for Hoisting Times of Tower Crane using Discrete-Event Simulation in High-rise Building Construction." Journal of the Architectural Institute of Korea Structure & Construction, 28(1), pp. 151-158. https://doi.org/10.5659/JAIK_SC.2012.28.1.151
- Generalova, E. M., Generalov, V. P., and Kuznetsova, A. A. (2016). "Modular buildings in modern construction." Procedia Engineering, 153, pp. 167-172. https://doi.org/10.1016/j.proeng.2016.08.098
- Halpin, D. W. (1973). "An investigation of the use of simulation networks for modeling construction operations." Ph.D. Thesis, University of Illinois at Urbana-Champaign, IL, USA.
- Han, S. H., Hasan, S., Bouferguene, A., Al-Hussein, M., and Kosa, J. (2014). "Utilization of 3D visualization of mobile crane operations for modular construction on-site assembly." Journal of Management in Engineering, 31(5), 04014080. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000317
- Kamali, M., and Hewage, K. (2016). "Life cycle performance of modular buildings: A critical review." Renewable and Sustainable Energy Reviews, 62, pp. 1171-1183. https://doi.org/10.1016/j.rser.2016.05.031
- Kim, K. J. (2000). "A Study for the Implementation of Self-controlling Resource Model in the Simulation of Heavy Construction Operations." Journal of The Korean Society of Civil Engineers, 20(4D), pp. 389-402.
- Kim, S. (2002). Business simulation. Hankyungsa.
- Kim, S., Kim, S., Jean, J., and An, S. H. (2016). "Optimization of T/C Lifting Plan using Dependency Structure Matrix (DSM)." Journal of the Korea Institute of Building Construction, 16(2), pp. 151-159. https://doi.org/10.5345/JKIBC.2016.16.2.151
- Kim, S. W., and Choe, M. K. (2010). "A Study on the Lifting Progress Character Tributary for the Construction Materials Moving Method." Journal of the Regional Association of Architectural Institute of Korea, 12(1), pp. 199-206.
- Korea Institute of Civil Engineering and Building Technology (KICT). (2016). 2017 Standard of Construction Estimate, Seoul: Korea Institute of Civil Engineering and Building Technology.
- Lawson, R. M., Ogden, R. G., and Bergin, R. (2011). "Application of modular construction in high-rise buildings." Journal of architectural engineering, 18(2), pp. 148-154. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000057
- Lawson, R., and Ogden, R. (2010). "Sustainability and process benefits of modular construction." Proceedings of the 18th CIB World Building Congress, TG57-Special Track, Salford, UK.
- Lee, H. S., Chae, H., and Jang, M. H. (2002). "Development of Tower Crane Planning Process in High-rise Building Projects." Journal of the Architectural Institute of Korea Structure & Construction, 18(6), pp. 119-126.
- Lee, K. B., Kim, K. R., Shin, D. W., and Cha, H. S. (2011). "A proposal for optimizing unit modular system process to improve efficiency in off-site manufacture, transportation and on-site installation." Korean Journal of Construction Engineering and Management, KICEM, 12(6), pp. 14-21. https://doi.org/10.6106/KJCEM.2011.12.6.14
- Leung, A. W., and Tam, C. (1999). "Models for assessing hoisting times of tower cranes." Journal of Construction Engineering and Management, 125(6), pp. 385-391. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:6(385)
- Li, H., Chan, N. K., and Skitmore, M. (2012). "The use of virtual prototyping to rehearse the sequence of construction work involving mobile cranes." Construction Innovation, 12(4), pp. 429-446. https://doi.org/10.1108/14714171211272207
- Martinez, J. C. (1996). "STROBOSCOPE : State and Resource Based Simulation of Construction Processes." Ph.D. Thesis, The University of Michigan, Ann Arbor, MI, USA.
- Modular Building Institute (MBI). (2015). Permanent modualr construction 2015 annual report.
- Mohsen, O. M., Knytl, P. J., Abdulaal, B., Olearczyk, J. , and Al-Hussein, M. (2008). "Simulation of modular building construction." Proceedings of the 40th Conference on Winter Simulation.
- Neelamkavil, J. (2009). "Automation in the prefab and modular construction industry." The 26th Symposium on Construction Robotics ISARC.
- Olearczyk, J., Al-Hussein, M., and Bouferguene, A. (2014). "Evolution of the crane selection and on-site utilization process for modular construction multilifts." Automation in Construction, 43, pp. 59-72. https://doi.org/10.1016/j.autcon.2014.03.015
- Olearczyk, J., Al-Hussein, M., Bouferguene, A., and Telyas, A. (2009). "Virtual construction automation for modular assembly operations." Construction Research Congress 2009 : Building a Sustainable Future.
- Pritsker, A. A. B. (1986). Introduction to stimulation and Slam II. West Lafayette, Indiana: Systems Publishing Corp.
- Shin, S. H., and Kim, K. H. (2009). "Hoist Scheduling Chart and Lifting Load Leveling Method for Applying JIT(Just-In-Time) in Construction." Journal of the Architectural Institute of Korea Structure & Construction, 25(2), pp. 149-157.
- Smith, R. E. (2011). Prefab architecture: A guide to modular design and construction : John Wiley & Sons.
- Tantisevi, K., and Akinci, B. (2008). "Simulation-based identification of possible locations for mobile cranes on construction sites." Journal of computing in civil engineering, 22(1), pp. 21-30. https://doi.org/10.1061/(ASCE)0887-3801(2008)22:1(21)
- Tubaileh, A. (2016). "Working time optimal planning of construction site served by a single tower crane." Journal of Mechanical Science and Technology, 30(6), pp. 2793-2804. https://doi.org/10.1007/s12206-016-0346-8
- Yang, K., Lee, H. S., Park, M., Jung, M., and Hwang, S. (2013). "A study of the tower crane hoisting time estimation simulation model with climate element for the high-rise building construction." Korean Journal of Construction Engineering and Management, KICEM, 14(2), pp. 96-107. https://doi.org/10.6106/KJCEM.2013.14.2.096